For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Civil And Construction
Drainage Work
Opening Date20 Feb 2025
Closing Date27 Feb 2025
Tender Amount₹ 1,60,942
Costs
EMD
₹ 1,609Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
576129Bid Award Id
ViewTender No
E1/06/15FCG/TG/WNP/2024-25 Dt:19.02.2025.Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
NP3 Drain;Carting of excavated Earth up to an initial lead of 1 KM including including loading ,unloading but excludding stacking charges etc., Comp
19.65
72
1430.52
... More
NP3 Drain;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , excluding seigniorage charges but including on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
1.62
4607
7463.53
... More
NP3 Drain;Cutting road surface including stacking of excavated materials for pipe line trench work.
5.4
2664
14387.06
... More
NP3 Drain;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , excluding seigniorage charges but including on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
2.7
4607
12439.22
... More
NP3 Drain;Supply and Filling with 2.36mm and below HBG stone Chips as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH including cost and conveyance of all materials and labour charges etc., complete for finished items of work.
2.25
1173
2640.44
... More
NP3 Drain;Manufacture, Supply and Delivery of R.C.C. Spun / Vibrated Cast (Reinforced)Socket and Spigot pipes conforming to B.I.S. 458/2003 at ex-factory (rate per meterof effective length) Excluding transportation & taxes 300 Dia NP - 3 Class
30
1378
41340
... More
NP3 Drain;Lowering the RCC S/S pipes carefully into the ready made trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water lead upto 500 meters excluding cost of rubber rings as per BIS No. 783/1985.(300 Dia NP - 3 Class)
30
238
7144.5
... More
NP3 Drain;Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar
9.72
603
5863.59
... More
NP3 Drain;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level Plain Cement concrete nominal mix (1:2:4) prop (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement
1.94
5741
11109.22
... More
NP3 Drain;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, removal of stumps and other deleterious material and disposal upto a lead of 50 m, etc complete for pipe line trenches & building foundations where depth is less than 1.50 times the width (RBR-FNDN-1)
16.2
285
4622.83
... More
NP3 Drain;Collection , Supply & filling Gravel including watering, tamping, etc complete Including .
23.74
315
7485.93
... More
NP3 Drain;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , excluding seigniorage charges but including on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
1.69
4607
7786.03