For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GWMC Tender
Civil And Construction
Building Construction
Opening Date4 May 2025
Closing Date19 May 2025
Tender Amount₹ 81,20,480
Costs
EMD
₹ 81,205Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
593940Tender No
12/SE/GWMC/CTN 14 Recall/e-procurement/2024-25, Dated:- 30-04-2025Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://gwmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of Padmashali Community Hall Ground Floor (Balance Work) at Beside Kakathiya Canal Erra;Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work.
13.59
2808
38169.83
... More
Construction of Padmashali Community Hall Ground Floor (Balance Work) at Beside Kakathiya Canal Erra;Plain Cement concrete (1:4:8) using 40 mm metal with Concrete mixture. All work upto plinth level including cost and conveyance of all labour and materials charges etc., complete for finished item of work (Building) upto plinth level
13.59
5422
73689.33
... More
Construction of Padmashali Community Hall Ground Floor (Balance Work) at Beside Kakathiya Canal Erra;Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work
29.25
4890
143042.74
... More
Construction of Padmashali Community Hall Ground Floor (Balance Work) at Beside Kakathiya Canal Erra;BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
50.4
607
30624.05
... More
Construction of Padmashali Community Hall Ground Floor (Balance Work) at Beside Kakathiya Canal Erra;Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of charges on all materials, including all etc., Complete
504
8534
4301141.04
... More
Construction of Padmashali Community Hall Ground Floor (Balance Work) at Beside Kakathiya Canal Erra;Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (External
312
592
184753.92
... More
Construction of Padmashali Community Hall Ground Floor (Balance Work) at Beside Kakathiya Canal Erra;PCC (1:2:4) prop using ,20 mm and 10mm Walls Including coat of all materials like cement, coarse aggregate, fine aggregate and water etc., to site and Labour charges for machine mixing, layin concrete in position, vibrating and curing etc., including all incidental charges and operational charges etc., completed
16.8
5215
87627.46
... More
Construction of Padmashali Community Hall Ground Floor (Balance Work) at Beside Kakathiya Canal Erra;Ceeling :-Plastering with CM(1:3) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing
224
219
49114.24
... More
Construction of Padmashali Community Hall Ground Floor (Balance Work) at Beside Kakathiya Canal Erra;150mm thick slab
224
1743
390597.76
... More
Construction of Padmashali Community Hall Ground Floor (Balance Work) at Beside Kakathiya Canal Erra;Footings
20.25
9947
201445.38
... More
Construction of Padmashali Community Hall Ground Floor (Balance Work) at Beside Kakathiya Canal Erra;Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including excluding dewatering charges etc as per SS - 20 B (APSS 308). for FOUNDATIONS
70.4
297
20924.91
... More
Construction of Padmashali Community Hall Ground Floor (Balance Work) at Beside Kakathiya Canal Erra;Plinth Beam
7.17
13260
95105.38
... More
Construction of Padmashali Community Hall Ground Floor (Balance Work) at Beside Kakathiya Canal Erra;Painting to new walls with 2 coats of ready mixed oil bound ahsable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges
318.3
237
75624.9
... More
Construction of Padmashali Community Hall Ground Floor (Balance Work) at Beside Kakathiya Canal Erra;Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH,PEDESTALS and FOOTINGS.Note : 1) The cement content is adopted as350Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement
1
-
-
... More
Construction of Padmashali Community Hall Ground Floor (Balance Work) at Beside Kakathiya Canal Erra;Supply and Fixing of Structural Steel / Tubular including ,fabrication charges, welding Joints, all taxes & loading, unloading and transportation to site etc., complete with M.S.grills of 25mm square bars in 50x50x6mm.M.S.Angle frames including cost and conveyance of all materials and fixing in position fabrication charges etc., as per
1500
134
202380
... More
Construction of Padmashali Community Hall Ground Floor (Balance Work) at Beside Kakathiya Canal Erra;Columns
48.6
14142
687345.43