Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GHMC Tender
Civil And Construction
Road Construction
Opening Date7 Jan 2025
Closing Date16 Jan 2025
Tender Amount₹ 14,14,153
Costs
EMD
₹ 14,142Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
563295Tender No
12/EEC-2/UPL/GHMC/50/2024-25, Dated : 15-10-2024Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Laying of SWD and restoration for CC road;Engaging dewatering pump of 5HP Diesel including all cost and conveyance charges
80
302
24208
... More
Laying of SWD and restoration for CC road;Manufacture, Supply and Delivery of R.C.C. Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes conforming to B.I.S. 458/2003 at ex-factory (rate per meter of effective length) Excluding transportation & taxes. NP3 600mm dia
115
4010
461170
... More
Laying of SWD and restoration for CC road;Lowering the RCC S/S pipes carefully into the ready made trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water lead upto 500 meters excluding cost of rubber rings as per BIS No. 783/1985.
115
285
32873
... More
Laying of SWD and restoration for CC road;Manufacture, Supply and Delivery of Rubber rings to suit R.C.C. Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes conforming to B.I.S 5382/ 1985 (rate per each rubber ring) including transportation but excluding taxes. the Rubber Rings shall be tested at the factory premises conforming to B.I.S. 5382/1985.
50
442
22100
... More
Laying of SWD and restoration for CC road;Filling with Earth filling (ordinary soil) useful excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
121.32
52
6370
... More
Laying of SWD and restoration for CC road;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded
1100
61
67793
... More
Laying of SWD and restoration for CC road;Supply and placing of RCC M 25 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design-FOR BOTTOM SLAB
39.12
5119
200304
... More
Laying of SWD and restoration for CC road;Supply and placing of RCC M 25 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design-FOR SIDE WALLS
12.58
8360
105140
... More
Laying of SWD and restoration for CC road;Supply and placing of RCC M 25 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design-FOR TOP SLAB
1.37
7873
10774
... More
Laying of SWD and restoration for CC road;Supply delivery and fixing of DI covers including cost and conveyance of all materials labour charges etc., complete for finished item of work 90KG 650mm*650mm
5
12807
64035
... More
Laying of SWD and restoration for CC road;Supply delivery and fixing of FRC square covers HD-20 including cost and conveyance of all materials labour charges etc., complete for finished item of work
18
3225
58050
... More
Laying of SWD and restoration for CC road;Carting the excavated earth to a lead of 5 KMS including Labour chargess for loading and unloading, Transportation etc. complete as per specification
218.4
100
21923
... More
Laying of SWD and restoration for CC road;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.
23.4
1950
45639
... More
Laying of SWD and restoration for CC road;Supply and placing of Ready Mix Concrete M 10 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete.(RMC-M10) Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used.2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design.
11.7
4321
50566
... More
Laying of SWD and restoration for CC road;Supply and placing of Ready Mix Concrete M 30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete.(RMC-M30) Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used.2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design.
23.4
5044
118053