Municipality Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 12,010Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
594413Tender No
E1/489-07/2025-26Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
PARK;BLD-CSTN-3-7-(24) Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , ,on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed. (Flooring Bed in front of Toilet area)
1.44
5610
8079.13
... More
PARK;Providing 110 mm Dia ISI marked P.V.C.down water take pipes 2.5mm thick 4kg/sq.cm pressure of ISI marked including cost of necessary PVC Bends, shoes, iron / PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials, sales & other taxes on materials to site, operational & incidental charges including all labour charges for fixing at site etc., complete for finished item of work. (APSS No. 1328) (110 mm dia)
15
205
3084.6
... More
PARK;BLD-CSTN-9-6-(104) : Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and design, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work,including the cost and conveyance of all materials.
8.4
999
8395.38
... More
PARK;ELEC-5.10.3: Supply and Transportation of control panel for three phase submersible motors above 5 HP up to 7.5 HP @ 415V 50Hz operating fitted with supply and fixing of Direct - on - Line LTLK (L&T) /BCH/ SIEMENS / CROMPTON make, 0-500V Volt meter and 0-30A Ammeter, Indication lamps, selector switches, CTS, 32A TP MCB, Single phase preventor, suitable contactor to with stand low voltage pick up and high voltage resistant, with IS marked capacitors assembled with ISI mark contactors and fitted with Legrand make IS! mark MCB etc., complete
1
18000
18000
... More
PARK;BLD-CSTN-12-1(168) & Sl. No.15, Pg. 398/403, SSR 2011-12(Data Amendment)): Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for Internal walls
21.42
270
5794.97
... More
PARK;BLD-CSTN-2-2(10) : Earth work excavation in Ordinary soils by Mechcanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
8.03
128
1030.01
... More
PARK;Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete.
3
154
462.96
... More
PARK;ELEC-5.6.1.d Supply and Transportation of star rated 7.50 HP 5-10 Stage Three phase ISI submersible motor pumpset suitable for 6* Bore well. Makes: Texmo / CRI/ KSB Aryenvarsha / Lubi / Falcon (7.50 HP 5-10 Stages Motor)
1
49800
49800
... More
PARK;BLD-CSTN-8-9-(84) : Plastering 20mm thick in two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (External walls)
38.96
598
23297.16
... More
PARK;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS (using Steel Scaffolding) Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted. (Toilet Slab Concrete)
2.6
12285
31941.68
... More
PARK;TBSP-F.I-01: S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal /external threaded connection conforming to IS 8931
6.17
312
1928.64
... More
PARK;ELEC-8.16.7: Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G. I pipe of 6.3mtr. long connected with reducer
1
5840
5840
... More
PARK;BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including ,on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .
3.54
5339
18920.86
... More
PARK;TBSP-JIll: Supply and Fixing.of premium make CPVC Pipes of different dismeters in ground or on wall including cost and conveyance of all materiais and labour charges complete for finished item of work. (For Internal lines 22.20mm OD Pipe - SDR 11 )
10
202
2022.3
... More
PARK;ELEC-3.4.7: Supply of 18 WPin type CFL Lamp. Makes: Phillips / Crompton / Bajaj / Surya/ Havells / HPL/ Halonix
3
152
456
... More
PARK;Drilling of Bore well by down the hole hammer drilling to a finished dia of 112/165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipc cte., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test. consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges and but excluding the cost of casing pipe, couplings, cap etc.. The entire work should be carried out as per IS -2800 Part 1 & Il 1979 and amended from time to time (Above 400 M and Avove )
500
500
250000
... More
PARK;BLD-CSTN-9-18-(116) see Ref:9-23-(121-b): Dadooing to walls with plain white glazed wall tiles of 200 x 300 mm / 245 mm x 325 mm size and of 5 to 7 mm thick set over a base coat of CM(1:3) Prop. 12mm thick and neat Gray cement slurry of Honey like consistancy sread at the rate of 3.30 Kg of cement per One Square Meter and jointed wiyh neat White cement paste mixed with pigmant of matching shade including cost and conveyance of all materials like cement, sand, water, flooring Tiles etc. to site, all operational, incidental and labour charges such as mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work (for toilets)
38.07
631
24033.21
... More
PARK;BLD-CSTN-3-7-(24) Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , ,on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed. (Flooring Bed in Toilet)
1.25
5610
7013.14
... More
PARK;BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)
11.8
77
912.3
... More
PARK;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including ,on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .(BGL)
9.45
5339
50455.63
... More
PARK;TBSP-H.I-01:Supplying and fixing of SWR PVC pipes (as per ISI standards) 4 Kg/Sg.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) Waste Water & Grey Waste Pipes and Vent Pipes & Rain Water Pipes (75 mm dia)
6
113
683.94
... More
PARK;BLD-CSTN-8-1(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm. .(Only for Ceiling)
12.13
218
2653.19
... More
PARK;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work
10.02
8407
84231.76
... More
PARK;BLD-CSTN-3-15- ( 31) -B; Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS IN BUILDINGS (Door Lintel)
0.08
15008
1190.93
... More
PARK;As per SSR 2024-25 Pg-539/594: Manufacture, supply, & delivery of High Density Polyethy lene pipes (PE-100 Grade) for water supply con forming to IS 4984-2016 including (40mm dia HDPE Pipe 16Kg)
180
119
21474
... More
PARK;BLD-ELEC-1-4.1 (b) :Supply and Fixing of 20mm dia1.5mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.
20
103
2066.2
... More
PARK;ELEC-1.2.3: Supply and delivery of FRPP Filexible Conduit Pipe 10 encase the submersible cable Make Precisionor is equivalet
80
22
1760
... More
PARK;BLD-ELEC-2-1-7 : Supply and fixing of CFL holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 18W Retrofit CFL (for new installation). Makes : CFL holder-( Phillips / Crompton / Bajaj / Surya / HPL / Havells.), 18W Retrofit CFL- ( Phillips / Crompton / Bajaj / Surya / Havells / HPL / Halonix.)
3
110
331.8
... More
PARK;ELEC -5.14.6e. Supply Transporaion and fiving of 150mm di alvanised bore cover 450m length ,12mm Thicknes and 75mm wide MS Clamp set with requied nuts 7 Bolts (Bore Cover )
1
260
260
... More
PARK;Supply & fixing white glazed European water closet with variety as approved by Engineer-in-charge, P" or S" trap with 4" CI outlet pipe of approved make, plastic seat and lid for EWC and rubber buffers as per ISI 2548 1963 with and low down porcelain flushing tank with lid 10 Lit Capacity with internal components and fixed with wooden gutties with required size nails, 32mm dia short CP bend, 15 mm PVC connections with brass union nuts and 12.70 mm (1/2")NP stop cock heavy duty (300 grams), complete including cost and conveyance of all materials to site, for finished item of work for all floors.
1
8095
8095.07
... More
PARK;Drilling of Bore well by down the hole hammer drilling to a finished dia of 112/165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipc cte., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test. consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges and but excluding the cost of casing pipe, couplings, cap etc.. The entire work should be carried out as per IS -2800 Part 1 & Il 1979 and amended from time to tim (Above 90 to 120 M)
30
500
15000
... More
PARK;ELEC-1.6.3.b Supply and delivery of PVC insulated and PV sheated flexible 3 core flat type submersible cables suitable for submersible pumpsets conductors composed of ennealed high conductivity copper wire, conforming to IS 694 with its revisions and ammendments from time to time and delivery at site of installation of pumpset including freight and transit. (3 Core 2.50 sqmm Cable for Borewell)
300
124
37200
... More
PARK;BLD-ELEC-2-1-3: Wiring with 2 runs of 14/0.3mm (1.0 Sqmm) P.V.C. insulated F.R flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Residential Buildings.
3
369
1108.59
... More
PARK;BLD-CSTN-8-10-(85) : Plastering 12mm thick in two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (Internal walls)
45.36
568
25775.82
... More
PARK;BLD-ELEC-6.1.3 : Supply and Run of 2 of 6 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains.
10
100
1004.5
... More
PARK;Amendment BLD-CSTN-2-8-Modification : Filling with gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
44.37
480
21305.76
... More
PARK;TBSP-E.I-01:Providing and fixing 23" (584.2mm) long white glazed Indian WC Orissa pan of parry/Neycer/HSW make with P or S trap with brick masonry seat, CC squatting plate and 10 lit capacity PVC slimline low level flush tank of approved make with internal components and fixed with wooden gutties as approved by Engineer-in-charge with required size nails, 15mm PVC connections 31.75 mm brass plumber union nuts, 32mm dia long CP bend and 12.70 mm (1/2")NP stop cock, heavy duty (300 grams), P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 6? alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges and ,etc., complete for finished item of work.
1
7095
7095.26
... More
PARK;BLD-CSTN-2-11 ; (New Item) : Earth work excavation Hard rock (blasting prohibited)-Up to 3 m depth using Hydraulic Excavator with Breaker Attachment for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage anf dewatering charges etc as per SS - 20 B (APSS 308)
1.2
1012
1219.83
... More
PARK;TBSC-L.I-18 Plastic Composite (WPC) Door shutter, comprising of 70% virgin polymer, 15% woodpowder (fibre), and the remaining 15% additives, comprising of virgin PVC polymer of K value 58- 60 (Suspension grade), Calcium carbonate and natural fibres (wood powder) and nontoxic additives (maximum toxicity index of 12 for 100 gms) having minimum door density of 650 kg/cum, screw withdrawal strength 1800N (Face) & 900N (Edge), Modulus of Elasticity 900N/mm2 and resistance to spread of flame of Class A Category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk SS screws all as per direction of Engineer -in- Charge (SS butt hinges and SS screws shall be paid separately) ( Toilet Doors -- Shutters)
3.15
2429
7651.63
... More
PARK;BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126) (Steel for Toilet Slab )
132.66
77
10252.9
... More
PARK;TBSP-A.I-09: Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with 304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover
2
850
1701.96
... More
PARK;ELEC-5.14.4.a: Supply, Transportation and fixing of following MS threaded Flanges 2 Nos with nuts and bolts including cost and conveyance of all materials, taxes etc. complete
20
370
7400
... More
PARK;TBSP-JIll: Supply and Fixing.of premium make CPVC Pipes of different dismeters in ground or on wall including cost and conveyance of all materiais and labour charges complete for finished item of work For External lines 28.60mm OD Pipe - SDR 11
30
266
8009.7
... More
PARK;Drilling of Bore well by down the hole hammer drilling to a finished dia of 112/165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipc cte., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test. consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges and but excluding the cost of casing pipe, couplings, cap etc.. The entire work should be carried out as per IS -2800 Part 1 & Il 1979 and amended from time to time (Above 120 to 150M)
30
500
15000
... More
PARK;Amendment BLD-CSTN-2-8-Modification : Filling with gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
4.5
480
2160.59
... More
PARK;Drilling of Bore well by down the hole hammer drilling to a finished dia of 112/165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipc cte., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test. consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges and but excluding the cost of casing pipe, couplings, cap etc.. The entire work should be carried out as per IS -2800 Part 1 & Il 1979 and amended from time to time (0 to 90 M)
90
500
45000
... More
PARK;BLD-CSTN-3-7-(24) Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , ,on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
1.05
5610
5891.04
... More
PARK;TBSP-C.II-30: Supplying & fixing Cl floor traps lst quality ISI marked conforming to IS: 1729-1979 with C.P. Grating fixing with white cement as per site requirements with standard practice for nominal dia 75 mm (3") and grating size 100 mm dia of weight not less than 4.0 Kgs
2
454
908.92
... More
PARK;Drilling of Bore well by down the hole hammer drilling to a finished dia of 112/165 mm dia in all formations suitable for down the hole hammer drilling such as medium hard rock formation to hard rock formation, all consolidated formation etc. and drilling in over burden to dia not less than 200 mm etc and reaming the bore well to suit insertion of suitable casing pipc cte., including insertion of casing pipe with couplings, caps any other relevant materials upto required depth as directed by the department including transportation of drilling rigs and supporting vehicle and including bore development (Flushing of Bore Well at an average pressure of 150 PSI) conducting yield test. consumables charges, Crew charges required in fixation of pipe assembly completely done to the satisfaction of the department and including all labour charges and but excluding the cost of casing pipe, couplings, cap etc.. The entire work should be carried out as per IS -2800 Part 1 & Il 1979 and amended from time to tim (Above 150 to 400 M )
250
500
125000
... More
PARK;TBSC-L.I-17 :Providing and fixing factory made solid Wood PolymerComposite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast.( Toilet Doors -- Frames )
9.9
882
8739.62
... More
PARK;BLD-CSTN-12-1(168) & Sl. No.17, Pg. 398/403, SSR 2011-12(Data Amendment)): Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for External walls
38.96
276
10753.94
... More
PARK;TBSP-G.III-19: Supplying & fixing Bronze Vertical Check (Non return) Valve as per IS-778 I-class heavy duty - 40 mm NB Size including cost and conveyance, all labour (Non return) Valve -- 50mm dia )
20
2865
57307.4
... More
PARK;BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work (Over Roof Slab )
17.36
644
11193.21
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%