Osmania University Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Osmania University Tender

Works
Civil And Construction
Opening Date20 May 2025
Closing Soon3 Jun 2025
Tender Amount₹ 6,35,722 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Ramps in MBA connecting corridor;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., complete for finished item of work .

39

606

23641.8

... More
Construction of Ramps in MBA connecting corridor;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and etc., complete for finished item of work for.

10

225

2255

... More
Construction of Ramps in MBA connecting corridor;Dismantling, clearing away debries carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Engineer-in-charge duly taking actual premeasurements before dismantling including all labour charges , etc., complete Kadapa Slabs or Shahabad/Granite Stone slabs flooring on sand bed in all floors.

43

12

516

... More
Construction of Ramps in MBA connecting corridor;Filling with Carted Gravel with 20 KM lead (From out side campus) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water & Gravel to work site and all operaitonal, incidental, labour charges, seignorage charges hire charges of T&P, including cutting, loading, unloading, Consolidation Charges, Compaction Factor, watering etc., Complete for fnished item of work

2

632

1264.2

... More
Construction of Ramps in MBA connecting corridor;Cutting holes in stone masonry &basement and repairs Labour charges only

3

92

276

... More
Construction of Ramps in MBA connecting corridor;Coursed Rubble stone masonry 2nd sort in CM (1:8) prop: (Cement: Sand) using Hard Granite Stones carted from approved quarry including cost and conveyance of all materials like cement, sand, water, stones etc., from approved quarry, to site and sales & other taxes on all materials including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing etc., complete for finished item of work in basement.

9

5951

53565.3

... More
Construction of Ramps in MBA connecting corridor;Dismantling, clearing away debries carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Engineer-in-charge duly taking actual premeasurements before dismantling including all labour charges , etc., complete Brick Masonry

2.5

312

780.25

... More
Construction of Ramps in MBA connecting corridor;Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with 304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover.

1

749

749

... More
Construction of Ramps in MBA connecting corridor;Plain Cement Concrete (1:2:4) (M20) Grade Nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for mixing, laying concrete in position, curing & lift charges etc., for finished item of work

5

7773

38869

... More
Construction of Ramps in MBA connecting corridor;Supplying and fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of Hindustan / Neycer or Parryware make white glazed with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 and 10 litres capacity single flush PVC low level cistern Parryware or equivalent with internal components and CP short bend and fixed using required size of nails and screws, 15mm PVC connections with brass union nuts CP coated and Brass body CP finish Angle Cock of not less than 400 grams weight with quarter turn spindle including cost and conveyance of all materials to site, etc., complete for finished item of work for all floors.

1

6150

6150

... More
Construction of Ramps in MBA connecting corridor;Supplying & fixing CI floor traps 1st quality ISI marked with C.P. Grating fixing with white cement as per site requirements with standard practice for nominal dia 100 mm (4") and grating size 100 mm dia of weight not less than 6 Kgs.

2

790

1580

... More
Construction of Ramps in MBA connecting corridor;Supplying & fixing CI Plug (Door) bends Ist quality ISI marked conforming to IS:1729-1979 with cement caulked joints and fixing as per site requirements with standard practice for 4" dia (101.6 mm) .

4

545

2180

... More
Construction of Ramps in MBA connecting corridor;Making drainage connection from a drainage line into an existing inspection chamber/ manhole including making a hole into the chambers, placing necessary pipes in the connection and making good the junction in and out of the chambers including cost of necessary cement, sand and aggregate etc.,

3

167

501

... More
Construction of Ramps in MBA connecting corridor;Brick masonry for Panel walls 230mm thick in superstructure with CM (1:8) prop: (Cement : Screened Sand) using Second Class Clay Bricks of size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work.

6

8585

51515.4

... More
Construction of Ramps in MBA connecting corridor;Painting with Acrylic Emulsion paint weather proof water-based, modified acrylic with silicon additives exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ Lit. ( Asian / Berger / Nerolac ) to Exterior Faces of New Walls in 2 coats with approved make / shade and colour over primer coat of Water based cement primer of Exterior Gr-II (Asian / Berger / Nerolac ) MAKING 3 COATS including cost and conveyance of materials like Acrylic Exterior paint, white cement primer to site including cost of brushes, scaffolding charges, lift charges and labour charges such as preparing the wall, applying primer coat , two coats of Acrylic Exterior emulsion etc., complete for finished item of work External walls in all floors

21

211

4439.4

... More
Construction of Ramps in MBA connecting corridor;Earth work excavation for (Sumps, Ramp, Tanks and Open Excavation) and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and complete for finished item of work excluding dewatering charges in Ordinary Soil-Mannual Means.

10

277

2777

... More
Construction of Ramps in MBA connecting corridor;Supplying & fixing CI Plain bends Ist quality ISI marked conforming to IS:1729-1979 with cement caulked joints and fixing as per site requirements with standard practice for 4" dia (101.6mm) .

2

450

900

... More
Construction of Ramps in MBA connecting corridor;Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of approved make with cement caulked joints and fixing as per site requirements including painting black with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in cement mortar (1½:1) including fixing of M.S. clamps, if necessary, with required no. of Bombay nails etc., complete for 4" dia (101.6mm) Single Socket.

14

1195

16730

... More
Construction of Ramps in MBA connecting corridor;S&F of Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 10 years warranty etc., complete.

1

3524

3524

... More
Construction of Ramps in MBA connecting corridor;Supply and fixing of Stainless Steel (304 grade) Hand Railing as per approved drawing with top rail of 63 mm dia. & 2 mm thick, vertical posts of 50 mm dia and 2 mm thick and 20 mm dia & 2 mm thick and two rows of 15 mm dia. & 1.6 mm thick medium class pipes including fixing verticals to 75 mm dia. base plates using bonding agent and anchor fastner and welding including fixing railing, buffing, polishing all members of the railing thouroughly, lacquer finishing to presement seamless finish including cost and conveyance of all materials, welding charges cost of all consumables, labour charges etc., complete for finished item of work.

42

6731

282702

... More
Construction of Ramps in MBA connecting corridor;Plain Cement Concrete (1:4:8) (Cement: Fine Aggregate (unscreen sand) : Coarse Aggregate (Metal) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work.

11

5426

59692.6



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.