The Municipality has issued a formal invitation for competitive bids for Laying Of Ugd Pipeline And Laying Of Cc Road From H.no.3-1-111 To H.no.3-155 From H.no.3-1-113 To H.no.3-1-117/6 At Veerannapet Area In Ward No.30 In Mahabubnagar Municipality in Mahabub Nagar, Telangana, with an estimated contract value of Rs. 8,35,023. The bid opening date for this tender is 27-01-2025 and the last date for bid submission is 03-02-2025. Interested bidders for Municipality tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Municipality Tender
Civil And Construction
Pipe Line Project
Opening Date27 Jan 2025
Closing Date3 Feb 2025
Tender Amount₹ 8,35,023
Costs
EMD
₹ 8,350Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
572404Tender No
E2/2752/2024-242Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Road and UGD;Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum presssure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical travelling, finishing with sound edges and corners, including hire and operational charges of machinaery labour fuel etc., complete for fiished item of work as directed by Engeer-in-charge of the workrs (per quotation)
306.6
90
27594
... More
Road and UGD;Manufacture, Supply and Delivery of 600 mm dia NP3 R.C.C. Spun/Vibrated Cast (Reinforced) Socket and Spigot pipes conforming to B.I.S. 458/2003 at ex-factory (rate per meter of effective length) 300 mm dia NP3 pipes
80
1994
159596
... More
Road and UGD;RCC NP3 300 mm dia Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work. as directed by the departmental officers.
2.7
2664
7195.15
... More
Road and UGD;Construction of un-reinforced, dowel jointed at expansion and construction 1501 zent, thickness as per design, over a prdat expansion and construction jointer Type esper 0501.2.2 M30 (Grade), coarse and fine aggregatred sub bass, with 4 grade concrete f 0.2 cum capacity and appropeiate weight gregates conforming to 15: 383, approved fed side form and of 125 mictron thick polythe seedged to plates including levelling the channel, laying and fixing per drawing), spreading the concrete in thick polythene film, wedges, stor plode, scareed and plate vibrators finished in continuous operation including provision of contraction and expansion, construction junts, p debonding strips, primer, sealant down provision of contactice bridge/culvert and construction Joints, approved, curing of concrete slabs for 21-days, curingprompound where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.
45.99
6730
309513.62
... More
Road and UGD;Saw cut joints for freshly laid concrete pavement including all material and labour charges(Groooves 2-3mm) (as per quotation)
149.7
68
10205.05
... More
Road and UGD;RBR-FNDN-1-(I-A-i) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 305 MORD / 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.
36
471
16973.28
... More
Road and UGD;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg.
13
9778
127124.92
... More
Road and UGD;RBR-EECD-8(C): Earthwork in excavation for roadway in soil and drains as per drawing and technical specifications Clause 305.1 including setting out, removal of stumps and other deleterious material and disposal upto a lead of 50 m, etc complete for where depth is less than 1.50 times the width (RBR-FNDN-1)
45.99
74
3427.17
... More
Road and UGD;RBR-SBBS-11 (B): Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared subbase and compacting with smooth wheel roller of 80 to 100kN/Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH. RBR-SBBS-11 For Pipeline
45.99
2241
103103.6