The GHMC has issued a formal invitation for competitive bids for the Municipal Corporation project, for Construction Of Storm Water Drain From Bandlaguda Cheruvu To Timmakka Cheruvu in Sangareddy, Telangana, with an estimated contract value of Rs. 13,30,92,711. The bid opening date for this tender is 28-01-2025 and the last date for bid submission is 13-02-2025. Interested bidders for Municipal Corporation tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Municipal Corporation - GHMC Tender
Drainage Work
Opening Date28 Jan 2025
Closing Date13 Feb 2025
Tender Amount₹ 13,30,92,711
Costs
EMD
₹ 13,30,930Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
572064Tender No
Tender Notice No 11 SE-I SNDP GHMC 2024 25 Item 1 Dt 25 01 2025Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Nala Work;Carting of surplus excavated Soil/rock within a lead of 15Km from the site to a distance suitable including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.
17716.06
291
5164231
... More
Nala Work;Supply and placing of Reinforced Cement Concrete (RCC) M30 by Ready Mix Concrete (RMC) as per IS 4926-2003 and standard mix design as per IS:10262:2009 with minimum cement content as per IS code 456-2000 (cement content is taken as 407Kgs) and with 20mm size graded (20mm-60% & 10mm-40%) machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting and fine aggregate confirming to IS 383-1970 (50% Natural Sand and 50% manufactured sand) including cost and conveyance of all materials, labour charges,water charges, pumping, including form work, laying concrete, vibrating, curing for 14 days, etc.,complete for finished item of work but excluding cost of steel and its fabrication charges and seigniorage charges as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH For Walls and Top slab of drain. Note: 1. The rate of RMC is worked out with 100% Cement, 50% Natural Sand and 50% manufactured sand. 2.The quantities for cement , coarse aggregrates and fine aggregrates are for estimating purpose only. The exact quantities will be as per mix design. 3. For estimate purpose Cement Content is taken as 407 Kg/Cum. As per mix design, if the cement content is found to be less than 407 kgs per cum of concrete, the difference in cost shall be deducted. 4.Manufactured sand (Rock Sand) not more than 50% of total sand content can be used.
3708.91
7942
29456571
... More
Nala Work;Providing & constructing Stone dust filling below foundation including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts.
1061.58
1656
1758815
... More
Nala Work;Laying Sand Bags in the stipulated places including cost of empty cement bag, sand, thread, stitching charges and labour charges for finished item of work.
5000
40
200000
... More
Nala Work;Supply and placing of Reinforced Cement Concrete (RCC) M30 by Ready Mix Concrete (RMC) as per IS 4926-2003 and standard mix design as per IS:10262:2009 with minimum cement content as per IS code 456-2000 (cement content is taken as 407 Kgs) and with 20mm size graded (20mm-60% & 10mm-40%) machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting and fine aggregate confirming to IS 383-1970 (50% Natural Sand and 50% manufactured sand) including cost and conveyance of all materials, labour charges,water charges, pumping, including form work, laying concrete, vibrating, curing for 14 days, etc.,complete for finished item of work but excluding cost of steel and its fabrication charges and seigniorage charges for Foundations as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for Foundation bed of retaining wall Note: 1. The rate of RMC is worked out with 100% Cement, 50% Natural Sand and 50% manufactured sand. 2.The quantities for cement , coarse aggregrates and fine aggregrates are for estimating purpose only. The exact quantities will be as per mix design. 3. For estimate purpose Cement Content is taken as 407 Kg/Cum. As per mix design, if the cement content is found to be less than 407 kgs per cum of concrete, the difference in cost shall be deducted. 4.Manufactured sand (Rock Sand) not more than 50% of total sand content can be used.
777.6
6614
5143661
... More
Nala Work;Providing barricading arrangement with casurina ballies as per the design duly excavating pits and its removal after the function is over including hire charges of the barricading materials as per the schedule given by the departmental authorities complete for finished item of work.
1800
98
178074
... More
Nala Work;Supplying, fitting and placing HYSD bar reinforcement Fe-500/500D/550D from steel manufacturers within telangana with minimum integrated installed production capacity of 2 lakh MT per annum ( AF Star TMT, MS life TMT, Radha TMT, Sugna TMT) in substructure complete as per drawings and technical specifications sections 1600 & 2200 MORTH including over laps and wastage, where they are not welded - for Retaining Wall Stem
66594.6
70
4666284
... More
Nala Work;Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and excluding backfilling-Manual Means-Depth upto 3 m
9049.41
360
3266475
... More
Nala Work;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial leadin layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310).
16758.16
45
764842
... More
Nala Work;Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe class 15 extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.
819
478
391687
... More
Nala Work;Supply of high performance expansion joint filler board conforming to IS: 1838 - 25 mm THICK in expansion joints including cost and conveyance of all materials, labour charges, fixing in position.
370.73
1347
499548
... More
Nala Work;Description
-
-
-
... More
Nala Work;Supplying, fitting and placing HYSD bar reinforcement Fe-500/500D/550D from steel manufacturers within telangana with minimum integrated installed production capacity of 2 lakh MT per annum ( AF Star TMT, MS life TMT, Radha TMT, Sugna TMT) in substructure complete as per drawings and technical specifications sections 1600 & 2200 MORTH including over laps and wastage, where they are not welded - for foundation of retaining wall ,base slab,walls and top slab of box drain
599604.3
69
41900348
... More
Nala Work;Supply and placing of Reinforced Cement Concrete (RCC) M30 by Ready Mix Concrete (RMC) as per IS 4926-2003 and standard mix design as per IS:10262:2009 with minimum cement content as per IS code 456-2000 (cement content is taken as 407 Kgs) and with 20mm size graded (20mm-60% & 10mm-40%) machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting and fine aggregate confirming to IS 383-1970 (50% Natural Sand and 50% manufactured sand) including cost and conveyance of all materials, labour charges,water charges, pumping, including form work, laying concrete, vibrating, curing for 14 days, etc.,complete for finished item of work but excluding cost of steel and its fabrication charges and seigniorage charges for Foundations as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for Foundation bed Bottom slab of Box Note: 1. The rate of RMC is worked out with 100% Cement, 50% Natural Sand and 50% manufactured sand. 2.The quantities for cement , coarse aggregrates and fine aggregrates are for estimating purpose only. The exact quantities will be as per mix design. 3. For estimate purpose Cement Content is taken as 407 Kg/Cum. As per mix design, if the cement content is found to be less than 407 kgs per cum of concrete, the difference in cost shall be deducted. 4.Manufactured sand (Rock Sand) not more than 50% of total sand content can be used.
2175.76
6994
15217309
... More
Nala Work;Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately, As Per MoRTH Specification No 202.
885.9
1368
1212682
... More
Nala Work;Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of Prestressed / reinforced cement concrete grade M-20 & above including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres. As Per MoRTH Specification No 202 (RCC).
72
2918
210164
... More
Nala Work;Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and excluding backfilling - Mechanical means - depth upto 3m
21115.28
134
2833882
... More
Nala Work;Dewatering by pumping out water collected by natural drainage including cost of all materials machinary, labour, drainage, lighting, and all other operations etc, complete using 5HP diesel dewatering pump.
9600
83
804768