Municipality Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
330885Bid Award Id
ViewTender No
E1/362/2021-22, dt: 17-06-2022Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
LAYING OF RCC TRUNK MAINS;BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126
955.96
-
103033
... More
LAYING OF RCC TRUNK MAINS;BLD-CSTN-3-16-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering, shuttering charges etc.,complete but excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code for finished item of work. for RCC SLABS, BEAMS (using Steel Scaffolding) Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted.
16.46
-
122543
... More
LAYING OF RCC TRUNK MAINS;BLD-CSTN-7-1-(72) : Providing flush Cement Pointing to CRS Masonary in Cement Mortor (1:3) Prop . for including cost & conveyance of all materials to site , seignaiorage charges on all materials, labour charges on all materials, curing etc., Complete for finished item of work
247.63
-
25735
... More
LAYING OF RCC TRUNK MAINS;BLD-CSTN-6-6-(61) : Construction of RR Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .
148.12
-
727174
... More
LAYING OF RCC TRUNK MAINS;BLD-CSTN-3-5 (22) -Using Concrete mixture all works : Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
9.46
-
48041
... More
LAYING OF RCC TRUNK MAINS;RBR-FNDN-2: Collection ,Supply and filling of Stone dust from approved quarry to work site and stacking at work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH
9.46
-
11950
... More
LAYING OF RCC TRUNK MAINS;RBR-FNDN-1 (I-B-(i)) : Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).Mechcanical Means-Upto 3 m depth
124.52
-
14666
... More
LAYING OF RCC TRUNK MAINS;RBR-FNDN-1 (I-A-(i)) : Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
53.37
-
12978
... More
LAYING OF RCC TRUNK MAINS;Carting of surplus excavated rock from the site to a distance suitable including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete with lead of 10km
169.56
-
25163
... More
LAYING OF RCC TRUNK MAINS;BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
480.06
-
80175
... More
LAYING OF RCC TRUNK MAINS;Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead upto 500 meters excluding cost of rubber rings. PG-446
216
-
178165
... More
LAYING OF RCC TRUNK MAINS;Manufacture, Supply and Delivery of Rubber rings to suit R.C.C.Socket and Spigot pipes conforming to B.I.S 5382/ 1985 (rate per each rubber ring) including transportation but excluding taxes. the Rubber Rings shall be tested at the factory premises confirming to B.I.S.5382/1985
91
-
98013
... More
LAYING OF RCC TRUNK MAINS;Manufacture, Supply and Delivery of R.C.C. Socket and Spigot pipesconforming to B.I.S. 458/2003 at ex-factory (rate per meter of effective length) including transportation and taxes. PG-462
216
-
1870348
... More
LAYING OF RCC TRUNK MAINS;RBR-FNDN-1 (B-(IV)): Earth work excavation in Hard rock (blasting prohibited)-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).
64.96
-
134415
... More
LAYING OF RCC TRUNK MAINS;RBR-FNDN-1 (I-A-(i)) : In ordinary soils, by Manual means Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construciton of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specificaiton 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all trenches with excavated suitable material and disposal of remaining earth upto a leand of 50m, including all incidental and operational charges ec., complete for Pipe lines by mechanical means
519.7
-
61210
... More
LAYING OF RCC TRUNK MAINS;RBR-FNDN-1 (I-A-(i)) : In ordinary soils, by Manual means Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construciton of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specificaiton 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all trenches with excavated suitable material and disposal of remaining earth upto a leand of 50m, including all incidental and operational charges ec., complete for Pipe lines by manual means
64.96
-
25670
... More
LAYING OF RCC TRUNK MAINS;Cutting CC road surface including stacking of excavated materials for pipe line trench work
129.6
-
303912
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements