Municipality Tender
... More
The Municipality has issued a formal invitation for competitive bids for Construction Of Slab Culvert On Major Storm Water Drain At Backside Of Kes Garden And Laying Of Approach Road In Div No.31 Est. Cost Of Rs. 43.00 Lakhs Under Dmft (recall) in Karim Nagar, Telangana, with an estimated contract value of Rs. 34,92,564. The bid opening date for this tender is 28-03-2025 and the last date for bid submission is 09-04-2025. Interested bidders for Municipality tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Municipality Tender
Opening Date28 Mar 2025
Closing Date9 Apr 2025
Tender Amount₹ 34,92,564
Costs
EMD
₹ 34,926Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
585413Tender No
E1/DB/MCK/8201/194/2024-25/1, Dt: 27-03-2025Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
slab culvert;Vibrated reinforced cement concrete M 30 grade design mix using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2), excluding cost & seigniorage conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing BD/1-69( A) but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2702 (5th Revision) and as directed by the Engineer-in-Charge
28.38
6902
195887
... More
slab culvert;Laying VCC in M20 grade 20mm graded SS-5 HBG m/c metal , coarse and fine aggregates conforming to IS: 383, and OPC cement including cost and conveyance of all materials, machinery, all labour charges (including placing in position expansion, contraction, construction, longitudinal joints and corner reinforcement if any but excluding cost of joint filler, sealant and reinforcement and its fabrication ), centering, vibration, curing for 21 days and all incidental & operational charges etc. complete conforming to standard specification for CC Pavement - 1 Cum
126
6902
869690
... More
slab culvert;Saw cut joints for freshly laid concrete pavement including all materials and labour chareges etc complete
45
92
4140
... More
slab culvert;Dewatering pipeline trenches etc duly out water from the pipeline trenches oil engine drivemn pumpsets including hire charges, fuel charges, and wages for driver and helper and all other incident and operational charges 5HP Motor
150
397
59666
... More
slab culvert;Earthwork in excavation for structures as per drawing and technical specifications including setting out construction of shoring and bracing removal of stumps and other deleterious material and disposal up to a lead of 50m, dressing of sides and bottom and back filling in trenches with excavated suitable material asper technical specification.
144
129
18628
... More
slab culvert;Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2), excluding cost & seigniorage conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing BD/1-69( A) but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2702 (5th Revision) and as directed by the Engineer-in-Charge
42.23
6461
272880
... More
slab culvert;RBR- FNDN-2 Collection , supply and filling of HBG Stone chipes 2.36mm and below spall from approved quarry to work site and stocking at work site to dept guage for premeasurements including cost and conveyance of all materials and labour charges etc., complete as per standard specification clause 305.39 MORD & 304 MORTH
144.92
1318
191103
... More
slab culvert;Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for base coarse below CC Pavement.
77.19
4938
381214
... More
slab culvert;Supplying, cutting, placing HYSD Bar reinforcement in foundation complete as per drawing and technical specification for bars below 36mm dia including over laps and wastage where they are not welded.
13535
87
1182418