Municipality Tender
... More
The Municipality has issued a formal invitation for competitive bids for Laying Of Cc Road And Cc Drain At Various Places In Ward No.13 In Mahabubnagar Municipality in Mahabub Nagar, Telangana, with an estimated contract value of Rs. 25,15,107. The bid opening date for this tender is 29-01-2025 and the last date for bid submission is 03-02-2025. Interested bidders for Municipality tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Municipality Tender
Opening Date29 Jan 2025
Closing Date3 Feb 2025
Tender Amount₹ 25,15,107
Costs
EMD
₹ 25,151Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
572739Tender No
E2/2752-117/2024Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
CC road;Supply and Filling with Crusher Stone Dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH including cost and conveyance of all materials and labour charges etc., complete for finished items of work. [RBR-FNDN-211
24.71
1116
27598.6
... More
CC road;Carting of surplus earth including loading, unloading and conveyance upto 3 kms including all labour charges RBR-FNDN-2
357.78
122
43699.25
... More
CC road;Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum presssure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical travelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour, fuel etc., complete for finished item of work as directed by Engineer-in-charge of the work. (as per quotation)
1067.2
90
96048
... More
CC road;Plain Cement concrete M20 using 20 mm HBG graded metal machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, Centering and laying concrete in under bed and side walls, compacted by vibration including curing for 14 days complete but excluding cost of steel and its fabrication charges for finished item of work as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH RBR-FNDN-4 b) For Drain Walls
65.1
7864
511997.83
... More
CC road;Saw cut joints for freshly laid concrete pavement including all material and labour charges (Grooves 2-3mm) (as per quotation)
469.16
97
45841.62
... More
CC road;Plain Cement concrete (M20) Nominal Mix using 20mm Graded Metal corresponding to Table 9 of IS 456 using (20mm+10 mm) size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Selgniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc. complete but excluding cost of steel and ite fabbrication charges for finished item of work-BLD-CSTN-2-11
1.29
6835
8817.52
... More
CC road;Plain Cement concrete (1:3:6) using 20 mm HBG graded metal machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, Centering and laying concrete in under bed and side walls, compacted by vibration including curing for 14 days complete but excluding cost of steel and its fabrication charges for finished item of work as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4 Bottom bed Drains
25.28
5809
146864.16
... More
CC road;CC Road 1 RBR-EECD-8(c) Earthwork excavation for road way in soil by mechanical means including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge
160.08
127
20360.58
... More
CC road;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded BLD-CSTN-2-18 For Slab
97.03
88
8592.98
... More
CC road;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under bed using coarse aggregate 40mm size machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in under bed, ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work. (APSS No. 402)-BLD CSTN-3-5
24.71
4843
119680.17
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements