Irrigation And CAD Department Tender
... More
The Irrigation And CAD Department has issued a formal invitation for competitive bids for Operation And Maintenance -repairs To Offtake Sluice And Pipe Culvert At Rd-18 On Lf Main Canal Of Taliperu Project, Cherla (m), Bhadradri-kothagudem (dist.) in Bhadradri Kothagudem, Telangana, with an estimated contract value of Rs. 7,94,045. The bid opening date for this tender is 23-05-2025 and the last date for bid submission is 30-05-2025. Interested bidders for Irrigation And CAD Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Irrigation And CAD Department Tender
Civil And Construction
Opening Date23 May 2025
Closing Date30 May 2025
Tender Amount₹ 7,94,045
Costs
EMD
₹ 7,941Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
598921Tender No
06/2025-26, Dt:-23.05.2025Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://https://irrigation.telangana.gov.in/icad/home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
OM;Laying and jointing 300 mm dia. NP-2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 24.8 kg / joint, FA : 0.025cum/joint, Hemp Yarn : 0.22kg/joint)
1
1086
1086
... More
OM;Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cmBefore compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning,etc.,complete with initial lead upto 1 km and all lifts.
202.5
132
26730
... More
OM;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement), CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
29.34
6647
195043
... More
OM;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
61.44
7263
446233
... More
OM;Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and Removing dust. After cleaning,applying primary coat with one coat of Protective Mastic to athickness of 70+5 microns ,followed by finishing coats 2 coats with Solventless Coal tar epoxy each coat with a DFT of 150+5 microns and total DFT of all coats including Primary coat should not be less than 350 microns with material, labour and all accessories with all leads and lifts (in respect of Heavily rusted (30 to 40% rusted) surfaces)
11.11
795
8837
... More
OM;Excavation for Structures- Mechanical Means ( Data adopted from MORTH) Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Depth upto 3 m
48.36
131
6350
... More
OM;OT SLUICE SHUTTERS EM parts for Below 5 Tons capacity (small gates) As per Guidelines of Chief Engineer, Central Designs Organization, Hyderabad Specification drawing for Krishna Delta System Fabrication, supply, erection, testing and commissioning of Embedded parts consisting of sil beam, slide tracks, seal seats, Guide plates etc. with all accessories including cost of all materials, machinery, labour, etc. complete as per specifications and approved drawings. (without painting on mechanical cleaning surfaces which are added extra as per schedule of rates under items in this chapter and add as applicable separately)
0.03
120834
3746
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements