Police Housing Corporation Limited Tender

... More
The Police Housing Corporation Limited has issued a formal invitation for competitive bids for Construction Of Sub Treasury Office Building At Alair Of Yadadri Bhonagir District. in Yadadri Bhuvanagiri, Telangana, with an estimated contract value of Rs. 84,06,028. The bid opening date for this tender is 20-05-2025 and the last date for bid submission is 03-06-2025. Interested bidders for Police Housing Corporation Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Police Housing Corporation Limited Tender

Works
Civil And Construction
Building Construction
Opening Date20 May 2025
Closing Date3 Jun 2025
Tender Amount₹ 84,06,028 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR SIDE WALLS 230 MM

8

14902

119218.4

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Fixing of LED street light luminary with 1.0 Mtr., 25mm Nominal Bore Medium grade G.I.Pipe bracket and anti tilting MS flat etc., including giving connections and labour charges etc., complete but excluding GST.

2

694

1388.94

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply of 8" (200 mm) RPM BLDC exhaust fan with necessary accessories etc., complete but excluding GST. Make : Atomberg / Crompton / Havells / Orient.

4

2754

11016.12

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;EARTH WORK EXCAVATION FOR FOUNDATIONS AND DEPOSITING ON BANK, FOR ALL LIFTS AND WITH AN INITIAL LEAD OF 10M INCLUDING ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS SHORING, SHEETING, PLANKING, STRUTTING, DEWATERING SITE CLEARANCE, CLEARING SHURBS, BRUSHWOOD, UNDER GROWTH AND SMALL TREES NOT EXCEEDING 300 MM GIRTH, MEASURED AT ONE METRE ABOVE GROUND ETC., COMPLETE FOR FINISHED ITEM OF WORK INCLUDING DEWATERING CHARGES ETC AS PER SS - 20 B FOR STIFF BLOCK COTTON SOIL , HARD RED EARTH, MURRAM, ORDINARY GRAVEL - MANUAL MEANS UP TO 3M DEPTH - FOUNDATION OF COMPOUND WALL - EXCLUDING GST (APSS 308).

150

499

74910

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING CENTERING WITH STEEL PLATES, SHUTTERING, VIBRATING, CURING ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR FINISHED ITEM OF WORK. FOR FOOTINGS. (APSS NO. 403)

15

12416

186244.5

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Labour charges for fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete but excluding GST.

8

245

1960.96

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;CEMENT CONCRETE (1:4:8) PROP. USING 40MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR FOUNDATIONS .(APSS NO: 402).

3

5965

17895.6

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and run of 3 of 4.0 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694 / 2010, IS 17048 specification for Copper cable in existing pipe for 2 runs of mains & 1 run of earth continuity inlcuding all labour charges etc., complete but excluding GST. Make: Finolex / RR kabel / Havells / Polycab.

150

268

40221

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;RCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL), LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK - FOR SUNSHADES OF 50MM AVERAGE THICK INCLUDING DRIP COURSE OF SIZE 40MM WIDE X 20MM HEIGHT IN CEMENT MORTAR (1:4)PROP FOR GROUND FLOOR (APSS NO. 403)

8

1149

9198.4

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. with sponze finishing, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE.FOR FINISHED ITEM OF WORK. GROUND FLOOR (APSS NO: 901&904)

680

572

389232

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PROVIDING "HYSD/TMT" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER Fe 500 GRADE (AS PER IS 1786 - 2008 AND ALL ITS LATEST AMMENDMENTS) FROM Reinforcement Steel (HYSD/TMT) from steel Manufactureres within Telangana with min integrated installed Production Capacity of 2 Lakh MT per annum like AF Star TMT/MS Life TMT, Radha TMT, Sugna TMT FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED.

10

78483

784830

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND FIXING IN POSITION OF STAIRCASE RAILING AS PER DRAWING USING STAINLESS STEEL TUBES, SECTIONS, PLATES SHEETS & PIPES OF ALL DIAMETERS OF 304 GRADE INCLUDING LABOUR CHARGES FOR FABRICATION OF STAINLESS STEEL RAILING WORKS USING STAINLESS STEEL WELDING RODS INCLUDING BUFFING, POLISHING, LACQUER FINISHING, TO PRESENT SEAMLESS FINISH ETC., COMPLETE AS DIERCTED BY THE ENGINEER-IN-CHARGE FOR FINISHED ITEM OF WORK.

150

768

115275

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;FLOORING WITH HIGH POLISHED GRANITE SLABS 16 TO 18MM THICK UPTO 8'-00"(2.43M) OTHER THAN BLACK REGULAR COLOUR SET OVER BASE COAT OF CEMENT MORTAR (1:8), 20 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILESETC., COMPLETE, , LABOUR CHARGES FOR DRESSING OF TILES ETC.,BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR

30

4758

142740

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND FIXING 75 MM DIA UV RESISTANT UPVC SWR COWL AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

5

20

102.5

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLY AND FIXING OF 28.60MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

50

284

14200

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PROVIDING AND FIXING FACTORY MADE SOLID WOOD POLYMER COMPOSITE (WPC) SINGLE EXTRUDED DOOR FRAME SECTION OF 100*65 MM WITH ENCAPSULATION OF 6 MM RIGID LAYER ON ALL EXTERNAL SURFACES. THE DOOR FRAME WILL HAVE A REBATE OF 32MM/ 37 MM. THE TWO VERTICAL MEMBERS ARE TO BE JOINED TOGETHER WITH THE HORIZONTAL MEMBER USING 8X75 MM LONG MS STAR FULL THREAD SCREWS TO BE USED WITH REVERSE FORWARD SPEED CONTROL HAND DRILLING MACHINE THE READY/ASSEMBLED DOOR FRAME IS FIXED TO WALL USING Z HAND FAST 300 MM LONG HOLD FAST BUT EXCLUDING GST

35

882

30898

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PROVIDING IMPERVIOUS COAT TO EXPOSED RCC ROOF SLAB SURFACE IN CM(1:3), 20MM THICK WITH 1KG OF WATER PROOF COMPOUND PER BAG OF CEMENT LAID OVER ROOF WHEN IT IS GREEN, INCLUDING COST OF ALL MATERIALS, COST & CONVEYANCE OF ALL MATERIALS, INCIDENTAL, OERATIONAL AND LABOUR CHARGES FOR MIXING MORTAR, LAYING, RENDERING SMOOTH AND THREAD LINING, CURING, ROUNDING OFF JUNCTIONS OF WALL AND SLAB ETC,, BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. SEPTIC TANK (APSS.NO: 901&903)

60

633

38028

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;FLOORING WITH SUPPLY OF NON-SKID RED OR WHITE FULL BODY CERAMIC FLOOR TILES OF SIZE 300 X 300 MM AND THICKNESS BETWEEN 7-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS OR AS APPROVED BY THE ENGINEER - IN -CHARGE ,OF APPROVED PATTERN FOR FLOORING SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES, INCLUDING LIFTING (MANUAL) AND ALL LABOUR CHARGES, ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK, FOR GROUND FLOOR (APSS.NO:701&707).

15

990

14850

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLY AND FIXING OF 54.00 MM OD PIPE - SDR 13.5 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 13.5 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

20

655

13112

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR SINGLE TEE (WITH DOOR) AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

7

146

1026.2

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND FIXING 75 MM DIA UV RESISTANT UPVC SWR PLAIN BEND 87.5 DEGREES AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

5

69

346.5

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND LAYING 75 MM DIA SINGLE SOCKET PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND LABOUR CHARGES FOR LAYING, FIXING, AND COMMISSIONING THE PVC PIPES INCLUDING COUPLERS/ BENDS/TEES ETC., INCLUDING FIXING NECCESSARY FITTINGS LIKE BENDS, PLUGS, COUPLERS, JUNCTIONS, TEES ETC., WITH SOLVENT JOINTING AS PER STANDARDS INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST , COMPLETE FOR FINISHED ITEM OF WORK -FOR SEPTIC TANK

2

285

571

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , SHUTTERING, CURING ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR FINISHED ITEM OF WORK. FOR GRADE WALL OF 230MM THICK. (APSS NO. 403)

7.5

15817

118628.25

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLY AND FIXING OF 15.90MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

10

196

1966

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and fixing of Modular co-Axial socket type TV Antenna outlet on 2 moduler hot dip galvanized metal box and 2 modular cover frame including giving connections, cost of all accessories and labour charges etc. Complete. co-Axial socket type TV Antenna outlet, cover frame &metal box makes: Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus.

2

357

715.08

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and run of 2 Pair, 0.5mm telephone copper wire in existing PVC conduit including cost and conveyance of all materials and labour charges etc., complete but excluding GST. Makes: Finolex / Delton / Surabi / Polycab.

200

27

5554

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PANNELED DOUBLE SHUTTER DOOR : MANUFACTURING,SUPPLYING AND FIXING OF PANNELED DOOR SHUTTER USING MEDIUM TEAKWOOD STYLES & TOP RAILS OF SIZE 100 X 35 MM,BOTTOM AND LOCK RAIL OF SIZE 150 X 35MM, PANNELS OF 20MM THICK INCLUDING SUPPLYING AND FIXING OF THE DOOR FRAME OF SIZE 1.20 X 2.10 M MADE WITH MEDIUM TEAK WOOD SCANTLINGS OF OF SIZE 125 X 75 MM INCLUDING 6 NOS. OF MS 'Z' HOLD FASTS OF 40X5 MM FLAT OF 230MM LONG EACH,INCLUDING 8 NOS. OF 125 MM M.S POWDER COATED BUTT HINGES, 2 NO.BRASS HEAVY DOOR STOPER, 2 NO. 200 MM LONG BRASS FANCY DOOR HANDLES , 2 NO. BRASS ALDROP OF SIZE 300 MM LONG , 4 NOS. OF 200 MM LONG BRASS TOWER BOLTS, WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, TRANSPORTATION TO SITE LABOUR CHARGES FOR MAKING AND FIXING FRAME AND SHUTTER INCLUDING EXTRA MINOR FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF BRASS , STANDARD MAKE, GOT APPROVED BY THE ENGINEER-IN-CHARGE) (APSS NO: 1001 & 1002) BUT EXCLUDING GST

3.5

11461

40114.19

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING & FIXING INDIAN MAKE FLAT BACK WASH HAND BASIN 1ST QUALITY CONFORMING TO IS:2556-PART-4:1972 WITH WASTE FITTINGS LIKE RUBBER PLUG, CHAIN, 32 MM NOMINAL SIZE C.P. FITTING WITH PARALLEL PIPE THREAD CONFORMING TO IS:2963-1979 AND FITTED WITH 15 MM NOMINAL BORE CHROMIUM PLATED PILLAR TAP OF 1ST QUALITY INDIAN MAKE 400 GRAMS COMPLETE WITH STANDARD CI BRACKETS INCLUDING WOODEN BLOCK: 550 X 400 MM - SINGLE C.P. PILLAR COCK AS APPROVED BY EXECUTIVE ENGINEER WITH WASTE FITTINGS LIKE RUBBER PLUG, CHAIN, AND PAINTING TO ALL IRON FITTINGS WITH 2 COATS OF SYNTHETIC ENAMEL PAINT OF APPROVED COLOUR AND MAKE INCLUDING CUTTING THE WALLS WHEREVER NECESSARY AND MAKING THE SAME GOOD FOR FINISHED ITEM OF WORK. INCLUDING WOODEN BLOCK INCLUDING CUTTING THE WALLS WHEREVER NECESSARY AND MAKING THE SAME GOOD. BUT EXCLUDING GST., FOR FINISHED ITEM OF WORK

5

2783

13919

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PROVIDING IMPERVIOUS COAT TO EXPOSED RCC ROOF SLAB SURFACE IN CM(1:3), 20MM THICK WITH 1KG OF WATER PROOF COMPOUND PER BAG OF CEMENT LAID OVER ROOF WHEN IT IS GREEN, INCLUDING COST OF ALL MATERIALS, COST & CONVEYANCE OF ALL MATERIALS, INCIDENTAL, OERATIONAL AND LABOUR CHARGES FOR MIXING MORTAR, LAYING, RENDERING SMOOTH AND THREAD LINING, , CURING, ROUNDING OFF JUNCTIONS OF WALL AND SLAB ETC, BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR (APSS.NO: 901&903)

150

633

95070

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND FIXING MS GRILLS FOR WINDOWS/VENTILATORS OF ALL SIZES AS DIRECTED BY THE ENGINEER-IN- CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES FOR FABRICATION, FIXING BUT EXCLUDING GST . COMPLETE FOR FINISHED ITEM OF WORK M.S. SQUARE BARS of ALL SIZES

250

128

32025

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND FIXING 75 MM DIA UV RESISTANT UPVC SWR DOOR BEND 87.5 DEGREES AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

2

92

184

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PROVIDING AND PLACING ON TERRACE POLYTHELENE WATER STORAGE TANKS (AT ALL FLOOR LEVELS) DOUBLE LAYER APPROVED BRAND AND MNUFACTURE WITH COVER AND SUITABLE LOCKING ARRANGEMENTS MAKING NECESSARY HOLES FOR INLET & OUTLETS AND OVERFLOW PIPES BUT WITHOUT FITTINGS & BASE SUPPORT FOR TANKS, MAKING GOOD THE SAME TO ENSURE LEAK PROOF WITH AN APPROPRIATE MASONARY PLATFORM INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK AS DIRECTED BY THE ENGINEER -IN- CHARGE

2000

11

22800

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and run of 3 of 6.0 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694 / 2010, IS 17048 specification for Copper cable in existing pipe for 2 runs of mains & 1 run of earth continuity inlcuding all labour charges etc., complete but excluding GST. Make: Finolex / RR kabel / Havells / Polycab.

10

364

3649.4

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and transportation of 18 W +/-10% (>= 1800 Lumens) back lit LED Down Light Recessed / Surface mounting round / square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 5 years warranty with BIS Certification but excluding GST. LUMINAIRE MAKE : Crompton / Havells / Jaquar. LED MAKE : CREE / NICHIA / OSRAM.

12

1704

20450.76

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply of 4 Way VTPN DB with IP 43 Protection as per IS:13032 and suitable for accommodating TP / DP as out goings and 125A / 160A 4 pole MCCB as Incomer with 250A tinned copper busbar, neutral bar, earth bar and cable ties for cable management, fully shrouded neutral bar, profile blanking modules for unused MCB ways, din bars and detachable gland plate etc., complete with interconnections but excluding GST. Incommer: 125A 4 Pole MCCB, 25kA - 1No. Outgoing: 63A 10KA TP MCB C/D Curve ISI - 3 Nos. 40A 10kA SP C/D Curve ISI - 3 Nos. DB Makes : Legrand / Schneider / Siemens / LK (L&T). MCCB Make: L&T- D sine / Legrand-DP X3/ Siemens-3VL. MCB Make: Legrand-DX3 / Siemens / L&T Exora.

1

45511

45511.9

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Wiring with 2 runs of 1.5 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694/2010, IS 17048 specification for Copper cable in existing pipe with 6A / 10A 1 Way 1 Module Modular Switch control with suitable Module Hot Dip Galvanized modular type Metal Box covered with suitable Modular Cover Frame, with 3 Plate Jumbo Ceiling Rose including all labour charges etc., complete for light and bell points in Non-Residential Buildings but excluding GST. Copper cable Make: Finolex / RR kabel / Havells / Polycab. Modular Switch, Socket, Metal box & Cover frame Make: Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus. Ceiling Rose Make: Gold Medal Olive / Million Zoom / Anchor Penta Cherry.

24

1052

25257.12

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR GROUND FLOOR SLABS 125MM THICK (APSS NO.403).

20

12288

245778

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND FIXING 15MM BRASS BIB TAP CP FINISH - INDIAN MAKE HEAVY DUTY FULL TURN 300GMS AS DIRECTED BY THE ENGINEER-IN-CHARGE, INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

4

328

1314.4

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND FIXING 75 MM DIA UV RESISTANT UPVC SWR SINGLE TEE (WITH DOOR) AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

20

80

1614

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PLAIN CEMENT CONCRETE (1:4:8) PROP. USING 20MM GRADED HARD GRANITE MACHINE CRUSHED METAL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, CENTERING, MACHINE MIXING, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR CHARGES ETC.,BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE FOR FINISHED ITEM OF WORK. DUMMY COLUMNS IN FIRST FLOOR (APSS NO: 402).

2

6182

12364.2

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PAINTING TO NEW IRON WORK WITH ONE COAT OF RED OXIDE PRIMER COAT AND TWO COATS WITH SYNTHETIC ENAMEL PAINT OF APPROVED BRAND AND SHADE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR PREPARING AND CLEANING THE SURFACE OF DIRT WITH SOAP AND BRUSHES INCLUDING PUTTY, ALL INCIDENTAL, OPERATIONAL CHARGES ETC., COMPLETE (THE RATE INCLUDES TWO COATS OF PAINT AND ONE COAT PRIMER) BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK IN ALL FLOOR. (APSS NO.1201, 1207, 1212)

30

231

6942

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PROVIDING, SUPPLYING & FIXING OF FIXED LOUVERED VENTILATOR MADE OUT OF MULTI CHAMBERED UPVC SECTIONS WITH GLAZING BEAD SHALL BE CO-EXTRUDED WITH GREY COLOUR SOFT PVC. HAVING ISOLATED DRAINAGE AND REINFORCED WITH GALVANIZED IRON PROFILES THROUGHOUT THE WINDOW. THE OUTERFRAME HAVING AN OVERALL SIZE OF 60 MM X 55 MM X 2.40 WITH REINFORCEMENT OF 1 MM THICKNESS ANDMULLION WITH OVERALL SIZE OF 74 MM X 60 MM X 2.40 MM WITH REINFORCEMENT OF 1 MM THICKNESS. (COMPOSITION OF PROFILE SHALL CONSISTS A MINIMUM OF 5.5 PHR OF TIO2 AND NOT MORE THAN 12 PHR OF CACO3 FOR EVERY 100 PARTS OF PVC RESIN).VENTILATOR SHALL BE PROVIDED WITH 4.5 MM PIN HEAD GLASS, STANDARD HARDWARE. WALL THICKNESS OF FRAME & MULLION SHALL BE 2.4 MM., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, ACCESSORIES, LABOUR CHARGES FOR TRANSPORTATION, ERECTION AT SITE BUT EXCLUDING GST COMPLETE FOR FINISHED ITEM OF WORK.

1

7279

7279.3

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE, INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING CENTERING WITH STEEL PLATES, SHUTTERING, VIBRATING, CURING ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR FINISHED ITEM OF WORK.FOR PEDESTALS (APSS NO. 403)

2.6

13155

34205.34

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;S&F OF 15 MM PREMIUM VARIETY CHROMIUM PLATED FINISH BRASS BODY WALL MIXER WITH HAND SHOWER WITH A PROVISION FOR OVER HEAD SHOWER WITH 115 MM LONG BEND PIPE ON UPPER SIDE, CONNECTING LEGS & WALL FLANGES CONFORMING TO IS 8931 WITH 10 YEARS WARRANTY ,INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK

4

4616

18465.6

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and fixing of Cat 6 RJ-45 information outlets including duel face plate on 2 moduler hot dip galvanized metal box including giving connections, cost of all accessories and labour charges etc., complete but excluding GST. I/O & duel face plate Makes: D Link / AMP / Molex / Legrand / Krone. Metal box make: Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus.

10

657

6573.1

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;CEMENT CONCRETE (1:4:8) PROP. USING 40MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR FOUNDATION OF COMPOUND WALL .(APSS NO: 402).

40

6064

242576

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and fixing of ISI 25mm outer dia heavy grade with IS:9537 part 3 rigid PVC pipe concealed in wall with all required accessories [like 'U' nails, Junction box, PVC Bends and Cement] including masonary work for light, fan, common, separate plug point and switch/power boards etc., including all labour charges etc., complete but excluding GST. Makes: Sudhakar / Modi / VIP.

250

133

33465

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND FIXING MS GRILLS FOR WINDOWS/VENTILATORS OF ALL SIZES AS DIRECTED BY THE ENGINEER-IN- CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES FOR FABRICATION, FIXING BUT EXCLUDING GST. COMPLETE FOR FINISHED ITEM OF WORK M.S.FLATS of ALL SIZES

100

134

13400

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLY AND FIXING GYP BOARD SUSPENDED REGULAR SINGLE LAYER FALSE CEILING (GS-MFSC-4.1 AS PER INDIA GYPSUM) USING 12.50 MM THICK GYP BOARD CONFORMING TO IS 2095-1982 FIXING TO GYP STEEL GI PERIMETER CHANNELS OF SIZE 20 X 27 X 30 MM (WEB) OF 0.55 MM THICK ALONG THE PERIMETER OF CEILING SCREW FIXED TO BRICK WORK / PARTITION AT 610 MM C/C AND SUSPENDING THE FRAME WORK USING INTERMEDIATE CHANNELS (45 X 15 X 15 X 0.90 MM) FROM SOFFIT AT 1220 MM C/C WITH CEILING ANGLE (25 X 10 X 0.55 MM) FIXED WITH GI CLEAT AND STEEL EXPANSION FASTENERS & CONNECTING CLIP TO THE CEILING CHANNELS (WITH KNURLED WEB OF 51.50 X 26 X 10.50 X 0.55 MM) FIXED IN DIECTION PERPENDICULAR TO THE INTERMEDIATE CHANNEL AT 457 MM C/C AND FIXING THE 12.50 MM DRYWALL SCEWS AT 230 MM C/C & JOINTING, FIXING USING JOINT COMPOUND AND PAPER TAPE TO HAVE A FLUSH LOOK INCLUDING FILLING THE TAPPERED & SQUARE EDGES WITH JOINTING COMPOUND, TWO COATS OF DRYWALL TOPCOAT COMPLETE FOR FINISHED ITEM OF WORK AS PER INDIA GYPSUM LTD., SPECIFICATION.

100

1311

131100

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and run of LAN Cable cat - 6 UTP cable in existing PVC conduit including cost and conveyance of all materials and labour charges etc., complete but excluding GST. Makes: D Link / AMP / Molex / Legrand / Krone.

200

47

9564

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply, Transportation of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current (BLDC) motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.0, Air delivery minimum 235 CMM, 350 RPM (tolerance as per IS:374-2019), THD less than 10%. with remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75°C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete but excluding GST. Makes : Atomberg (Efficio ) / Havells / Orient.

8

3505

28040.16

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR COLUMNS GROUND FLOOR (APSS NO.403)

8.5

15075

128145.15

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. with sponze finishing, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK GROUND FLOOR (APSS NO: 901&904)

450

214

96480

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;CEMENT CONCRETE (1:4:8) PROP. USING 40MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOUNDATIONS & UNDER STONE SLAB FLOORING .(APSS NO: 402).

38

5965

226677.6

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Labour charges for run of UG cable on wall / existing pipe with necessary fixing arrangements such as saddles, clamps, wooden separators etc., (as directed by departmental official) etc., complete but excluding GST.

50

59

2980

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;DOOR: 0.80X2.1 SUPPLY AND FIXING OF WPC SINGLE DOOR SHUTTER OF 30MM THICK FOR EXISTING DOOR FRAME OF WPC OF SIZE 100MM X 65 MM, INCLUDING 4NOS. OF 125 MM BUTT HINGES, 1 NO. DOOR STOPER, 2NOS. 150 MM LONG DOOR HANDLES, 2NOS ALDROP OF SIZE 300 MM LONG, 1NOS. OF 250 MM LONG TOWER BOLTS WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR FIXING THE FRAME AND SHUTTER ETC., INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF ALLUMINUM, ISI MARK, GOT APPROVED BY THE ENGINEER-IN-CHARGE) (APSSNO:1001&1002) BUT EXCLUDING GST

7.5

4233

31747.5

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND FIXING 76.2MM (3") DIA UV RESISTANT UPVC SWR NAHANI TRAP WITH JALI OF APPROVED ISI BRAND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

7

138

970.2

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and fixing of Distribution board with 20A SP Plug and Socket with SS enclosure with 6-32A, 10KA SP MCB, C/D Curve ISI Mark including internal connection and labour charges for surface / flush mounting etc., complete . Makes : Legrand / Schneider. MCB Make: Legrand-DX3 / Schneider-Acti9.

2

2845

5690.98

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;MASONRY WORK IN CM (1:4) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 100 X 140 MM FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR SUPERSTRUCTURE WALLS OF 100MM THICK GROUND FLOOR. FOR FINISHED ITEM OF WORK(APSS NO. 501&504)

10.3

9627

99165.31

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR PLAIN BEND 87.5 DEGREES AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

10

113

1136

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND LAYING 75 MM DIA SINGLE SOCKET PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND LABOUR CHARGES FOR LAYING, FIXING, AND COMMISSIONING THE PVC PIPES INCLUDING COUPLERS/ BENDS/TEES ETC., INCLUDING FIXING NECCESSARY FITTINGS LIKE BENDS, PLUGS, COUPLERS, JUNCTIONS, TEES ETC., WITH SOLVENT JOINTING AS PER STANDARDS INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK.

20

285

5710

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and fixing of 10A 3/2 Pin 2 Module Modular Socket with shutter-2 Nos and 6A / 10A 1 Way 1 Module Modular Switch control-2Nos duly recessed in wall with suitable Module Hot Dip Galvanized Modular Metal Box size covered with suitable Modular Cover Frame including earth connections and all labour charges etc., complete but excluding GST. [2 Socket board - for Raw power] Modular Switch, Socket, Metal box & Cover frame Make: Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus.

7

1415

9907.94

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and fixing of 12 / 15 MS plain rod fan hook with all required accessories etc., complete but excluding GST.

8

75

601.12

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II) but excluding GST.

2

6635

13270.24

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PROVIDING "HYSD/TMT" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER Fe 500 GRADE (AS PER IS 1786 - 2008 AND ALL ITS LATEST AMMENDMENTS) FROM PRIMARY STEEL PRODUCERS LIKE TATA, SAIL, VSP, JSW & SHYAM STEEL FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED.

2.4

78483

188359.2

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. with sponze finishing, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR SEPTIC TANK (APSS NO: 901&904)

25

556

13915

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR COLUMNS GROUND FLOOR (APSS NO.403)

7

15075

105531.3

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Installation of inverter type Split Air Conditioners. (Indoor unit and out door unit)

2

1999

3999.24

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and fixing of 20A 2 Module Modular Socket with shutter and 16A / 20A 1 Way 1 Module Modular Switch duly recessed in wall with 3 Module Hot Dip Galvanized Modular Metal Box size covered with 3 Modular Cover Frame including earth connections and all labour charges etc., complete but excluding GST. [Power plug] Modular Switch, Socket, Metal box & Cover frame Make: Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus.

6

1000

6004.32

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND FIXING 19.04 MM DIA, 609.60 MM LONG ALUMINUM ANODISED TOWEL ROD WITH BRACKETS AND SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK .

5

180

903

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND FIXING OF UNPLASTICISED POLY VINYL CHLORIDE (UPVC) 3TRACK SLIDING WINDOWS WITH MESH SHUTTER ? (2-GLASS SHUTTERS AND 1- MESH SHUTTER) DULY MANUFACTURED USING UPVC REINFORCED PROFILES (COMPOSITION OF PROFILE SHALL CONSISTS A MINIMUM OF 5.5 PHR OF TIO2 AND NOT MORE THAN 12 PHR OF CACO3 FOR EVERY 100 PARTS OF PVC RESIN)OF (94 MM X 45 MM)/(80 MM X 52 MM) X 2.20 MM FOR OUTER FRAMES, (58 MM X 39 MM)/(54 MM X 38 MM) X 2.20 MM FOR SLIDING SHUTTER FRAMES CAPABLE OF MOUNTING SINGLE GLAZING SYSTEM STRUCTURALLY REINFORCED WITH HOT DIP GALVANIZED UP TO 50 MICRONS OF MINIMUM THICKNESS OF 1.0/1.2 MM PREFABRICATED & WELDED THROUGH FUSION WELDING. THE WINDOW SASH SHALL BE FITTED WITH 5 MM THICK CLEAR FLOAT GLASS OF REPUTED MAKE AND MESH SHUTTER FRAME SHALL BE (42 MM X 25 MM)/(52 MM X 21.5 MM) X 2.0 MM FITTED WITH VINYL COATED FIBRE MESH- ON ROLLERS/ PULLEY DULY FIXED WITH GREY COLOUR TPV GASKET FOR SASH & GLAZING BEAD SHALL BE CO-EXTRUDED WITH GREY COLOUR SOFT PVC. SYSTEM SHALL HAVE SINGLE POINT LOCKING WITH TOUCH LOCK AND THE SYSTEM IS TO BE INSTALLED AT THE SITE USING ANCHOR FASTENERS, SILICON RUBBER SEALANT, EASY GLAZING/ DEGLAZING AT SITE ETC., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, ACCESSORIES, LABOUR CHARGES FOR TRANSPORTATION, ERECTION AT SITE, BUT EXCLUDING GST. COMPLETE FOR FINISHED ITEM OF WORK. FOR ALL FLOORS

14

8088

113236.2

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PAINTING WITH Acrylic Emulsion paint Exterior grade silicon additives having (VOC < 50 Gms/Lit) OF APPROVED MAKE AND COLOUR TO THE EXTERIOR FACES OF WALLS AS DIECTED 2COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750 Ml OF WATER WITHIN AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS OVER 1COAT OF ASIAN EXTERIOR WALL PRIMER BY DILUTING 1LIT. OF PRIMER WITH 1LIT. OF WATER (TOTAL 3 COATS) WITH SURFACE PREPARATION Etc., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, BRUSHES, LABOUR CHARGES, CURING, SCAFFOLDING AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK (APSS NO:908).

325

311

101335

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING, LAYING, JOINTING AND TESTING OF 110 MM DIA PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, AND JOINTING WITH SOLVENT CEMENT INCLUDING EXCAVATION OF TRENCHES AND SOCKET PITS IN ANY SOIL (EXCEPT ROCK REQUIRING BLASTING) UP TO 0.91M DEPTH AND REFILLING WITH EXCAVATED SOILS, WATERING, TAMPING, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK.

66

585

38649.6

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PAINTING TO NEW WOOD WORK TWO COATS WITH SYNTHETIC ENAMEL PAINT OVER ONE COAT OF WOOD PRIMER OF APPROVED BRAND AND SHADE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR PREPARING AND CLEANING THE SURFACE OF DIRT WITH SOAP AND BRUSHES INCLUDING PUTTY AND ALL INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING GST., (THE RATE INCLUDES ONE COAT OF WOOD PRIMER AND TWO COATS OF PAINT ) (APSS NO.1201, 1207, 1212).COMPLETE FOR FINISHED ITEM OF WORK

20

246

4926

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and fixing of 6 / 10A 3/2 Pin 2 Module Modular Socket with shutter. with 6 / 10A 1 Way 1 Module Modular Switch control on a Common switch board with suitable Module Hot Dip Galvanized Modular Metal Box covered with suitable Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete but excluding GST. Modular Switch, Socket, Metal box & Cover frame Make: Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus.

6

736

4421.04

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND FIXING OF 150MMX100MM SWG GULLY TRAP CONFIRMING TO ISI 651 & 4127 WITH CI GRATING AND CONSTRUCTION OF BRICK MASONRY INTERMEDIATE CHAMBER OF SIZE 20"X14"X12" IN CM (1:6) OVER CC (1:5:10) PROP. BED OF SIZE 20"X14"X4" AND PLASTERING WITH 12MM THICK IN CM (1:4) PROP. BOTH INSIDE AND OUTSIDE SURFACES AND FITTED WITH 9"X12" (230X305MM) RCC (1:11/2:3) 1 1/2" THICK COVER INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, FOR FINISHED ITEM OF WORK COMPLETE.

4

729

2919.6

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and run of 3 of 2.5 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694 / 2010, IS 17048 specification for Copper cable in existing pipe for 2 runs of mains & 1 run of earth continuity inlcuding all labour charges etc., complete but excluding GST. Make: Finolex / RR kabel / Havells / Polycab.

600

176

105894

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;INTERNAL DOOR (SINGLE SHUTTER): 1.050 X2.10M: SUPPLYING, POSITIONING AND FIXING OF ISI MARK, STANDARD MAKE, FLUSH DOOR SHUTTER OF 35 MM THICK WITH TEAK VENEER ONE SIDE AND COMMERCIAL PLY ON ANOTHER FACE INCLUDING DOOR FRAME MADE WITH MEDIUM TEAK WOOD SCANTLING OF SIZE 125 MM X 75 MM, 6 NOS. OF MS 'Z' HOLD FASTS OF SIZE 230 X 40 X 3 MM, 3 NOS. OF 125 MM BUTT HINGES, 2NOS. 150 MM LONG DOOR HANDLES, 1 NO. ALDROP OF SIZE 250 MM LONG, 1 NO. 200 MM LONG TOWER BOLTS, 1 NO. DOOR STOPPER WITH BOLTS, NUTS, NF SCREWS, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR MAKING THE FRAME AND FIXING FRAME AND SHUTTER, MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF ALUMINIUM, ISI MARK, GOT APPROVED BY THE ENGINEER-IN-CHARGE). (APSS NO: 1001&1002).

3.5

6863

24022.25

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING CENTERING WITH STEEL PLATES, SHUTTERING, VIBRATING, CURING ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR FINISHED ITEM OF WORK. FOR FOOTINGS. (APSS NO. 403)

15

12416

186244.5

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND LAYING 110 MM DIA SINGLE SOCKET PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND JOINTED WITH SOLVENT CEMENT INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, AND LABOUR CHARGES FOR LAYING, FIXING, AND COMMISSIONING THE PVC PIPES INCLUDING COUPLERS/ BENDS/TEES ETC., INCLUDING FIXING NECCESSARY FITTINGS LIKE BENDS PLUGS, COUPLERS, JUNCTIONS, TEES ETC., WITH SOLVENT JOINTING AS PER STANDARDS,INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK.

20

390

7808

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR COWL AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

7

26

182.7

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR DOOR BEND 87.5 DEGREES AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

5

145

727

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PROVIDING AND APPLYING SYNTHETIC PLASTER PUTTY OR EQUIVALENT PUTTY SUCH AS BIRLA WALL CARE PUTTY OF AVERAGE 1 TO 2 MM THICK OVER PLASTERED SURFACE TO PREPARE THE SURFACE EVEN AND SMOOTH AFTER THOROUGHLY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDERED MATERIALS, APPLYING EMERY PAPER, SAND THE SURFACE, CLEAN & WIPE OFF LOOSE DUST, APPLYING, KNIFING PASTE FILLER BY PUTTY KNIFE / MUSLIN PAD, AIR DRY FOR 2-3 HRS., SAND WITH 180 AND 320 NO. EMERY PAPER FOR THE SURFACE PREPARATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, ALL OPERATIONAL, INCIDENTAL, LABOUR CHARGES ETC., BUT EXCLUDING GST COMPLETE FOR FINISHED ITEM OF WORK FOR INTERNAL WALLS-

480

262

125760

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PLASTERING TO SUPERSTRUCTURE 20 MM THICK IN TWO COATS, WITH A BASE COAT OF 16 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. with sponze finishing, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE.FOR FINISHED ITEM OF WORK. BASEMENT (APSS NO: 901&904)

150

586

88005

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;EARTH WORK EXCAVATION FOR FOUNDATIONS AND DEPOSITING ON BANK, FOR ALL LIFTS AND WITH AN INITIAL LEAD OF 10M INCLUDING ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS SHORING, SHEETING, PLANKING, STRUTTING, DEWATERING SITE CLEARANCE, CLEARING SHURBS, BRUSHWOOD, UNDER GROWTH AND SMALL TREES NOT EXCEEDING 300 MM GIRTH, MEASURED AT ONE METRE ABOVE GROUND ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK INCLUDING DEWATERING CHARGES ETC AS PER SS - 20 B FOR STIFF BLOCK COTTON SOIL , HARD RED EARTH, MURRAM, ORDINARY GRAVEL - MANUAL MEANS UP TO 3M DEPTH - FOUNDATION OF BUILDING (APSS 308).

130

499

64922

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING CENTERING WITH STEEL PLATES, SHUTTERING, VIBRATING, CURING ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR FINISHED ITEM OF WORK.FOR PLINTH BEAMS (APSS NO. 403)

7.5

15661

117458.25

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;CONSTRUCTING 1'-6" X 1'-6" BRICK MASONARY INSPECTION CHAMBER WITH CM (1:6) PROP. USING FLY ASH BRICKS OF 225MM THICK , AND FITTED WITH 457.2 X 457.2 MM (1'-6'' X 1'-6") RCC COVER UP TO A DEPTH OF 914.4 MM (3'-0") AND LAYING CEMENT CONCRETE (1:4:8) 150 MM THICK USING 40 MM HBG METAL AND PCC (1:2:4) BENCHING AND CHANNEL 100 MM THICK INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, SAND, BRICKS, WATER ETC.,TO SITE ,COST OF LABOUR CHARGES LIKE MIXING CEMENT MORTAR, CONSTUCTING MASONARY, LIFT CHARGES, CURING ETC., COMPLETE INCLUDING COST OF STEEL AND ITS FABRICATION, BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, FOR FINISHED ITEM OF WORK AS PER STANDARD SPECIFICATION

5

5126

25630.5

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and fixing of 8 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 and suitable for 24 Nos S.P. outgoings and for 1 No 4 pole Incomer (FP Isolator / MCB) with 100 A tinned copper busbar, neutral bar, earth bar and cable ties for cable management, fully shrouded neutral bar, profile blanking modules for unused MCB ways, din bars and detachable gland plate etc., complete with inter connections but excluding GST. Incommer: 63A FP Isolator - 1No. Outgoing: 6-32A SP MCB, 10kA ISI mark - 24 Nos. DB Makes: Legrand / Schneider / Siemens / LK (L&T). Isolator Make: Legrand-DX3 / Schneider-Acti9 / Siemens / LK (L&T) Exora. MCB Make: Legrand-DX3 / Schneider-Acti9 / Siemens / LK (L&T) Exora.

1

21265

21265.32

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;S&F OF CHROMIUM PLATED FINISH BRASS BODY QUARTER TURN BIBCOCK CUM HEALTH FAUCET WITH 1M LONG TUBE AND WALL HOOK WITH 10 YEARS WARRANTY ,INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST ., COMPLETE FOR FINISHED ITEM OF WORK.

6

4024

24147

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and fixing of ISI 25mm outer dia heavy grade with IS:9537 part 3 rigid PVC pipe concealed in Roof Slabs with all required accessories including labour charges etc., complete but excluding GST. Makes : Sudhakar / Modi / VIP.

150

111

16668

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLY AND FIXING IN POSITION 584.2MM LONG ORRISA PAN WITH 100 MM 'P' OR 'S' TRAP INCLUDING PROVIDING BRICK MASONARY SEAT USING 2 ND CLASS BRICKS AS PER STANDARD PRACTICE, INCLUDING CUTTING THE WALLS AND FLOORS AND MAKING GOOD THE SAME, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE.

2

3011

6022

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLY AND FIXING OF 28.60MM OD PIPE - SDR 13.5 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 13.5 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

110

267

29370

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PAINTING WITH Acrylic Emulsion paint Exterior grade silicon additives having (VOC < 50 Gms/Lit) OF APPROVED MAKE AND COLOUR TO THE EXTERIOR FACES OF WALLS AS DIECTED 2COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750 Ml OF WATER WITHIN AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS OVER 1COAT OF ASIAN EXTERIOR WALL PRIMER BY DILUTING 1LIT. OF PRIMER WITH 1LIT. OF WATER (TOTAL 3 COATS) WITH SURFACE PREPARATION Etc., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, BRUSHES, LABOUR CHARGES, CURING, SCAFFOLDING AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK (APSS NO:908).

450

311

140310

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and fixing of 24 Port 10 / 100 / 1000 Gigabit Unmanageable Ethernet switch but excluding GST. Makes : TP Link / D link / Netfox.

1

10295

10295.79

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply of 25 Sqmm 3.5 core XLPE insulated, 1100V grade armoured alluminium cable with ISI mark as per specification confirming to IS:7098 (Part- I) but excluding GST. Make: Universal / Torrent / Polycab / Gloster.

100

409

40901

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and fixing of 10A 3/2 Pin 2 Module Modular Socket with shutter-2 Nos and 6A / 10A 1 Way 1 Module Modular Switch control-2Nos duly recessed in wall with suitable Module Hot Dip Galvanized Modular Metal Box size covered with suitable Modular Cover Frame including earth connections and all labour charges etc., complete but excluding GST. [[2 Socket board- for UPS power] Modular Switch, Socket, Metal box & Cover frame Make: Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus.

10

1415

14154.2

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;CEMENT CONCRETE (1:2:4) PROP. USING 20MM HARD GRANITE MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR SEPTIC TANK (APSS NO: 402).

2

6980

13961.2

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;RANDAM RUBBLE MASONRY USING HARD GRANITE STONE IN CM(1:6) PROP. INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, CURING, ETC.,COMPLETE FOR FOUNDATIONS AND BASEMENTS FOR FINISHED ITEM OF WORK. APSS NO: 615).

55

5237

288079

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;RE-FILLING WITH USEFUL AVAILABLE EXCAVATED EARTH OTHER THAN EXPANSIVE SOILS LIKE RED EARTH AND ORDINARY GRAVEL ETC., (EXCLUDING ROCK) IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES , HIRE CHARGES OF T & P ETC., BUT EXCLUDING GST - COMPLETE FOR FINISHED ITEM OF WORK. (APSS NO. 309 & 310)

50

55

2760

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls OF 225MM THICK

30

8034

241035

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING & FIXING WHITE GLAZED FLAT BACK HALF STALL URINALS 1ST QUALITY CONFORMING TO IS:2556-1995 WITH STANDARD C.P. SPREADER FIXED WITH SCREWS COMPLETE INDIAN MAKE : 590 X375 X 390 MM FIXED WITH SCREWS COMPLETE INDIAN MAKE FIXED WITH SCREWS COMPLETRE INDIAN MAKE INCLUDING 12.70 MM PVC CONNECTION WITH BRASS UNION NUTS C.P COATED, 38.10 MM C.P WASTE COUPLING, 38.10 MM PVC SOLID WASTE PIPE OUTLET, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE.(TBSP-E.VII-03)

2

5142

10284.8

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply, fabrication and fixing of 1 set MS bracket suitable for fixing out door unit of Split AC unit including all accessories etc., complete but excluding GST.

2

1626

3253.02

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;CELL DOOR: MANUFACTURING, SUPPLYING AND FIXING OF IRON GRATED DOOR OF SIZE 0.75 X 2.00 M (TO LOCK UP ROOM) MADE WITH I.S.M.C. CHANNEL 150X50X10mm SECTION OF CHANNEL AT TOP AND BOTTOM WITH VERTICAL MS ROUNDS OF 20 mm DIA @ 100 mm C/C HORIZONTAL FLAT OF SIZE 75mmX10mm FOR SHUTTER @ 0.30 MM C/C AND SIDE SUPPORTS WITH MS PLATE OF SIZE 150mmX10mm WHICH WILL BE WELDED TO THE CHANNEL AT TOP AND BOTTOM AND ALSO LOCKING ARRANGEMENTS WITH ALDROP MADE WITH 20 mm DIA MS ROUNDS INCLUDING COST, LABOUR CHARGES FOR CUTTING, BENDING, WELDING CHARGES, MAKING HOLES AND HOLD FAST OF SIZE 50X8mm FLAT OF 300mm LONG AND INCLUDING THE COST OF MISCELLANEOUS ACCESSORIES, TRANSPORTATION TO SITE AND PAINTING ONE COAT WITH RED OXIDE ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK AS PER DRAWING.

2

18812

37625.8

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and Run of 25mm x 6mm G.I Strip including cost of all accessories and labour charges etc., complete but excluding GST.

20

181

3632

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and fixing of 12 Way SPN DB with IP 43 Protection as per IS:13032 and suitable for 10 Nos S.P outgoings and for 1 No Incomer with 100 A tinned copper busbar, neutral bar, earth bar and cable ties for cable management, fully shrouded neutral bar, din bars and detachable gland plate etc., complete with inter connections but excluding GST. Incommer: 40A DP Isolator - 1No. Outgoing: 6-32A SP MCB, 10kA ISI mark - 10 Nos DB Makes: Legrand / Schneider / Siemens / LK. Isolator Make: Legrand-DX3 / Schneider-Acti9 / Siemens / LK (L&T) Exora. MCB Make: Legrand-DX3 / Schneider-Acti9 / Siemens / LK (L&T) Exora.

1

9143

9143.74

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;RANDAM RUBBLE MASONRY USING HARD GRANITE STONE IN CM(1:6) PROP. INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, SEIGNORAGE CHARGES,LABOUR CHARGES, CURING, ETC., COMPLETE FOR FOUNDATIONS AND BASEMENTS FOR FINISHED ITEM OF WORK. APSS NO: 615).

42

5237

219987.6

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR BOTTOM SLAB 200 MM

3

8607

25821.3

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PAINTING TO NEW WALLS WITH THREE (3) COATS OF Synthetic Polymer luxury Plastic emulsion /solvent based lustre paint of superior grade having (VOC < 50 Gms./Lit) OF APPROVED BRAND AND SHADE (ASIAN /BERGER /NEROLAC /SAICOAT /INDOCEM OR EUIVALENT) OVER ONE COAT OF PRIMER OF APP BRAND AFTER THOUROULY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDER MATERIALS INCLUDING COST OF ALL MATERIALS TO THE INTERIOR FACES OF WALLS AS DIECTED 2COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750ML OF WATER WITH AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS (TOTAL3 COATS) WITH SURFACE PREPARATION ETC., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, BRUSHES, LABOUR CHARGES, CURING, SCAFFOLDING LIFTING(MANUAL) AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK (APSS NO. 911)

660

187

123684

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;MASONRY WORK IN CM (1:6) PROP WITH FLYASH CEMENT SOLID BLOCKS OF SIZE 290 X 225 X 140 MM FOR MANUFACTURING OF FLYASH SOLID BLOCKS USING FLYASH OF 80 KGS, CEMENT OF 15 KGS. GYPSUM OF 5 KGS. AND STONE DUST INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES, SCAFFOLDING AND CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE WITH A COMPRESIVE STRENGTH NOT LESSTHAN 50 KG/SQM FOR SUPERSTRUCTURE WALLS OF 225MM THICK GROUND FLOOR FOR FINISHED ITEM OF WORK(APSS NO. 501&504)

37

8737

323287.5

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HEIGHT 3.66M , VIBRATING, CURING, LIFTING(MANUAL) ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR BEAMS GROUND FLOOR (APSS NO.403)

9.5

14593

138637.3

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Providing 2 runs of Copper tubes for suction and liquid between indoor and outdoor unit for split/Cassette Air-Conditioner including foaming etc., complete but excluding GST. 1. 3/4" x 3/8" 2. 5/8" x 1/4" 3. 1/2" x 1/4" or equivalent sizes.

