For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Civil And Construction
Drainage Work
Opening Date7 Nov 2022
Closing Date24 Nov 2022
Tender Amount₹ 14,66,410 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Storm Water Drain from Sartaj Water Plant to Gali Mallaiah;Carting of surplus excavated rock/earth from the site to a distance suitable including loading unloading charges cost & convence charges labour charges all leads & lifits and other incidental and operational charges etc., complete. Up to 5KM

244.22

-

17340

... More
Storm Water Drain from Sartaj Water Plant to Gali Mallaiah;Providing Plain Cement Concrete (1:4:8) mix using 40mm nominal size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500, 1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for base coarse below CC Pavement.

50.88

-

287404

... More
Storm Water Drain from Sartaj Water Plant to Gali Mallaiah;PCC (1:3:6) using 20 mm size HBG crushed metal including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc.,to site seniorage charges on all materials, labour charges for mixing, laying concrete, ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work.

110.4

-

663624

... More
Storm Water Drain from Sartaj Water Plant to Gali Mallaiah;M30 Nominal Mix corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (Coarse Aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand) coarse aggregate water etc. to site and including Seigniorage charges, sales & other taxes on al materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work and including centering, shuttering.culvert cover slab

12

-

84414

... More
Storm Water Drain from Sartaj Water Plant to Gali Mallaiah;PCC nominal mix (1:2:4) prop. ( cement : fine aggregate : coarse aggregate) using 20 mm size HBG crushed metal including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc.,to site seniorage charges on all materials, labour charges for mixing, laying concrete,raming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work.(Bottom bed)/(Drain walls)

16.8

-

122128



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.