Municipality Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 7,778Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
568039Tender No
E1/MMC-232/2024-25Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Laying of UGD Pipeline;Supply, Lowering and laying in ready made trench true to alignment and gradient, jointing, and testing of stone ware pipes including cost of jointing material such as cement mortar (1:1) proportion and Spun yarn including cost and conveyance of pipe. (Reference to specifications BIS No. 6530/72) 200MM Dia
36
1037
37347.84
... More
Laying of UGD Pipeline;Supply, Lowering and laying in ready made trench true to alignment and gradient, jointing, and testing of stone ware pipes including cost of jointing material such as cement mortar (1:1) proportion and Spun yarn including cost and conveyance of pipe. (Reference to specifications BIS No. 6530/72) 300MM Dia
40.5
2290
92772.14
... More
Laying of UGD Pipeline;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
85.5
129
11060.28
... More
Laying of UGD Pipeline;Cutting openCC road surface (as well as asphalt concrete upto 75 mm thick ) including water bound macadam and stacking of excavated materials for pipe line trench work. as directed by the departmental officers. (Pg. 506/617, Sl. No. 25 (a) (ii), SSR 2023-24)
12.82
2345
30074.62
... More
Laying of UGD Pipeline;Carting of surplus excavated rock / earth from the site to a distance of 10.00 Kms suitable including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.
7
109
765.8
... More
Laying of UGD Pipeline;BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
21
42
885.99
... More
Laying of UGD Pipeline;Rising of existing manholes manholes with cement brick (cm 1:6) and plastering 12mm thick in cm 1:4 including cost and conveyance of all materials and labour charges etc. for finished item of work . 0.30m Raising
8
773
6191.12
... More
Laying of UGD Pipeline;TBSC-T.I-15 Saw cut joints for freshly laid concrete pavement including all material and labour charges 2-3MM
490
68
33403.3
... More
Laying of UGD Pipeline;Vaccum drying of freshly laid concrete floor using 100 % air tight suction mat of suuitable size and length , vaccum pump to maintain vaccum pressure 0.7 to 0.8 atmospheres as per the standard procedure, floating with power floater, mechanical travelling, finishing with sound edgesand corners, including hire and operational charges of machinery, labour, fuel etc., complete for finished item of work as directed by Engineer - in- charge of the work
280
75
21000
... More
Laying of UGD Pipeline;RBR-CCPV-6: Construction of un-reinforced, dowel jointed, plain cement concrete pavement of M 30 Grade over a prepared sub base with 43 grade cement @ 350 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing and Technical Specification 602 MORTH.
42
5665
237951
... More
Laying of UGD Pipeline;RBR- SBBS-11B Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.
28
2329
65238.04
... More
Laying of UGD Pipeline;RBR-EECD-8(c) : Earthwork excavation for road way in soil by Manual means including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge- (Hydraulic Excavator)
28
76
2150.4
... More
Laying of UGD Pipeline;RBR-STCL-15: Dismantling of Cement Concrete Pavements as per Technical Specification Clause 202 MORD / MORTH. Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately.
42
1915
80449.32
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements