For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Civil And Construction
Drainage Work
Opening Date27 Jan 2025
Closing Date3 Feb 2025
Tender Amount₹ 6,91,631
Costs
EMD
₹ 6,916Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
572397Tender No
E2/2752/2024-120Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Road and Drain;RBR-SBBS-11 (B): Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared subbase and compacting with smooth wheel roller of 80 to 100kN/Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH. RBR-SBBS-11 For Pipeline
25.62
2241
57436.71
... More
Road and Drain;CC Road RBR-EECD-8(C): Earthwork in excavation for roadway in soil and drains as per drawing and technical specifications Clause 305.1 including setting out, removal of stumps and other deleterious material and disposal upto a lead of 50 m, etc complete for where depth is less than 1.50 times the width (RBR-FNDN-1)
10.98
74
818.23
... More
Road and Drain;Plain Cement concrete (M 20) Nominal Mix using 20mm Graded Metal corresponding to Table 9 of 15 456 using (20mm+10 mm) size graded machine crushed hard granite metal (coarse aggregate) from approved quarry includin cost and coriveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labou charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabricati charges for finished item of work-BLD-CSTN-2-11 Top Slab
1.1
8113
8925.3
... More
Road and Drain;Supplying fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded BLD-CSTN-2-18 For Slab
82.8
77
6400.44
... More
Road and Drain;Plain Cement concrete M20 using 20 mm HBG graded metal machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, Centering and laying concrete in under bed and side walls, compacted by vibration including curing for 14 days complete but excluding cost of steel and its fabrication charges for finished item of work as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4 For Drain Walls Drains
12.7
7891
100227.64
... More
Road and Drain;Plain Cement concrete (1:3:6) using 20 mm HBG graded metal machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, Centering and laying concrete in under bed and side walls, compacted by vibration including curing for 14 days complete but excluding cost of steel and its fabrication charges for finished item of work as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4 Bottom bed for drain
4.14
5006
20725.96
... More
Road and Drain;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under bed using coarse aggregate 40mm sze machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in under bed, ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work. (APSS No. 402)-BLD-CSTN-3-5
4.14
4594
19020.36
... More
Road and Drain;Supply and Filling with Crusher Stone Dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH including cost and conveyance of all materials and labour charges etc., complete for finished items of work. [RBR-FNDN-2.i]
4.14
1413
5853.55
... More
Road and Drain;Earthwork in excavation for roadway in soil and drains as per drawing and technical specifications Clause 305.1 including setting out, removal of stumps and other deleterious material and disposal upto a lead of 50 m, etc complete for where depth is less than 1.50 times the width (RBR-FNDN-1)
31.05
285
8860.43