Municipality Tender

... More
The Municipality has issued a formal invitation for competitive bids for Construction Of Cc Drain & Laying Of Cc Road At Various Places I.e. From H.no.6-3-44/1/a/1 To H.no.6-3-44/2 From H,no.6-3-ha001 To H.no.6-3-44-6 H.no.6-3-44/8/b To H.no.6-3-44/9/e From H.no.6-3-44/5/b To H.no.6-3-44/6/c At Hanumanpua In Ward No.12 In Mahabubnagar Municipality in Mahabub Nagar, Telangana, with an estimated contract value of Rs. 8,36,921. The bid opening date for this tender is 04-01-2025 and the last date for bid submission is 10-01-2025. Interested bidders for Municipality tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Municipality Tender

Works
Civil And Construction
Drainage Work
Opening Date4 Jan 2025
Closing Date10 Jan 2025
Tender Amount₹ 8,36,921 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
CC drain;Plain Cement concrete (M 20) Nominal Mix using 20mm Graded Metal corresponding to Table 9 of IS 456 using (20mm+10 mm) size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement. fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc..complete but fabrication charges for finished item of work-BLD-CSTN-2-11 Tob slab

1.29

8113

10466.94

... More
CC drain;Carting of surplus earth including loading, unloading and conveyance upto3kms including all labour charges RBR- FNDN-2 Qty as per item No.1 Restricted to 75%

49.28

157

7748.79

... More
CC drain;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thackrums an per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 ?30 (Grade), coarse and fine aggregates conforming to 15: 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh butcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges steel plates including levelling the formwork as per drawing spreading the concrete with sholvels, raken, compacted using needle. scareed and plate vibrators and finished in continuumus operation including provision of contraction and expansion, construction points. applying debonding strips, primer, sealant, dowel hars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 21- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD

49.28

6730

331655.39

... More
CC drain;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded BLD-CSTN-2-18 For slab Culverts

97.03

77

7500.42

... More
CC drain;Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum presssure 07-08 atmospheres as per the standard procedure floating with power floater,mechanical travelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour,fuel etc.complete for finished item of work as directed by Engineer-in-charge of the workas approved rate)

328.5

90

29565

... More
CC drain;Plain Cement concrete M20 using 20 mm HBG graded metal machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, Centering and laying concrete in under bed and side walls, compacted by vibration including curing for 14 days complete but excluding cost of steel and its fabrication charges for finished item of work as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4 For Drain Walls Drains

27.18

7714

209678.75

... More
CC drain;Saw cut joints for freshly laid concrete pavement including all material and labour charges (Groooves 2-3mm)

170.3

81

13930.54

... More
CC drain;Plain Cement concrete (1:3:6) using 20 mm HBG graded metal machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, Centering and laying concrete in under bed and side walls, compacted by vibration including curing for 14 days complete but excluding cost of steel and its fabrication charges for finished item of work as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4 Bottom Bed for Drain

8.44

5006

42252.92

... More
CC drain;RBR-SBBS-11 (B): Providing laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared subbase and compacting with smooth wheel roller of 80 to 100kN/ Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/MORTH.

49.28

2241

110479.35

... More
CC drain;Supply and Filling with Crusher Stone Dust as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH inchading cost and conveyance of all materials and labour charges etc, complete for finished items of work. [RBR-FNDN-2.i)

8.44

1413

11933.32



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.