30

1195

35870.4

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;RE-FILLING WITH USEFUL AVAILABLE EXCAVATED EARTH OTHER THAN EXPANSIVE SOILS LIKE RED EARTH AND ORDINARY GRAVEL ETC., (EXCLUDING ROCK) IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES , HIRE CHARGES OF T & P ETC., BUT EXCLUDING GST - COMPLETE FOR FINISHED ITEM OF WORK. (APSS NO. 309 & 310)

130

55

7176

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;FILLING WITH CARTED GRAVEL IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL OPERATIONAL, INCIDENTAL, SEIGNORAGE, LABOUR CHARGES, HIRE CHARGES OF T & P ETC., COMPLETE FOR FINISHED ITEM OF WORK. (APSS NO. 309 & 310)

250

384

96175

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK (APSS NO.403) FOR GROUND FLOOR LINTELS

2

13556

27113.6

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;CONSTRUCTING 914.0 MM ( 3'-0") DIA BRICK MASONARY MAN HOLE AS PER IS-4111:PART-1:1986 WITH CM (1:6) PROP. USING FLY ASH BRICKS OF 225MM THICK FROM APPROVED SOURCE HAVING A MINIMUM CRUSHING STRENGTH OF 5N/SQ.MM INCLUDING PLASTERING WIH CM(1:3) PROP. 12 MM THICK BOTH INSIDE AND OUTSIDE, FITTED WITH 20'' DIA RCC COVERS AND FRAMES, INCLUDING EXCAVATING PITS UP TO A DEPTH OF 914.4 MM (3'-0") IN ALL SORTS OF SOILS (EXCLUDING ROCK) AND LAYING CEMENT CONCRETE (1:4:8) 150 MM THICK USING 40 MM HBG METAL AND PCC (1:2:4) BENCHING AND CHANNEL 100 MM THICK AS PER STANDARD SPECIFICATION AND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, COST OF ALL INCIDENTAL AND OPERATIONAL, LABOUR CHARGES LIKE MIXING CEMENT MORTAR, CONSTRUCTING MASONRY, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK AS PER STANDARD SPECIFICATION.

10

9870

98709

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND FIXING GM GATE (PEET) VALVES - 20 MM NB SIZEINDIAN MAKE HEAVY DUTY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK

2

1070

2140.6

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Labour charges for fixing of BLDC Exhaust fan in wall with necessary connections etc., complete but excluding GST. (for hole already made available)

4

475

1900.76

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and Transportation of 2.0 / 1.8 TR 3 Star capable INVERTER Model Cool type split AC unit with high wall mounted Single Split 100% copper indoor and outdoor condencing unit Hermetically sealed compressor suitable for operation on 230V, 50Hz, 1 Phase AC supply capable of performing Heat cool dehumidifying air circulating and filtering with cooling and condensing units with 3.0 mts of copper piping, insulation kit and 4 mts of 4 core copper flexible chord (Voltage range 160- 264 volts) and cordless remote control with with warranty of compressor for 5 years iand comprehensive maintenance for 2 years. 2.0 / 1.8 TR 5 Star capable of delivering 21600 BTU/hr and above with operating on refrigerant R-32 / R-410 etc., complete as directed by the Engineer-in-charge but excluding GST. Make: Daikin / Toshibha / Blue Star /Hitachi.

2

52262

104525.8

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;FLOORING WITH DOUBLE CHARGED / MULTI CHARGED STAIN FREE FULL BODY PORCELAIN VITRIFIED TILES WITH DOUBLE LAYER PIGMENT OF SIZE 600 X 600 MM AND THICKNESS BETWEEN 8-10 MM 1ST QUALITY CONFORMING TO 3711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES ETC., COMPLETE, INCLUDING LIFTING (MANUAL) AND ALL LABOUR CHARGES, ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR

100

1329

132940

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and fixing of Modular socket type Telephone jack with Connector on 2 modular hot dip galvanized metal box and 2 modular cover frame including giving connections, cost of all accessories and labour charges etc., complete but excluding GST. Telephone jack with Connector, cover frame & metal box Makes: Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus.

8

469

3758.72

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;HALF ROUNDING THE EDGES OF GRANITE STONE SLABS OF ALL THICKNESS INCLUDING POLISHING THE SAME

40

556

22268.54

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;EARTH WORK EXCAVATION AND DEPOSITING ON BANK, FOR ALL LIFTS AND WITH AN INITIAL LEAD OF 10M INCLUDING ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS SHORING, SHEETING, PLANKING, STRUTTING, DEWATERING SITE CLEARANCE, CLEARING SHURBS, BRUSHWOOD, UNDER GROWTH AND SMALL TREES NOT EXCEEDING 300 MM GIRTH, MEASURED AT ONE METRE ABOVE GROUND ETC., COMPLETE FOR FINISHED ITEM OF WORK INCLUDING DEWATERING CHARGES ETC AS PER SS - 20 B FOR STIFF BLOCK COTTON SOIL , HARD RED EARTH, MURRAM, ORDINARY GRAVEL - MANUAL MEANS UP TO 3M DEPTH FOR OPEN EXCAVATION -EXCLUDING GST. (APSS 308).

50

285

14270

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE OF M25 CORRESPONDING TO IS 456 USING WEIGH BATCHER WITH 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND - 0.40 CUM) COARSE AGGREGATE (0.80 CUM), WATER ETC., TO SITE , INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, CURING ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS. COMPLETE WITH MINIMUM CEMENT CONTENT OF 380 KGS PER CUM OF CONCRETE, INCLUDING CENTERING WITH STEEL PLATES, SHUTTERING, VIBRATING, CURING ETC COMPLETE BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK FOR FINISHED ITEM OF WORK.FOR PLINTH BEAMS (APSS NO. 403)

14.3

15661

223953.73

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PLAIN CEMENT CONCRETE (1:3:6) PROP. USING 20MM GRADED HARD GRANITE MACHINE CRUSHED METAL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, CENTERING, MACHINE MIXING, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR CHARGES ETC.,BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. BED BLOCKS IN GROUND FLOOR (APSS NO: 402).

2

7070

14141.6

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PROVIDING AND APPLYING SYNTHETIC PLASTER PUTTY OR EQUIVALENT PUTTY SUCH AS BIRLA WALL CARE PUTTY OF AVERAGE 1 TO 2 MM THICK OVER PLASTERED SURFACE TO PREPARE THE SURFACE EVEN AND SMOOTH AFTER THOROUGHLY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDERED MATERIALS, APPLYING EMERY PAPER, SAND THE SURFACE, CLEAN & WIPE OFF LOOSE DUST, APPLYING, KNIFING PASTE FILLER BY PUTTY KNIFE / MUSLIN PAD, AIR DRY FOR 2-3 HRS., SAND WITH 180 AND 320 NO. EMERY PAPER FOR THE SURFACE PREPARATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, ALL OPERATIONAL, INCIDENTAL, LABOUR CHARGES ETC., BUT EXCLUDING GST COMPLETE FOR FINISHED ITEM OF WORK FOR EXTERNAL WALLS-

325

465

151222.5

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PROVIDING "HYSD/TMT" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER Fe 500 GRADE (AS PER IS 1786 - 2008 AND ALL ITS LATEST AMMENDMENTS) FROM Reinforcement Steel (HYSD/TMT) from steel Manufactureres within Telangana with min integrated installed Production Capacity of 2 Lakh MT per annum like AF Star TMT/MS Life TMT, Radha TMT, Sugna TMT FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED.

1.5

78483

117724.5

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;ORNAMENTAL PLASTERING 12MM THICK WITH A BASE COAT OF 8 MM THICK IN CM (1:5) PROP. AND FINISH COAT OF 4MM THICK IN CM (1:3) PROP. WITH DUBARA SPONGE FINISHING COMPLETE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING (MANNUAL), CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE. FOR FINISHED ITEM OF WORK (APSS NO: 901 & 904) GROUND FLOOR

180

594

106992

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND FIXING NP SOAP DISH HEAVY TYPE WITH NP SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK.

6

278

1672.8

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and transportation of 65W +/-10% (>=6500 Lumens) LED Street light Body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover / temperature protective custom molded polycarbonate diffuser, Thermal shock and impact resistant IK07 fixed to the housing by SS screws Suitable lense on LEDs, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F > 0.90, System having efficacy >120 lumens / watt, with Ingress protection IP66, BIS approved Potted driver, Driver surge protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>70, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc., complete with BIS certification with 5 years warranty. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 certificates but excluding GST. LUMINAIRE MAKE : CROMPTON / HAVELLS / Jaquar. LED MAKE : CREE / NICHIA / OSRAM.

2

4964

9929.96

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Wiring with 3 runs of 1.5 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694/2010, IS 17048 specification for Copper cable in existing pipe with 6A / 10A 1 Way 1 Module Modular Switch control with suitable Module Hot Dip Galvanized modular type Metal Box covered with suitable Modular Cover Frame, with 3 Plate Jumbo Ceiling Rose including all labour charges etc., complete for Ceiling fan and Exhaust fan points in Non-Residential Buildings but excluding GST. Copper cable Make: Finolex / RR kabel / Havells / Polycab. Modular Switch, Socket, Metal box & Cover frame Make: Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus. Ceiling Rose Make: Gold Medal Olive / Million Zoom / Anchor Penta Cherry.

12

1280

15366.6

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM HEIGHT/RISERS OF STEPS WITH DOUBLE CHARGED / MULTI CHARGED STAIN FREE FULL BODY PORCELAIN VITRIFIED TILES WITH DOUBLE LAYER PIGMENT OF SIZE 600 X 600 MM AND THICKNESS BETWEEN 8-10 MM 1ST QUALITY CONFORMING TO 13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CM (1:5) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE INCLUDING LIFTING (MANUAL) AND ALL LABOUR CHARGES, ETC., BUT EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS, COMPLETE FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR

15

1314

19710

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING MS STRUCTURAL STEEL WORKS LIKE HEAVY STEEL WORKS LIKE TRUSSES, STANCHIONS, HEAVY BEAMS AND GIRDERS INCLUDING COST OF WELDING RODS, POWER CHARGES, FOR ERECTING & FIXING ALL STRUCTURAL STEEL WORKS LIKE HEAVY IRON GRILLS, TRUSSES, STANCHIONS, HEAVY BEAMS AND GIRDERS ERECTING IN POSITION AND FIXING BY USING CHAIN PULLEY BLOCKS, DEREK POLE ARRANGEMENTS AND CRANES ETC., COMPLETE IN POSITION ETC COMPLETE FOR ALL SIZES AS DIRECTED BY THE ENGINEER-IN- CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES FOR FABRICATION, FIXING ETC., COMPLETE FOR THE FINISHED ITEM OF WORK M.STUBES OF ALL SIZES

300

187

56280

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING, LAYING, JOINTING AND TESTING OF 110 MM DIA PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, AND JOINTING WITH SOLVENT CEMENT INCLUDING EXCAVATION OF TRENCHES AND SOCKET PITS IN ANY SOIL (EXCEPT ROCK REQUIRING BLASTING) UP TO 0.91M DEPTH AND REFILLING WITH EXCAVATED SOILS, WATERING, TAMPING, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST., COMPLETE FOR FINISHED ITEM OF WORK.

30

585

17568

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND FIXING BEST INDIAN MAKE 609.6X457.2mm T.V SHAPE MIRROR WITH PLASTIC FRAME MIRROR INCLUDING WOODEN BLOCKS, SCREWS ETC., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK

5

640

3204

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND FIXING GM GATE (PEET) VALVES - 25 MM NB SIZEINDIAN MAKE HEAVY DUTY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK

2

1538

3076.6

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING, LAYING, JOINTING AND TESTING OF 152.40 MM DIA SWG SP-1 PIPES OF ISI MAKE CONFIRMING TO ISI:651&4127, WITH AIRTIGHT CEMENT JOINTS IN CM(1.5:1) PROP. INCLUDING EXCAVATION OF TRENCHES AND SOCKET PITS IN ANY SOIL (EXCEPT ROCK REQUIRING BLASTING) UP TO 1.52M (5'-0") DEPTH AND REFILLING WITH EXCAVATED SOILS, WATERING, TAMPING, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST , COMPLETE FOR FINISHED ITEM OF WORK.

35

980

34300

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges without bulb (for new installation) but excluding GST. BH Make: Gold Medal Olive / Million Zoom / Anchor Penta Cherry.

12

92

1104.36

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLYING AND FIXING APPROVED MAKE WASH DOWN EUROPEAN WATER CLOSET OF 1ST QUALITY CONFORMING TO IS:2556-PART-2-2004 OF WHITE GLAZED WITH 'P' TRAP, INCLUDING SUPPLYING AND FIXING BEST INDIAN MAKE PLASTIC SEAT AND LID FOR EUROPEAN WATER CLOSETS WITH RUBBER OR PLASTIC BUFFERS AS PER IS 2548-1996 AND SUPPLY & FIXING OF PVC LOW LEVEL SYSTEM WITH INTERNAL COMPONENTS & SHORT BEND: 8 LITERS CAPACITY SINGLE FLUSH & SUPPLYING & FIXING 15 MM NOMINAL SIZE PVC CONNECTION WITH BRASS UNION NUT C.P COATED INCLUDING CUTTING THE WALLS AND FLOORS AND MAKING GOOD THE SAME, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK

4

5064

20256.4

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply of 2 Module Modular type Electronic Fan Regulator with 2 Module Hot Dip Galvanized Modular Metal Box covered with 2 modular cover frame etc., complete but excluding GST. Make: Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus.

8

925

7407.68

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Supply and installation of 6U 600 mm width x 500 mm depth UL certified wall mounting network rack with sheet steel revited metal frame, top and bottom cover with brush cable entry, confirming to following standards IEC 60529, EN 60529 ( IP 20), IEC 62262 EN 62622 (IK08) , DIN 41494, EIA 310, IEC 60927 including all accessories like horizontal PDU, metal cable manager, hardware packet and the cantilever shelf etc., complete but excluding GST. Makes : Vallrack (Legrand) / Netrack.

1

7998

7998.5

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;SUPPLY AND FIXING OF 22.20MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC.,BUT EXCLUDING GST, COMPLETE FOR FINISHED ITEM OF WORK.

50

237

11875

... More
Construction of Sub Treasury Office Building at Alair of Yadadri Bhonagir District;Earth work excavation of Trench in hard ground soil, laying of U.G cables upto 50 Sqmm on sand cushion covering the cable with bricks and back filling of Trench duly providing route indicator embedded in C.C including cost and conveyance of materials and labour charges etc., complete but excluding GST.

50

373

18651



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.