Hyderabad Metropolitan Water Supply And Sewerage Board Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender
Civil And Construction
Pipe Line Project
Water Storage And Supply
Opening Date10 Jan 2025
Closing Date15 Jan 2025
Tender Amount₹ 4,53,805
Costs
EMD
₹ 4,538Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
567715Tender No
EP-196/CGM(E)/O&MC-II/2024-25, dt: 10.01.2025 (Short Tender)Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Laying of 150mm dia DI water supply line in place;Redoing domestic sewer line connection including EWE in all available soils and including supply delivery of 150mm dia SWG pipes and including lowering laying and jointing in CM (1.5:1) prop. etc. complete upto 5' depth and refilling watering and tampering.
2
398
796
... More
Laying of 150mm dia DI water supply line in place;Redoing domestic sewer line connection including EWE in all available soils and including supply delivery of 100 mm dia SWG pipes and including lowering laying and jointing in CM (1.5:1) prop. etc. complete upto 5' depth and refilling watering and tampering.
5
298
1490
... More
Laying of 150mm dia DI water supply line in place;Redoing of 1/2 "PPC connections for domestic water supply connection including earth work excavation, cost of MDPE pipes, refilling etc. complete as directed by the deptl. Officers.
6
254
1526.4
... More
Laying of 150mm dia DI water supply line in place;Supply and delivery fixing of RCC precast manholes chambers having the size 36" at bottom tampering to 21" dia at top fixing over CC 1:4:8 prop. of required thickness along with FRC cover and frame and laying CC 1:2:4 prop. including cost of materials labour charges earth work, curing, C.C. and conveyance etc. complete as directed by the deptl. officers. (Sluice Valve Chamber WS)
1
6752
6752.4
... More
Laying of 150mm dia DI water supply line in place;Cutting of 150mm dia DI pipes without water in the mains as directed by the deptl. Officers.
2
276
552.8
... More
Laying of 150mm dia DI water supply line in place;Cutting of 300 mm dia DI pipes without water in the mains as directed by the deptl. Officers.
2
552
1105.8
... More
Laying of 150mm dia DI water supply line in place;Jointing the 150mm dia CI D/F pipe specials and valves including cost of jointing material such as bolts, nuts, rubber insertion, white led, lead and including filling water in mains and testing to required pressure etc., complete for the following diameters.
4
193
774.4
... More
Laying of 150mm dia DI water supply line in place;Jointing the 150 mmdia DI pipes fittings with rubber gaskets including cost of gasket but including all sundries filling with water and testing to required pressure including labour charges and all other incidental and operational charges etc., complete for the following diameters.
46
217
9995.8
... More
Laying of 150mm dia DI water supply line in place;Labour charges for Lowering and Keeping in position of CI/DI 150mm sluice reflux valves and scour valves etc. compledte as directed by the deptl. Officers
1
432
432.7
... More
Laying of 150mm dia DI water supply line in place;Lowering of 150mmd ia DI pipes with S/s ends carefully into readymade trenches and laying them true to alignment & gradient including all incidental & operational charges, as directed by departmental officers.
220
105
23166
... More
Laying of 150mm dia DI water supply line in place;Barricading, hoarding, lighting and watching etc.for water supply and sewerage works trenches including cost of material labour etc. complete as directed by the deptl. Officers.
440
234
103268
... More
Laying of 150mm dia DI water supply line in place;Earth workexcavation in Loamy and clayey soils red earth and ordinary gravel hard gravelly slils soft disintegrated rock etc. as directed by the deptl. officers including leads and lifts, all incidental and operationals charges etc. and depositing the same on bank with an initial lead of 10 Mtrs and excluding dewatering. (upto 3.0mtr depth below ground level).Where depth is less than 11/2 times with with Manual Means For Manholes
1.3
324
421.33
... More
Laying of 150mm dia DI water supply line in place;Earthwork excavation and depositing on the bank in all types of solils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, soft disintegrated rock, hard disintegrated rock, conglomerated rock, sotney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officerrs, including protecting the walls and other structures, existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic, removal of stumps and other deleteriouis material and disposal upto a lead of 50m, dressing of sides and bottom and excluding backfilling for pipeline trenches for laying water supply/sewer lines including all incidental and operaional charges etc. complete. Manual Means
123.75
497
61602.75
... More
Laying of 150mm dia DI water supply line in place;Cutting open CC Road surface including labour charges all leads and other incidental and operational charges tool and plants etc. complete for pipe line trenches.
24.75
2939
72760.05