Municipality Tender
... More
The Municipality has issued a formal invitation for competitive bids for Construction Of Compound Wall To Muslim Grave Yard(khabarastan) Opp. Petrol Pump Rach-i In Ward No.6 Of Jangaon Municipality Under Mlc Cdp 2023-24 Funds (2nd Call) in Jangoan, Telangana, with an estimated contract value of Rs. 4,16,614. The bid opening date for this tender is 22-02-2024 and the last date for bid submission is 29-02-2024. Interested bidders for Municipality tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
501112Bid Award Id
ViewTender No
E1/Tender/599/2023-24/11, Dt: 19-02-2024Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
COMPOUND WALL;BLD-CSTN-2-8 (16) : Filling with QUARRY DUST in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
2.63
592
1554
... More
COMPOUND WALL;BLD-CSTN-2-2(10) : Earth work excavation in Ordinary soils by Mechcanical Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
31.5
276
8709
... More
COMPOUND WALL;BLD-CSTN-12-4-(171): Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Coat, 2 Coats (All Colours) to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912.
142.1
169
24067
... More
COMPOUND WALL;BLD-CSTN-3-3: Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M15 (1:2.5:5) using coarse and fine aggregates including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges, for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement
3.15
5761
18148
... More
COMPOUND WALL;BLD-CSTN-5-17-(55) : Brick Masonry work in CM (1:6) prop with Traditional 23*11*7 mm for manufacturing and including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqcm for walls for Superstructure Walls.
24.15
6423
155130
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements