Irrigation And CAD Department Tender
... More
The Irrigation And CAD Department has issued a formal invitation for competitive bids for Reconstruction Of Sluice Of Alimiya Tank, Balkonda(v And M), Nizamabad District in Nizamabad, Telangana, with an estimated contract value of Rs. 11,63,089. The bid opening date for this tender is 28-05-2025 and the last date for bid submission is 04-06-2025. Interested bidders for Irrigation And CAD Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 11,630Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
600560Tender No
T No 11/2025-26, Dt: 28-05-2025Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://https://irrigation.telangana.gov.in/icad/home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Reconstruction of sluice and Irrigation Channel;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. IRR-CCDW-2-9
8.44
6441
54348
... More
Reconstruction of sluice and Irrigation Channel;Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaniong, applying primary coat with one coat of Zinc rich epoxy primer to a thickness of 100 microns, followed by finishing coats 2 coats with Coal tar epoxy with material, labour, and all accessories with all leads and lifts. IRR-PMW-3-21
2.05
546
1119
... More
Reconstruction of sluice and Irrigation Channel;OT SLUICE SHUTTERS EM parts Fabrication, supply, erection, testing and commissioning of Embedded parts consisting of sil beam, slide tracks, seal seats, Guide plates etc. with all accessories including cost of all materials, machinery, labour, etc. complete as per specifications and approved drawings. (Excluding wastage of steel @ 2.5%) IRR-GAW-2-13
0.02
113674
2246
... More
Reconstruction of sluice and Irrigation Channel;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. IRR-CCDW-2-9
113.8
6441
733003
... More
Reconstruction of sluice and Irrigation Channel;OT SLUICE SHUTTERS for Below 5 Tons capacity (small gates) As per Guidelines of Chief Engineer, Central Designs Organization, Hyderabad Specification drawing for Krishna Delta System Fabrication, supply, erection, testing and commissioning of Sluice Shutters consisting of skin plate, horizontal and vertical angles, stiffeners, rubber seals, clamps with all accessories for sluice shutters including cost of all materials, machinery, labour, seal fixing etc., complete as per specifications and approved drawings (without painting on mechanical cleaning surfaces which are added extra as per schedule of rates under items in this chapter and add as applicable separately) GAW 2-14
0.03
294985
7903
... More
Reconstruction of sluice and Irrigation Channel;Earth work excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deletrious matter, dressing of sides and bottom and backfilling with approved material.(IRR-CCDW-1-2)
18.9
124
2344
... More
Reconstruction of sluice and Irrigation Channel;Providing casing embankment using semi-pervious soil available (New Item1 - 2011-12) from excavation in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all other operations such as re-excavation, sorting out, transportation, spreading in layers of specified thickness, breaking clods, sectioning, watering, compacting to specified density control of not less than 90 percent using 2 Tonne Roller as stipulated etc.,complete with initial lead upto 1 km and all lifts. (For Maintenance Works) IRR DAW 5-4-A
160.5
116
18682
... More
Reconstruction of sluice and Irrigation Channel;Manufacturing, supply and delevery of 800 mm dia. NP- 3 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
15
4888
73334
... More
Reconstruction of sluice and Irrigation Channel;Earth work excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deletrious matter, dressing of sides and bottom and backfilling with approved material.(IRR-CCDW-1-2)
293.2
124
36357
... More
Reconstruction of sluice and Irrigation Channel;Providing and laying insitu vibrated M10(28 days cube compressive strength not less than 10 N/sq mm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc, complete with initial lead upto 50 m and all lifts. (IRR-CCDW-2-5)
18.9
5157
97482
... More
Reconstruction of sluice and Irrigation Channel;OT SLUICE Screw Gear Hoist including platform below 5 tons capacity (small Gates): Fabrication, supply, erection, testing and commissioning of Embedded parts consisting of supporting structure, platform etc. with all accessories for operating canal escape/ regulator gate with all accessories including cost of all materials, machinery, labour, cutting, bending, aligning, anchoring, welding, finishing etc. complete as per Specification and approved drawings (Excluding wastage of steel @ 2.5%) IRR-GAW-2-12
0.19
165899
30745
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements