The Municipality has issued a formal invitation for competitive bids for Remodelling Of Drainage Pipeline From Padmavati Glass Center To Sri Manikanta Sai Nagar Park, Amruta Bar To Penchal Reddy House, Rajireddy House To Jangareddy House Of Boduppal Municipal Corporation Under General Funds in Medchal Malkajgiri, Telangana, with an estimated contract value of Rs. 39,40,165. The bid opening date for this tender is 20-01-2025 and the last date for bid submission is 27-01-2025. Interested bidders for Municipality tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Municipality Tender
Civil And Construction
Drainage Work
Pipe Line Project
Opening Date20 Jan 2025
Closing Date27 Jan 2025
Tender Amount₹ 39,40,165
Costs
EMD
₹ 39,402Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
570370Tender No
E1/2633/2024-25/ Drainage PipelineTender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Drainage Pipeline;RBR-FNDN-4 I(i) : Providing P.C.C grade M 10 concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for foundation and under flooring bed.
12.29
5891
72410.96
... More
Drainage Pipeline;RBR-FNDN-1 (I-A-(i)) : Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
16.34
297
4857.06
... More
Drainage Pipeline;BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
201.67
42
8508.46
... More
Drainage Pipeline;BLD-CSTN-3-11-(28) Using Concrete mixture : Plain Cement concrete nominal mix M-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement
36.86
6877
253516.81
... More
Drainage Pipeline;A/c to SSR Pg:512/594:Manufacture, Supply and Delivery of Rubber rings to suit R.C.C.Socket and Spigot pipes conforming to B.I.S 5382/ 1985 (rate per each rubber ring) including transportation but excluding taxes. the Rubber Rings shall be tested at the factory premises confirming to B.I.S.5382/1985
101
502
50720.18
... More
Drainage Pipeline;Amendment 2021-22 BLD-CSTN-2-8 (16) : Filling with QUARRY DUSTin trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
78.87
637
50289.88
... More
Drainage Pipeline;Amendment 2021-22 BLD-CSTN-2-8 (16) : Filling with Stone Dust (below 2.36mm stone chips) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
19.12
1547
29597.19
... More
Drainage Pipeline;A/c to SSR Pg:495/594:Cutting BT road surface including stacking of excavated materials for pipe line trench work
269.21
1127
303399.67
... More
Drainage Pipeline;Carting of surplus excavated rock from the site to a distance of 5.00 kms suitable including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete with lead of 10km
67.54
72
4916.91
... More
Drainage Pipeline;BLD-CSTN-2-11 ; (New Item) : Earth work excavation Hard rock (blasting prohibited)-Up to 3 m depth using Hydraulic Excavator with Breaker Attachment for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring,sheeting`, planking, strutting, etc. complete for finished item of work excluding seigniorage anf dewatering charges etc as per SS - 20 B (APSS 308)
26.92
1020
27482.9
... More
Drainage Pipeline;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work
108.25
5237
566948.55
... More
Drainage Pipeline;RBR-FNDN-1 (I-B-(i)) : Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).Mechcanical Means-Upto 3 m depth
147.06
129
19023.68
... More
Drainage Pipeline;A/c to SSR Pg:510/594:Manufacture, Supply and Delivery of R.C.C. Socket and Spigot pipesconforming to B.I.S. 458/2003 at ex-factory (rate per meter of effective length) including transportation and taxes.
239
3712
887225.36
... More
Drainage Pipeline;RBR-FNDN-1 (I-B-(i)) : Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).Mechcanical Means-Upto 3 m depth
215.37
129
27860.26
... More
Drainage Pipeline;Amendment 2021-22 BLD-CSTN-2-8 (16) : Filling with Stone Dust (below 2.36mm stone chips) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
12.29
1547
19024.55
... More
Drainage Pipeline;Carting of surplus excavated rock from the site to a distance suitable including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete with lead of 5km
163.4
72
11895.52
... More
Drainage Pipeline;PHE-LRCS-6: Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead upto 500 meters excluding cost of rubber rings as per BIS No. 783/1985
239
288
69011.25
... More
Drainage Pipeline;TBSP-H.I-01:Supply and cutting and fixing of PVC/SWR pipes 4kg/cm2 including cost and conveyance and all taxes and labour charges etc complete
198.72
113
22652.09
... More
Drainage Pipeline;A/c to SSR Pg:495/594:Cutting CC road surface including stacking of excavated materials for pipe line trench work
24.47
2345
57382.15
... More
Drainage Pipeline;RBR-CCPV-6: Construction of un-reinforced, dowel jointed, plain cement concrete pavement of M 30 Grade over a prepared sub base with 43 grade cement @ 350 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing and Technical Specification 602 MORTH.
118.31
5750
680388.98
... More
Drainage Pipeline;BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500) grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)
1928.81
78
150543.62
... More
Drainage Pipeline;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS (using Steel Scaffolding) Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted.
24.84
10824
268885.3