The Municipality has issued a formal invitation for competitive bids for Laying Of 300mm Dia Rcc Drain Pipeline And Cc Road From H.no.7-1-265 To 7-1-271 And 7-2-272 To 7-1-247 (santosh Kumar Sir Lane) In Div No.62 Of Mck Est. Cost Of Rs. 13.20 Lakhs Under Mgf in Karim Nagar, Telangana, with an estimated contract value of Rs. 10,65,572. The bid opening date for this tender is 10-11-2026 and the last date for bid submission is 20-11-2026. Interested bidders for Municipality tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Municipality Tender - Telangana Tender
Opening Date10 Nov 2026
Closing Soon20 Nov 2026
Tender Amount₹ 10,65,572
Costs
EMD
₹ 10,656Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Laying Of 300mm Dia Rcc Drain Pipeline And Cc Road From H.no.7-1-265 To 7-1-271 And 7-2-272 To 7-1-247 (santosh Kumar Sir Lane) In Div No.62 Of Mck Est. Cost Of Rs. 13.20 Lakhs Under Mgf
Contact
Tender Id
747550Tender No
E1/DB/8201/294/2026-27/77, Dt: 31-10-2026Tender Authority
Municipality ViewPurchaser Address
-Website
https://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
RCC drain pipeline;Groove cutting of 2-4 mm for 1/3rd depth of concrete slab using concrete groove cutting machine with diamond studded saw within 24 hours of casting of CC pavement including labour charges etc complete for finished item as directed by the Engineer-in-Charge
305
68
20792
... More
RCC drain pipeline;Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length,vaccum pump to maintain vaccum pressure 0.7-0.8 atmosphere as per the standard procedure,floating with power floater,vibrating using Screed vibrator, mechanical trowelling, finishing with sound edges and corners,including hire and perational charges of machinery ,labour,fuel etc,complete for finished item as directed by the Engineer-in-Charge.
700
87
61236
... More
RCC drain pipeline;Carting of excavated earth from site with lead up to 5 kms beyond initial lead including conveyance but excluding stocking charges etc complete.
7.5
131
986
... More
RCC drain pipeline;RBR- FNDN-2 Collection , supply and filling of HBG Stone chipes 2.36mm and below spall from approved quarry to work site and stocking at work site to dept guage for premeasurements including cost and conveyance of all materials and labour charges etc., complete as per standard specification clause 305.39 MORD & 304 MORTH
27.5
1560
42906
... More
RCC drain pipeline;Earthwork in excavation for structures as per drawing and technical specifications including setting out construction of shoring and bracing removal of stumps and other deleterious material and disposal up to a lead of 50m, dressing of sides and bottom and back filling in trenches with excavated suitable material asper technical specification.
22.5
147
3329
... More
RCC drain pipeline;Lowring the RCC S/S pipes carefully into the ready made trenches Laying them ture to alignment and gradient, jointing with rubber rings and testing including filling with water with water lead up to 500 meters including cost of reberrings
50
289
14465
... More
RCC drain pipeline;Laying of VCC road with M20 Nominal mix using 20mm graded SS-5 HBG M/c metal and OPC 43 grade including cost and conveyance of all materials machinary, labour charges including placing position expension, contraction, construction and longitudinal joints including centring, concrete mixer, vibration charges, curing for 21 days and all incidental and operational charges etc., complete cofirming to standard specification etc., complete. as per the instructions of Departmental Engineer site Incharge etc., complete.
105
6890
723517
... More
RCC drain pipeline;Plastering 12mm thick using SRC with cement mortar CM(1:4) Prop including cost and conveyance of all materials to site and lseigniorage fee, screenign mixing and laying, finishing with sponge finish and watering, curing including all lbour charges etc,. complete as per S.S.for finished item of work as per S.S
8.82
223
1969
... More
RCC drain pipeline;Manufactures supply and delivery of RCC Spun/vibrated cost (reinforced) socket and spigot pipes conforming TO B.I. S458/2003. EX-Factory (Rate per meter of Effetive Length) Excluding Transportati Taxes, Duties, etc complete. NP3 300mm dia
50
1676
83843
... More
RCC drain pipeline;Supply and placing separation membrane of impermeable plastic sheeting 125 micron thick under pavement slab including cost and conveyance etc. complete - 1 sq.m.
700
21
15113
... More
RCC drain pipeline;Constructing 457.2mm x 457.2mm (1'-6" x 1'-6") brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm (3'-0") and fitted with light weight 457.2mm x 457.2mm (1'-6" x 1"-6") frame and cover of 20kg., including cost and convenyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work.
8
5462
43701