Hyderabad Metropolitan Water Supply And Sewerage Board Tender
... More
The HMWSSB has issued a formal invitation for competitive bids for the Hyderabad Metropolitan Water Supply And Sewerage Board project, for Laying Of 450mm Dia Np4 Sewerage Pipeline From 8-1-24 To Shoba Tent House, Kalyan Theatre Lane Under Hasmathpet Section, Sub Division Iii, O And M Division Ix. in K.V.Rangareddy, Telangana, with an estimated contract value of Rs. 15,89,708. The bid opening date for this tender is 15-04-2025 and the last date for bid submission is 21-04-2025. Interested bidders for Hyderabad Metropolitan Water Supply And Sewerage Board tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender
Opening Date15 Apr 2025
Closing Date21 Apr 2025
Tender Amount₹ 15,89,708
Costs
EMD
₹ 15,897Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
588476Tender No
EP- 20/CGM (E)/O and M Circle-IV/2025-26, Dtd: 11.04.2025.Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
laying of 450 SWG Line;Cutting of CC Road surface including labour charges, all leads and other incidential and operational charges tool and plants etc. complete as directed by the deptl. Officers.
67.33
2939
197936.73
... More
laying of 450 SWG Line;Redoing domestic sewer line connection incluidng EWE in all available soils and incluidng supply delivery and fixing of 100/150mm dia SWG pipes and including lowering laying and jointing in CM (1:1) prop; etc., complete. as directed by the departmental officers (100mm dia)
18
298
5364
... More
laying of 450 SWG Line;Construction of 1.20 M X 1.20 M diameter sewer manhole upto 1.80 M depth with cement bricks in CM 1:8 Prop. With CC bed 1:6 Prop with CC Bed 1:4:8 Prop. Benching with CC 1:2:4 Prop. Internal plastering 20mm thick in CM 1:3 Prop. And external plastering 12mm thick in CM 1:6 Prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and Frames as directed by the departmental officers.
12
37565
450780
... More
laying of 450 SWG Line;Carting of surplus earth from the site toa lead of 5 kms including laoading and unloading charges etc complete as directed by the deptl. Officers.
133.71
186
24994.93
... More
laying of 450 SWG Line;Supply of good quality gravel for filling where ever required as directed by departmental officers including cost and conveyance of gravel, stacking, levelling, watering, tamping rolling all leads, labour charges and other incidential and operational charges etc.,complete
67.32
714
48120.34
... More
laying of 450 SWG Line;Bailing out water with 5 hp engine driven pumps including hire charges fuel charges wages of driver and helper and all other incidental and operational charges including suction and delivery hoses lead of drain into natural drain etc. complete.
15
417
6255.3
... More
laying of 450 SWG Line;Supply and Delivery of 450mm RCC NP4 pipes cnfirming to IS 458-2003 using sulphite resistance cement conforming to IS 122330-1968 with inlining 8mm thick with high alumina cement conforming to IS 6452 in standard length with socket and spigot ends with suitable rubber and spigot ends with suitable rubber rings, lowering in the ready made trenches, laying true to alignment and gradient and jointing with rubber rings including cost and conveyance of all materials to site labour charges
125
3126
390750
... More
laying of 450 SWG Line;Conveyance of 300/250/200mm dia SWG pipes and specials from source of supply to work site including labour charges for loading and unloading including transportation charges etc.,complete
1
3720
3720
... More
laying of 450 SWG Line;Earth work excavation in Loamy and clayey soils, red earth and ordinary gravel and hard gravelly soils soft disintegrated rock etc as directed by the departmental officers, including leads and lifts, all incidential and operational charges etc and depositing the same on bank with an initial lead of 10 Mtrs and excluding dewatering including refilling etc., complete as directed by the departmental officers (for pipeline trenches)
155.88
497
77595.94
... More
laying of 450 SWG Line;Supply and fixing of encapsulated plastic steps each in manholes including cost and conveyance of all materials to site labour charges all incidental and operational charges etc., complete inside the manholes as directed by the departmental officers
36
215
7765.2
... More
laying of 450 SWG Line;Earth work excavation in hard rock, blasting prohibited. as directed by the deptl. Officers, including leads and lifts, all incidential and operational charges etc. and depositing the same on bank with an initial lead of 10 Mtrs and excluding dewatering etc., complete as directed by the deptl. officers
12.66
3543
44841.09
... More
laying of 450 SWG Line;Earth work excavation in Loamy and clayey soils, red earth and ordinary gravel and hard gravelly soils soft disintegrated rock etc as directed by the departmental officers, including leads and lifts, all incidential and operational charges etc and depositing the same on bank with an initial lead of 10 Mtrs and excluding dewatering including refilling etc., complete as directed by the departmental officers (for Manhole trenches)
84.59
324
27415.94
... More
laying of 450 SWG Line;Plain cement Concrete (1:2:4) mix using 6mm to 20mm guage hard granite machine crushed metal including cost and conveyance of all materials to site, hand mixing of concrete, lifts , leads form work laying in position,vibrating, compacting,curing all labour charges, tools and plants and all other incidental and operational charges etc complete.as directed by the department officers
25.31
6018
152354.42
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements