Municipal Corporation Tender
... More
The GHMC has issued a formal invitation for competitive bids for the Municipal Corporation project, for Construction Of Storm Water Drain By Laying 900mm Dia Rcc Np4 Pipe Line From Near Welkins Park To Existing Nala To Avoid Major Water Logging On Sp Road In Ward No 149 Begumpet Circle-30, Ghmc, Sbz. (recall) in Medchal Malkajgiri, Telangana, with an estimated contract value of Rs. 1,37,97,534. The bid opening date for this tender is 28-05-2025 and the last date for bid submission is 02-06-2025. Interested bidders for Municipal Corporation tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Municipal Corporation - GHMC Tender
Civil And Construction
Drainage Work
Opening Date28 May 2025
Closing Date2 Jun 2025
Tender Amount₹ 1,37,97,534
Costs
EMD
₹ 1,37,975Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
600238Tender No
Short NIT No.13/SE(M)/SBZ/GHMC/2025-26, Date:27.05.2025 (Item No.1)Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
SWD Work;Providing barricading arrangement with casurina ballies as per design duly excavating pits and its removal after the function is over including hire charges of the barricading materials as per the schedule given by the departmernt authorities complete for finished item of work. 2-TIER (2 Nos Horizontals- 6'-0" long -1 No Vertical- 4'-0" High)
1040
202
210662
... More
SWD Work;Supply and placing of the Ready Mix Concrete (RMC) M30 grade Standard Design Mix Concretegrade as per IS4926- 2003 with minimum cement content as per IScode456- 2000 using 20mm graded metal, from standard suppliers approved by the department including pumping, laying concrete, centering, shuttering vibrating / screed / pan vibrating, curing etc. complete but excluding cost of steel and its fabrication charges, for finished item of work. (M30-350 Kgs) {50% natural river sand + 50% rock sand}
163.49
5624
919603
... More
SWD Work;Carting of excavated earth with a lead of about 14 KMts, including cost and conveyance of all materials and all labour charges, contractor profit and over head charges etc., complete for finished item of work as directed.
1360.32
274
372728
... More
SWD Work;Laying of Sand Bags in the stipulated places including cost of empty cement bag, sand, thread, stitching charges and labour charges etc., with 13.615% overhead charges and contractors profit. (Pg.No.30/594, Sl.No.97, SSR 2024-25)
1500
40
60000
... More
SWD Work;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 50m including all operational, incidental, Hire charges etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) in ordinary soils by mechanical means upto 3m depth (using hydraulic excavator)
1630.28
136
222990
... More
SWD Work;Mechanical trowelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour, fuel etc, complete for finished item of work as directed by Engineer-in-Charge (Pg.No.495/594, Sl.No.25(c), SSR 2024-25)
884
41
36244
... More
SWD Work;Filling with useful available excavated earth (excluding rock) sand/gravel/ stone dust/ chips in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. But excluding cost and conveyance of material. (APSS NO. 309 & 310) Earth/ Sand/ gravel filling (ordinary soil)
1401.48
47
66220
... More
SWD Work;Lowering the RCC S/S pipes carefully into the ready made trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water lead upto 500 meters excluding cost of rubber rings as per BIS No.783/1985. For 900mm dia (Pg.No.493/594, SSR 2024-25)
520
644
334880
... More
SWD Work;Plain Cement concrete 1:4:8 prop (Cement : fine aggregate: coarse aggregate ) for foundation and under flooring bed using 40mm size (SS 5) Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete in foundation ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work per 1 Cum. (hand mixing)
30.58
5582
170713
... More
SWD Work;Earth work excavation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308). Earth work excavation Hard rock (blasting prohibited)-Upto 3 m depth, using air compressor
689.52
1040
717708
... More
SWD Work;Hiring Dewatering pump 5 HP ( diesel ) including hire charges, fuel charges and crew charges (Pg.No.47/594, Sl.No.26, SSR 2024-25)
480
309
148608
... More
SWD Work;House service water supply pipe connections including cost and conveyance of all materials etc complete.
20
1048
20960
... More
SWD Work;Supply and placing of RCC M 30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading , curing for 14 days,vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc.,. This also includes Centering and scaffolding charges with labour charges for errection and dismantling of shuttering and steel scaffolding complete. complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design. (For top Slab) , Cement (@ 360 kg/Cum). For pipeline cps slab
54.83
7833
429499
... More
SWD Work;Cutting B.T. Road surface including stacking of excavated materials for pipe line trench work. (Pg.No.495/594, Sl.No.25(a) (i), SSR 2024-25)
265.2
1127
298880
... More
SWD Work;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH. (without paver finisher)
122.62
2257
276806
... More
SWD Work;Supplying, fitting and placing HYSD Fe 500 Grade steel for RCC works complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, including cost of all materail like HYSD bars, binding wire, chairs, space bars and all labour charges for cutting, bending, placing position, shifting to site, tying etc.. complete where they are not welded
28758
68
1958420
... More
SWD Work;Manufacture, Supply and Delivery of RCC NP4 Socket and spigot pipes confirming to BIS 458/2003 including rubber rings, cost and conveyance of all materials. For 900 mm dia (SSR item) (10km lead)
520
8248
4289277
... More
SWD Work;Junction Connection, for water supply pipe HDPE pipe including cost and conveyance of all etc., complete.
5
3491
17455
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements