Municipal Administration Department Tender
... More
The Municipal Administration Department has issued a formal invitation for competitive bids for Construction Of Balance Compound Wall Around The Dumping Yard In In Jammikunta Municipality-3rd Call in Karim Nagar, Telangana, with an estimated contract value of Rs. 4,12,742. The bid opening date for this tender is 12-04-2025 and the last date for bid submission is 21-04-2025. Interested bidders for Municipal Administration Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Municipal Administration Department Tender
Opening Date12 Apr 2025
Closing Date21 Apr 2025
Tender Amount₹ 4,12,742
Costs
EMD
₹ 4,127Document Cost
Refer DocumentsTender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
587929Tender No
9/MCJ/E1/2024-25/4, Dt: 11-04-2025Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of Balance Compound Wall;BLD-CSTN-12-3-(170) ; Painting Walls with approved Water Proof Cement Paint over Priming Coat, One Coat (All Colours) making 2 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912.
256
157
40424.96
... More
Construction of Balance Compound Wall;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level: Plain Cement concrete Nominal mix M-20 (Cement : fine aggregate: coarse aggregate) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work-Coping over Compound wall
0.72
5990
4312.86
... More
Construction of Balance Compound Wall;BLD-CSTN-8-7-(82) : Plastering with 20mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903)
256
262
67281.92
... More
Construction of Balance Compound Wall;BLD-CSTN-3-14-(31)-A: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for FOUNDATIONS, PLINTH, PEDESTALS Note : 1) The cement content is adopted as 380Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 380 Kgs/ Cum the difference in cost shall be deducted
-
-
-
... More
Construction of Balance Compound Wall;Footings
2.92
10979
32058.8
... More
Construction of Balance Compound Wall;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) bars (Fe-500/500D/550D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work.( APSS No.126)
537.2
66
35519.66
... More
Construction of Balance Compound Wall;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or traditional size 23x11x7 cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffolding charges, lift charges, curing charges etc., complete for finished item of work.
17.94
8167
146518.85
... More
Construction of Balance Compound Wall;BLD-CSTN-3-7-(24) Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand (50% River sand, 50% Rock sand), coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
1.69
4604
7781.6
... More
Construction of Balance Compound Wall;Plinth beams
2.15
14223
30581.34