Mission Bhagiratha Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
285248Bid Award Id
ViewTender No
33/2021-22 Dt:24-12-2021Tender Authority
Mission Bhagiratha Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of New Infiltration well at Padigapur area including pipe line in Medaram Jathara in Mu;Manufacture, Cost of PVC / HDPE Pipes including all taxes and loading, unloading and transportation to site etc., complete for 110 mm dia 6 Kg/cm2 HDPE pipes
200
-
69532
... More
Construction of New Infiltration well at Padigapur area including pipe line in Medaram Jathara in Mu;Manufacture, Cost of PVC / HDPE Pipes including all taxes and loading, unloading and transportation to site etc., complete for 140 mm dia 6 Kg/cm2 HDPE pipes
300
-
149973
... More
Construction of New Infiltration well at Padigapur area including pipe line in Medaram Jathara in Mu;Manufacture, Cost of PVC / HDPE Pipes including all taxes and loading, unloading and transportation to site etc., complete for 160 mm dia 6 Kg/cm2 HDPE pipes
200
-
131794
... More
Construction of New Infiltration well at Padigapur area including pipe line in Medaram Jathara in Mu;Supplying, fitting and placing HYSD bar reinforcement in VRCC works complete including wastage, as per drawings and technical specifications, clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars 36mm dia and above, where welding required to be done compulsorily for Well curb, side walls and top slab
1000
-
78160
... More
Construction of New Infiltration well at Padigapur area including pipe line in Medaram Jathara in Mu;Well sinking in sandy and other loose soils under water either by manual labour, drivers or dredgers weighing the top of staining to assist sinking etc., including dewatering and other incidental charges such as hire charges for mechanical equipment etc., complete upto 7m dia (For perennial rivers) for 6.00 to 7.00 m
0.5
-
30661.64
... More
Construction of New Infiltration well at Padigapur area including pipe line in Medaram Jathara in Mu;Well sinking in sandy and other loose soils under water either by manual labour, drivers or dredgers weighing the top of staining to assist sinking etc., including dewatering and other incidental charges such as hire charges for mechanical equipment etc., complete upto 7m dia (For perennial rivers) for 4.00 to 6.00 m
2
-
105125.62
... More
Construction of New Infiltration well at Padigapur area including pipe line in Medaram Jathara in Mu;Well sinking in sandy and other loose soils under water either by manual labour, drivers or dredgers weighing the top of staining to assist sinking etc., including dewatering and other incidental charges such as hire charges for mechanical equipment etc., complete upto 7m dia (For perennial rivers) for 2.00 to 4.00 m
2
-
87604.68
... More
Construction of New Infiltration well at Padigapur area including pipe line in Medaram Jathara in Mu;Well sinking in sandy and other loose soils under water either by manual labour, drivers or dredgers weighing the top of staining to assist sinking etc., including dewatering and other incidental charges such as hire charges for mechanical equipment etc., complete upto 7m dia (For perennial rivers) for 0.00 to 2.00 m
2
-
70083.74
... More
Construction of New Infiltration well at Padigapur area including pipe line in Medaram Jathara in Mu;RCC M-20 Nominal Mix (1:1½:3) (Cement : Fine Aggregate : Coarse Aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including seigniorage charges, sales & other taxes on all materials including all operational incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering shuttering for top slab
1.18
-
17457.7
... More
Construction of New Infiltration well at Padigapur area including pipe line in Medaram Jathara in Mu;RCC M-20 Nominal Mix (1:0:3) (Cement : Coarse Aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including seigniorage charges, sales & other taxes on all materials including all operational incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering shuttering. for Side Walls
6.22
-
130136.08
... More
Construction of New Infiltration well at Padigapur area including pipe line in Medaram Jathara in Mu;RCC M-20 Nominal Mix (1:1½:3) (Cement : Fine Aggregate : Coarse Aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including seigniorage charges, sales & other taxes on all materials including all operational incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering shuttering. for Side Walls upto GL and above GL
5.6
-
119186.7
... More
Construction of New Infiltration well at Padigapur area including pipe line in Medaram Jathara in Mu;RCC M-20 Nominal Mix (1:1½:3) (Cement : Fine Aggregate : Coarse Aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including seigniorage charges, sales & other taxes on all materials including all operational incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering shuttering. for Triangular portion and for Curb portion ( rectangular)
4.58
-
70705.72
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements