Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GHMC Tender
Civil And Construction
Civil Works Others
Opening Date21 Jan 2025
Closing Date24 Jan 2025
Tender Amount₹ 5,34,300
Costs
EMD
₹ 13,358Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
570605Tender No
707/UB/2024-25Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Development of Park;Cost, supply and installation of Name board 3 feet x 4 Feet
1
15000
15000
... More
Development of Park;Cost, supply and installation of back rest support Cement Benches including transportation, loading, unloading and labour charges completed etc.,
8
7500
60000
... More
Development of Park;Maintenance of Individual shrubs: i) Trimming of shrubs once in 15 days ii) Watering to shrubs once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously) iii) Formation of basins for each and every plant upto 1 ft away from the plant iv) Application of fertilizers, insecticides, fungicides etc. a) with manual watering (for 3 months)
250
612
4594.57
... More
Development of Park;Maintenance of hedge/ shrub planting 1) Trimming of hedges once in 15 days 2) Watering hedges/shrubs once in a day @ 5 Ltrs per plant/per day ( Sub soil moisture shall be maintained continuously) 3) Formation of basins 1 feet away from the hedge. 4) Application of fertilizers, insecticides, fungicide for one year one labour daily must be present at the site and carry the necessary operations. It is responsible of the contractor to get the work done by the labou
200
2930
17584.74
... More
Development of Park;Maintenance of Lawns: Watering the lawns @ 10-15 ltr/Sqm/day basing on the season and weather conditions (Sub Soil moisture shall be maintained continuously) ii) Lawn moving and edging of the lawn in edging of the lawns in the following frequency, keeping the lawn grass blade not more than 2 cm 1) June to Nov - Once in 15 days. 2) Dec to May - Once in 30 days. 3) edging the lawns in such a way that the lawn grass do penetrate into the plants and in a defined perfect geometric shapes or smooth curves. 4) Keeping the lawns always in lush green & weed free condition. 5) Application of fertilizers, insecticides, fungicide etc., with manual watering for (3) months
220
924
6099.13
... More
Development of Park;Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material. ( Individual-200 no's and Periperals- 100 no's)
100
194
19407
... More
Development of Park;Digging the pit of size 0.30x0.30x0.30 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
150
129
19468.5
... More
Development of Park;Hedge / shrub planting: Digging the trench of size 15 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
200
317
63536
... More
Development of Park;Carpet grass laying and ramming
220
58
12782
... More
Development of Park;Bed preparation : Dressing the surface to the desired shape, laying 6" layer of fine red soil, covered with a thin layer of sand watering, rolling with hand roller (4" thickness after rolling), including the cost of red earth, sand and labour charges etc. complete but excluding the cost of fertilizers, chemicals and grass.
220
333
73425
... More
Development of Park;Supply & stacking of gravel at site to the department gauge for premeasurements and it shall be composed of wellgraded coars silicious grains sharp & gritty to touch and free from dirt & other deleterious matter. Further it shall not contain lumps larger, Internal transportation of Gravel and Application of Gravel including spreading .
110
432
47579.4
... More
Development of Park;Cast AAC kerbs pathway supply and fixing of AAC kerbs including cost and conveyence to site and labour charges complete etc,.
360
225
81000
... More
Development of Park;Carting of debris including excavation, loading, unloading and transport upto a lead of 10 km. Complete
64
174
11187.2
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements