Nalsar University Of Law Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 3,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
395784Bid Award Id
ViewTender No
Certain Modification of Seminar Hall IIITender Authority
Nalsar University Of Law ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Certain Modification of Seminar Hall III;Supply, Installation and testing of 22W +/ 10% , >/ 2300 lumens, 1200mm length LED light housing made with aluminum anodised body,wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driverand frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., for mounting on Wall/ Surface/Suspendablecomplete with 5 years warranty with BIS Certification. LUMINAIRE MAKE: Phillips / GE Venture / Wipro / Crompton / Havells LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs. "
15
820
12300
Certain Modification of Seminar Hall III;Supply and fixing of modular Stepped electronic regulator with all connections and labour charges etc complete. Makes : Legrand Myrius / GM Four Five / Million mway / Goldmedal Curve / Anchor Roma viola / Havells Fabio / Polycab Levana.
3
534
1603.5
Certain Modification of Seminar Hall III;Supply, Transportation and fixing of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM( tolerance as per IS:374-2019), THD less than 10%. with remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete. Makes : Atomberg (Efficio ) / Havells / Orient
3
2990
8970
Certain Modification of Seminar Hall III;"Wiring with run of 3 of (1.5 Sq.mm) FRLS / HFFR PVC insulated flexible ISI marked copper cable make in existing consealed pipe including supply and fixing of 3 Plate Jumbo Ceiling rose of Anchor / Gold Medal Olive / Million Zoom make and 6A ISI marked Modular type switch including cost and conveyance of all material and all labour charges etc., complete for fan and exhaust fan points in N.R.B. Makes : RR kabel / Havells / Beljin(HFFR)/Million(HFFR) / Polycab (HFFR) / V-Guard (HFFR). Accessories Makes : Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision / Polycab Levana.
3
927
2781.75
Certain Modification of Seminar Hall III;"Wiring with run of 2 of (1.5 Sq.mm) FRLS / HFFR PVC insulated flexible ISI marked copper cable make in existing consealed pipe including supply and fixing of 3 Plate Jumbo Ceiling rose/batten holder of Anchor / Gold Medal Olive / Million Zoom make and 6A ISI marked Modular type switch including cost and conveyance of all material and all labour charges etc., complete for light and bell points in N.R.B. Makes : RR kabel / Havells / Beljin(HFFR)/Million(HFFR) / Polycab (HFFR) / V-Guard (HFFR). Accessories Makes : Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision / Polycab Levana.
6
745
4470
Certain Modification of Seminar Hall III;Supply and fixing of Anchor fastner with fan hook / Providing MS Fan hook with grouting and cement plastering.
3
107
321
Certain Modification of Seminar Hall III;Supply, Transportation, Fabrication, and Fixing of 10mm thick UV resistant multiwall polycarbonate sheets fixed to the purlins with aluminum universal glazing set 40mm wide for jointing and fixing sheets and 14 size self-drilling screws with neoprene washer. Side laps are stitched with self-tapping /drilling screws. End laps are to be sealed with 25x3 mm Butyl tape including cost and conveyance of all materials and labour charges, overheads and contractor?s profits, and removal of Old damaged sheets etc., complete for finished item of work inclusive of applying 2 coats of synthetic enamel paint ot the MS rafters, purlins and verticle members.
17.82
2175
38758.5
Certain Modification of Seminar Hall III;MS steel fabrication
1920
109
209280
Certain Modification of Seminar Hall III;Double Door Flush Shutter with frame and hardware
3
3800
11400
Certain Modification of Seminar Hall III;Painting with 2 coats of ready mixed oil bound washable distemper of approved brand and shade over a base coat of Cement primer interior grade ? 1 of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges, and overheads & contractors profit complete etc. complete for finished item of work as per SS 911 for all floors.
100
149
14900
Certain Modification of Seminar Hall III;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work for internal walls & External walls. (SS 901,903 & 904) - Ground Floor
100
385
38500
Certain Modification of Seminar Hall III;Masonry work in CM(1:6) prop with flyash Cement / lime solid blocks of size 290mm x 225mm x 140mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs , Gypsum of 5kgs and stone dust including cost and conveyance of all materials, labour charges, seigniorage charges, scaffolding and curing etc., and Overheads & Contractors profit complete with a compressive strength not less than 50 kg/sq.cm for super structure wall (APSS No. 501 & 504). - Ground Floor
11.5
6242
71783
Certain Modification of Seminar Hall III;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for mixing, laying concrete in position, curing etc., & lift charges , and overheads & contractors profit for finished item of work. (APSS No. 402)
0.67
5434
3619.04
Certain Modification of Seminar Hall III;Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting,overheads & contractors profit etc., complete for finished item of work including seigniorage including dewatering charges including Overheads & contractor Profit etc. complete
3
120
360
Certain Modification of Seminar Hall III;Dismatling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100 m lead
6.75
3500
23625