Municipal Administration Department Tender
... More
The Municipal Administration Department has issued a formal invitation for competitive bids for Construction Of Storm Water Drain At Munnuru Ramulu House To Malle Cheruvu In Ramayampet Municipality. in Medak, Telangana, with an estimated contract value of Rs. 1,51,53,411. The bid opening date for this tender is 11-11-2026 and the last date for bid submission is 19-11-2026. Interested bidders for Municipal Administration Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Municipal Administration Department Tender - Telangana Tender
Opening Date11 Nov 2026
Closing Soon19 Nov 2026
Tender Amount₹ 1,51,53,411
Costs
EMD
₹ 1,51,534Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Construction Of Storm Water Drain At Munnuru Ramulu House To Malle Cheruvu In Ramayampet Municipality.
Contact
Tender Id
747874Tender No
E1/MCR/Construction of Strom Water Drain, Laying of CC Roads and Side Drains Nagarabhivruddhi Grants 2025Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
https://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of Storm Water Drain;RBR-FNDN-4- II (iii) : Providing PCC M15 nominal mix using 20 mm size graded HBG crushed metal including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc.,to site, labour charges for mixing, laying concrete,ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work as directed by Engineer-in Charge
3
6474
19424
... More
Construction of Storm Water Drain;BLD-CSTN-4-1-Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded
16921.92
66
1129369
... More
Construction of Storm Water Drain;RBR-STCL-5-Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH
124.95
1290
161212
... More
Construction of Storm Water Drain;RBR-FNDN-4 C(ii): Providing R.C.C. grade M 20 (Design Mix) concrete using 20 mm Graded Metal (MORD & MORTH 12.8 E), mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
246.93
7281
1798117
... More
Construction of Storm Water Drain;RBR-FNDN-4 C(ii): Providing R.C.C. grade M 20 (Design Mix) concrete using 20 mm Graded Metal (MORD & MORTH 12.8 E), mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
458.15
7702
3528676
... More
Construction of Storm Water Drain;BLD-CSTN- 2-8 modfied in 2025-26 : Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
83.3
1192
99331
... More
Construction of Storm Water Drain;RBR-EECD-9 -ii-B : :Excavation in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5 MORD / 301 MORTH , by Machanical means for Drains etc,.
76.01
1054
80149
... More
Construction of Storm Water Drain;BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500/500D/550D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work in all floors.( APSS No.126)
17689.38
66
1180589
... More
Construction of Storm Water Drain;RBR-FNDN-4 C(ii): Providing R.C.C. grade M 20 (Design Mix) concrete using 20 mm Graded Metal (MORD & MORTH 12.8 E), mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
89.25
7702
687404
... More
Construction of Storm Water Drain;RBR-FNDN-4 C(ii): Providing R.C.C. grade M 20 (Design Mix) concrete using 20 mm Graded Metal (MORD & MORTH 12.8 E), mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
270.73
7702
2085165
... More
Construction of Storm Water Drain;RBR-FNDN-4 C(ii): Providing R.C.C. grade M 20 (Design Mix) concrete using 20 mm Graded Metal (MORD & MORTH 12.8 E), mechanically mixed, placed and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
131.64
7281
958588
... More
Construction of Storm Water Drain;RBR-EECD-9 -ii-B : :Excavation in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5 MORD / 301 MORTH , by Machanical means for Drains etc,.
149.94
1054
158104
... More
Construction of Storm Water Drain;RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas construction of Storm Water Drains including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete.
2698.92
132
356851
... More
Construction of Storm Water Drain;RBR-FNDN-4-I-(i): Providing P.C.C- M 10 grade concrete for plain/reinforced concrete (Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
166.6
5709
951184
... More
Construction of Storm Water Drain;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for construction of Storm Water Drains including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete.
149.94
300
45018
... More
Construction of Storm Water Drain;BLD-CSTN-6-4 : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
1279.25
212
272199
... More
Construction of Storm Water Drain;RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for construction of Storm Water Drains including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete.
76.01
300
22821
... More
Construction of Storm Water Drain;BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
2796.5
212
595039
... More
Construction of Storm Water Drain;Carting away the surplus excavated earth from the work site with a lead of 5.0 km beyond initial lead including loading, unloading and conveyance but excluding stacking charges etc., complete for roads/drains- 1 cum
760.12
74
56857
... More
Construction of Storm Water Drain;RBR-FNDN-4-I-(i): Providing P.C.C- M 10 grade concrete for plain/reinforced concrete (Nominal mix 1:3:6) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
83.3
5709
475592