For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Irrigation And CAD Department Tender

Works
Civil And Construction
Irrigation Work
Opening Date19 Dec 2024
Closing Date3 Jan 2025
Tender Amount₹ 5,56,879 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Reconstruction of DP at km 3.275 of D86 Main canal in Choppadandi (V and M), Karimnagar District.;IRR-PMW-3-21 PAINTING OF SLUICES FOR MAINTENANCE WORKS Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaniong, applying primary coat with one coat of Zinc rich epoxy primer to a thickness of 100 microns, followed by finishing coats 2 coats with Coal tar epoxy with material, labour, and all accessories with all leads and lifts.

10.53

546

5758

... More
Reconstruction of DP at km 3.275 of D86 Main canal in Choppadandi (V and M), Karimnagar District.;Manufacture, Supply of RCC Collars of 300 mm dia. (NP2 Class) including cost of Collar, Transportation, loading, Unloading etc. Complete as directed by the EIC.

5

136

683

... More
Reconstruction of DP at km 3.275 of D86 Main canal in Choppadandi (V and M), Karimnagar District.;Manufacture, Supply of RCC Plain Ended Pipes of 300 mm dia. (NP2 Class) including cost of Pipe, Transportation, loading, Unloading etc. Complete as directed by the EIC.

15

586

8804

... More
Reconstruction of DP at km 3.275 of D86 Main canal in Choppadandi (V and M), Karimnagar District.;IRR-CCDW-6-1 Laying and jointing 300 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials (excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 9.9 kg / joint, FA : 0.01cum/joint, Hemp Yarn : 0.091 kg/joint)

5

503

2516

... More
Reconstruction of DP at km 3.275 of D86 Main canal in Choppadandi (V and M), Karimnagar District.;IRR-PMW-3-19 Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as watering, compacting to density control of not less than 90 percent or as stipulated using 2T roller etc., complete with initial lead upto 1 km and all lifts.

538.95

9

5066

... More
Reconstruction of DP at km 3.275 of D86 Main canal in Choppadandi (V and M), Karimnagar District.;IRR-PMW-3-17 (For Minor Works) Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm Before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning,etc., complete with initial lead upto 1 km and all lifts.

538.95

199

107682

... More
Reconstruction of DP at km 3.275 of D86 Main canal in Choppadandi (V and M), Karimnagar District.;IRR-CAW-7-16 Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for bed and side lining of canal(100 mm thick) including finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. (manual lining)(Cement content: 290 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

4.88

5784

28199

... More
Reconstruction of DP at km 3.275 of D86 Main canal in Choppadandi (V and M), Karimnagar District.;IRR-CCDW-2-9 Providing and laying insitu vibrated M-15 (28 days cube compressive strength not less than 15 N/ sq mm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure/super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content:280 kg/cum with use of super plasticiser(0.4% by wt. of cement), CA: 0.90cum, Blending Ratio of CA-50:30:20, FA:0.40 cum)

28.73

6207

178341

... More
Reconstruction of DP at km 3.275 of D86 Main canal in Choppadandi (V and M), Karimnagar District.;IRR-CCDW-2-3 Providing and laying insitu vibrated M-15 (28 days cube compressive strength not less than 15 N/sq mm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement), CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

18.04

5851

105556

... More
Reconstruction of DP at km 3.275 of D86 Main canal in Choppadandi (V and M), Karimnagar District.;IRR-CCDW-1-2 Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.

133.4

124

16542

... More
Reconstruction of DP at km 3.275 of D86 Main canal in Choppadandi (V and M), Karimnagar District.;Dismantling of existing structures like culverts , bridges, retaining walls and other structures comprising of masonry, cement, concrete, wood work , steel work, including T&P and scaffolding wherever necessary sorting the dismantled material, disposal of unserviceable materials and stacking the materials with all lifts and lead of 1000 m (By Mechanical means in Rubble Masonry in Cement Mortar)Page 23,24,25 of MoRT&H SDB

13.65

547

7471



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.