Municipality Tender

... More
The Municipality has issued a formal invitation for competitive bids for Providing Sheet Compound For Four Sides Of The Proposed Scientific Solid Waste Management Park At Arutla Village Near Gundla Machnur In Sangareddy Under 15th Fc Grants in Medak, Telangana, with an estimated contract value of Rs. 38,38,912. The bid opening date for this tender is 07-06-2024 and the last date for bid submission is 18-06-2024. Interested bidders for Municipality tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Municipality Tender

Opening Date7 Jun 2024
Closing Date18 Jun 2024
Tender Amount₹ 38,38,912 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
SHEET COMPOUND FOR SOLID WASTE MANAGEMENT PARK;BLD-CSTN-2-2(10) : Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).by manual means

23.41

270

6331.7

... More
SHEET COMPOUND FOR SOLID WASTE MANAGEMENT PARK;BLD-CSTN-12-7-(174): Painting One Priming Coat on New Iron Work- with Red oxide primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

9

70

635.76

... More
SHEET COMPOUND FOR SOLID WASTE MANAGEMENT PARK;Providing and fixing in position of MS Tube of section 50x50x5mm for Vertical member @ 3m centre to centre and one additional inclined support at every 30m span, minimum of 600mm embedded in CC- M20 grade concrete Horizontal member with MS Tube of section 50x50x3mm at top and bottom and middle 2 Nos of MS Tube of section 25x25x2mm including fabrication and fixing as directed by the Engineer- in- charge,

19715.85

46

907914.89

... More
SHEET COMPOUND FOR SOLID WASTE MANAGEMENT PARK;BLD-CSTN-8-7-(82) : Plastering with 20mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 1 Sqm. (External walls)

6.18

573

3546.45

... More
SHEET COMPOUND FOR SOLID WASTE MANAGEMENT PARK;Supply and Fixing of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours fixing with G.I ?J? bolts & nuts 8 mm dia G.I plain washers complete for finished item of work, excluding the cost of purlins, rafters, trusses including cost and conveyance of all materials , labour charges , overheads and contractors profit etc., complete for finished item of work in all floors

2970

889

2640419.1

... More
SHEET COMPOUND FOR SOLID WASTE MANAGEMENT PARK;BLD-CSTN-11-5-(162) : White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work.

6.18

49

305.42

... More
SHEET COMPOUND FOR SOLID WASTE MANAGEMENT PARK;BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-25Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted

0.53

14359

7610.37

... More
SHEET COMPOUND FOR SOLID WASTE MANAGEMENT PARK;Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos 35x35x5mm Equal angles horizontal supports at 0.50m c/c, 2.00mm MS sheet at bottom 0.30m height and 12mm MS square bars Vertically at 125mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting gate with one coat of red oxide primer including cost and conveyance of all materials,Locking arrangment, Ornamental pieces etc ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work.

337.37

133

45045.64

... More
SHEET COMPOUND FOR SOLID WASTE MANAGEMENT PARK;BLD-CSTN-3-14-(31) - A : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the defference in cost shall be deducted

16.96

11422

193719.66

... More
SHEET COMPOUND FOR SOLID WASTE MANAGEMENT PARK;BLD-CSTN-11-8-(164): Colour washing two coats with approved Colour and quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials.

6.18

74

458.12



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.