Municipality Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Civil And Construction
Pipe Line Project
Opening Date19 May 2025
Closing Soon23 May 2025
Tender Amount₹ 4,77,152
Costs
EMD
₹ 4,772Document Cost
Refer DocumentsTender Fee
₹ 1,500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
597738Tender No
E1/872/Wad No 23/2025/W1Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Pipeline;125X110mm HDPE Reducer
2
279
558.98
... More
Pipeline;Supply and Fixing of Composite Strap Saddle shall be of wrap around design, PN-16 rating. Body shall be manufactured using virgin compounded PE80/PE100 polymer with Stainless steel 304 grade stirrup plate mounted with PE straps(Engineering plastic) with Nut bolt joint. Sealing between the saddle and mains shall be obtained by using an elastomer seal(Underneath projection for self interlocking).The cost shall include testing of all materials, labour, inspection charges, transportation up to site, transit insurance, loading, unloading, stacking, providing and fixing etc. Complete as specified and directed by the Departmental Engineers, but excluding all taxes.
20
537
10748
... More
Pipeline;In ordinary soils, by Manual means. Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.where depth is < 1.5 times width
14.4
463
6677.28
... More
Pipeline;Supply and Fixing of Compression Fittings shall comply with ISO 17885 ? 2015, PN-16 rating and manufactured from virgin resin of PE-80 having blue colour. Raw material must be WRAS Approved as per BS 6920 for effect on water quality intended for human consumption. Compression fittings should have moulded-in SS 304 threaded insert outlet with thread dimension conforming to IS 554/ISO 7. The cost shall include testing of all materials, labour, inspection charges, transportation up to site, transit insurance, loading, unloading, stacking, providing and fixing etc. Complete as specified and directed by the Departmental Engineers, but excluding all taxes.
-
-
-
... More
Pipeline;Cutting Water bound macadam road surface including stacking of excavated materials for pipe line trench work. as directed by the departmental officers.
1.36
327
445.01
... More
Pipeline;Manufacture, Supply and Delivery of Cast Carbon Steel rising / Non rising spindle sluice valve design standard as per IS:14846/2000 for Water Supply Scheme with with SS Spindle & SS Working parts the grade of Cast Steel for body Bonnet, Dome, Stool Cover, Wedge, Stuffing Box, Gland Thrust Plate, shall be as per IS : 1030 /1998. (The valve shall be used for High pressure schemes & pumping stations) excluding transportation etc., complete. ISI Marked
1
31950
31950.14
... More
Pipeline;PHE-JCIF-5-: Jointing CI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete. (Reference to specifications. BIS No.3114/1994.)
2
460
921.62
... More
Pipeline;110mm dia end cap
6
94
565.8
... More
Pipeline;Manufacture, Supply & Delivery of MDPE pipe conforming to ISO 4427 Part-2 (or any equivalent Bureau of Indian Standards code) of PE-80 grade material along with all fittings, including cost of materials, manufacturing, loading, unloading, stacking, transit insurance, transportation to anywhere in Telangana excluding GST.
120
28
3445.2
... More
Pipeline;In ordinary soils, Earthwork excavation in all kinds of soil trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete By Mechanical means
3.78
128
484.71
... More
Pipeline;Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work.
1.26
1203
1516.02
... More
Pipeline;Compression Male/Female threaded elbow with SS Insert D20mmx1/2"
20
120
2408.6
... More
Pipeline;110mm dia bend
2
316
633.98
... More
Pipeline;Cutting open C.C Road.including stacking of excavated materials for pipe line trench work. as directed by the departmental officers.
0.72
2664
1918.27
... More
Pipeline;Manufacture, supply, & delivery of Polyethylene pipes (PE-100 Grade) for water supply conforming to IS 4984-2016 including transportation to any where in T.G, but excluding GST and specials etc., complete. (Supply upto 90 mm dia in coil & above 90 mm dia stright length in6 M.)
430
403
173433.3
... More
Pipeline;Manufacture, Supply and Delivery of Cast Carbon Steel rising / Non rising spindle sluice valve design standard as per IS:14846/2000 for Water Supply Scheme with with SS Spindle & SS Working parts the grade of Cast Steel for body Bonnet, Dome, Stool Cover, Wedge, Stuffing Box, Gland Thrust Plate, shall be as per IS : 1030 /1998. (The valve shall be used for High pressure schemes & pumping stations) excluding transportation etc., complete. ISI Marked
3
21293
63881.28
... More
Pipeline;PHE-CISV-15 : Lowering, keeping in position and fixing C.I. sluice valves (with cap / with hand wheel & reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces
3
224
674.25
... More
Pipeline;Supply and fixing of regulating brass ferrule cost shall include testing of all materials, labour, Inspection charges, Transportation upro site, transit insurance, loading, unloading, stacking, providing and fixing etc. complete as specified and directed by departmental engineers, but excluding of all taxes.
20
154
3090.4
... More
Pipeline;Lowering, Laying, jointing of MDPE pipes as per BIS No.7634 part-III/75 for PVC and BIS No.7634 part-II/75 for HDPE pipes including earth work excavation, testing to hydralic test pressure including cost of water with a water lead of 500m etc., complete.
120
46
5589.6
... More
Pipeline;110mm dia Ms flange
5
189
948.7
... More
Pipeline;PHE-LCIS-1: Laying and jointing of HDPE pipes in ready made trench by butt fusion welding as per IS:7634 ? part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required measure but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994)
430
80
34688.1
... More
Pipeline;Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to work site, stacking but excluding taxes and duties.etc.complete
-
-
-
... More
Pipeline;110mm dia pipe end long neck
5
162
812.35
... More
Pipeline;Cutting open BT road surface including stacking of excavated materials for pipe line trench work. as directed by the departmental officers.
1.36
1280
1741.4
... More
Pipeline;In ordinary soils, by Mechanical means.Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Lines by mechanical means.
231
134
31101.84
... More
Pipeline;Carting away the surplus excavated material i.e.Earth and Rubble from the site to a suitable distance of about 5.00 Km including loading, unloading , conveyance charges and dumping the carted material at the contractors cost, labour charges, all leads & lifts and other incidental and operational charges etc., complete.
2.16
67
145.58
... More
Pipeline;Collection ,Supply and filling of sand from approved quarry to work site and stacking at work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH
15.48
1143
17700.14
... More
Pipeline;PHE-JCIF-5-: Jointing CI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete. (Reference to specifications. BIS No.3114/1994.)
6
303
1823.28
... More
Pipeline;PHE-CISV-15 : Lowering, keeping in position and fixing C.I. sluice valves (with cap / with hand wheel & reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces
1
380
380.94
... More
Pipeline;110mm dia HDPE Tee
5
311
1556.55
... More
Pipeline;Construction of M30 grade plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement @ 350 kg per cum or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.
2.52
6630
16709.69
... More
Pipeline;RBR-FNDN-1- ( II-A ) Ordinary rock (not requiring blasting) - up to 3.00 Mts. below GL by Manual means: Excavation in Ordinary rock for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means
60
900
54009
... More
Pipeline;125X125mm HDPE Tee
2
465
931.64
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%