The Panchayat Raj Engineering Department has issued a formal invitation for competitive bids for Package No.4 /crrscp Of 09 Works In Khanapur Mandal In Narsampet Constituency Of Warangal District -pack Ec Rs.43.00 Lakhs in Nirmal, Telangana, with an estimated contract value of Rs. 34,22,467. The bid opening date for this tender is 22-05-2025 and the last date for bid submission is 06-06-2025. Interested bidders for Panchayat Raj Engineering Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 34,225Document Cost
Refer DocumentsTender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
598759Tender No
54/CRR SCP/25-26 1st call Dt.07.05.2025 (Reserved for SC-95 Community) of SE PR Region WarangalTender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Road works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR = 12%, P1 < 12% from approved sources, grading to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per MoRT&H specification 305 (5th revision)
9.59
325
3125
... More
Road works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR = 12%, P1 < 12% from approved sources, grading to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per MoRT&H specification 305 (5th revision)
9.49
325
3092
... More
Road works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR = 12%, P1 < 12% from approved sources, grading to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per MoRT&H specification 305 (5th revision)
9.59
325
3125
... More
Road works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR = 12%, P1 < 12% from approved sources, grading to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per MoRT&H specification 305 (5th revision)
5.71
325
1860
... More
Road works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR = 12%, P1 < 12% from approved sources, grading to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per MoRT&H specification 305 (5th revision)
9.59
325
3125
... More
Road works;Construction of un-reinforced, expansion and construction joint plain cement concrete pavement, thickness as per design, over a prepared base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates (Natural sand 50%+Manufactured sand(Rock Sand)50%) conforming to IS: 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including overhead charges & Contractors profit excluding Seignarage charges etc complete
47.94
6870
329372
... More
Road works;Construction of Granular sub-base by providing HBG material confirming to Grading VI of MoRT&H (Table 400-1 & 400-2) including cost, and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix-in-place method with rotavator / approved means at OMC and compacting with vibratory roller to achieve CBR value minimum of 30% at 98% of dry density and PI value maximum 6, complete for finished item of work as per MoRT&H Specification 401 (5th revision) including contractors profit & Over head charges excluding Seignarage charges etc.
27.9
2356
65734
... More
Road works;Construction of Granular sub-base by providing HBG material confirming to Grading VI of MoRT&H (Table 400-1 & 400-2) including cost, and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix-in-place method with rotavator / approved means at OMC and compacting with vibratory roller to achieve CBR value minimum of 30% at 98% of dry density and PI value maximum 6, complete for finished item of work as per MoRT&H Specification 401 (5th revision) including contractors profit & Over head charges excluding Seignarage charges etc.
28.2
2337
65914
... More
Road works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR = 12%, P1 < 12% from approved sources, grading to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per MoRT&H specification 305 (5th revision)
9.49
325
3092
... More
Road works;Construction of un-reinforced, expansion and construction joint plain cement concrete pavement, thickness as per design, over a prepared base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates (Natural sand 50%+Manufactured sand(Rock Sand)50%) conforming to IS: 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including overhead charges & Contractors profit excluding Seignarage charges etc complete
47.94
6870
329372
... More
Road works;Construction of Granular sub-base by providing HBG material confirming to Grading VI of MoRT&H (Table 400-1 & 400-2) including cost, and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix-in-place method with rotavator / approved means at OMC and compacting with vibratory roller to achieve CBR value minimum of 30% at 98% of dry density and PI value maximum 6, complete for finished item of work as per MoRT&H Specification 401 (5th revision) including contractors profit & Over head charges excluding Seignarage charges etc.
28.2
2337
65914
... More
Road works;Construction of Granular sub-base by providing HBG material confirming to Grading VI of MoRT&H (Table 400-1 & 400-2) including cost, and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix-in-place method with rotavator / approved means at OMC and compacting with vibratory roller to achieve CBR value minimum of 30% at 98% of dry density and PI value maximum 6, complete for finished item of work as per MoRT&H Specification 401 (5th revision) including contractors profit & Over head charges excluding Seignarage charges etc.
28.2
2337
65914
... More
Road works;Construction of un-reinforced, expansion and construction joint plain cement concrete pavement, thickness as per design, over a prepared base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates (Natural sand 50%+Manufactured sand(Rock Sand)50%) conforming to IS: 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including overhead charges & Contractors profit excluding Seignarage charges etc complete
47.94
6870
329372
... More
Road works;Construction of Granular sub-base by providing HBG material confirming to Grading VI of MoRT&H (Table 400-1 & 400-2) including cost, and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix-in-place method with rotavator / approved means at OMC and compacting with vibratory roller to achieve CBR value minimum of 30% at 98% of dry density and PI value maximum 6, complete for finished item of work as per MoRT&H Specification 401 (5th revision) including contractors profit & Over head charges excluding Seignarage charges etc.
16.8
2356
39581
... More
Road works;Construction of Granular sub-base by providing HBG material confirming to Grading VI of MoRT&H (Table 400-1 & 400-2) including cost, and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix-in-place method with rotavator / approved means at OMC and compacting with vibratory roller to achieve CBR value minimum of 30% at 98% of dry density and PI value maximum 6, complete for finished item of work as per MoRT&H Specification 401 (5th revision) including contractors profit & Over head charges excluding Seignarage charges etc.
27.9
2356
65734
... More
Road works;Construction of Granular sub-base by providing HBG material confirming to Grading VI of MoRT&H (Table 400-1 & 400-2) including cost, and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix-in-place method with rotavator / approved means at OMC and compacting with vibratory roller to achieve CBR value minimum of 30% at 98% of dry density and PI value maximum 6, complete for finished item of work as per MoRT&H Specification 401 (5th revision) including contractors profit & Over head charges excluding Seignarage charges etc.
28.2
2356
66440
... More
Road works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR = 12%, P1 < 12% from approved sources, grading to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per MoRT&H specification 305 (5th revision)
9.49
325
3092
... More
Road works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR = 12%, P1 < 12% from approved sources, grading to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per MoRT&H specification 305 (5th revision)
9.59
325
3125
... More
Road works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR = 12%, P1 < 12% from approved sources, grading to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per MoRT&H specification 305 (5th revision)
9.59
325
3125
... More
Road works;Construction of un-reinforced, expansion and construction joint plain cement concrete pavement, thickness as per design, over a prepared base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates (Natural sand 50%+Manufactured sand(Rock Sand)50%) conforming to IS: 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including overhead charges & Contractors profit excluding Seignarage charges etc complete
28.56
6907
197284
... More
Road works;Construction of un-reinforced, expansion and construction joint plain cement concrete pavement, thickness as per design, over a prepared base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates (Natural sand 50%+Manufactured sand(Rock Sand)50%) conforming to IS: 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including overhead charges & Contractors profit excluding Seignarage charges etc complete
47.43
6907
327633
... More
Road works;Construction of un-reinforced, expansion and construction joint plain cement concrete pavement, thickness as per design, over a prepared base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates (Natural sand 50%+Manufactured sand(Rock Sand)50%) conforming to IS: 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including overhead charges & Contractors profit excluding Seignarage charges etc complete
47.94
6870
329372
... More
Road works;Construction of Granular sub-base by providing HBG material confirming to Grading VI of MoRT&H (Table 400-1 & 400-2) including cost, and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix-in-place method with rotavator / approved means at OMC and compacting with vibratory roller to achieve CBR value minimum of 30% at 98% of dry density and PI value maximum 6, complete for finished item of work as per MoRT&H Specification 401 (5th revision) including contractors profit & Over head charges excluding Seignarage charges etc.
28.2
2337
65914
... More
Road works;Construction of un-reinforced, expansion and construction joint plain cement concrete pavement, thickness as per design, over a prepared base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates (Natural sand 50%+Manufactured sand(Rock Sand)50%) conforming to IS: 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including overhead charges & Contractors profit excluding Seignarage charges etc complete
47.94
6907
331156