Hyderabad Metropolitan Water Supply And Sewerage Board Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender
Civil And Construction
Opening Date7 Feb 2025
Closing Date13 Feb 2025
Tender Amount₹ 3,90,986
Costs
EMD
₹ 3,910Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
574636Tender No
EP- 168/CGM(E)/O and M Circle-IV/2024-25,Dtd: 06.02.2025.Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Laying of 300mm dia SWG line;Construction of 0.90 M X 0.90 M diameter sewer manhole for additioanl depth of 0.10 M with cement bricks in CM 1:6 Prop. With CC bed 1:6 Prop with CC Bed 1:4:8 Prop. Benching with CC 1:2:4 Prop. Internal plastering 20mm thick in CM 1:3 Prop. And external plastering 12mm thick in CM 1:6 Prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and Frames as directed by the departmental officers.
30
1126
33780
... More
Laying of 300mm dia SWG line;Construction of 0.90 M X 0.90 M diameter sewer manhole upto 1.00 M depth with cement bricks in CM 1:6 Prop. With CC bed 1:6 Prop with CC Bed 1:4:8 Prop. Benching with CC 1:2:4 Prop. Internal plastering 20mm thick in CM 1:3 Prop. And external plastering 12mm thick in CM 1:6 Prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and Frames as directed by the departmental officers.
8
14944
119552
... More
Laying of 300mm dia SWG line;Lowering and Laying in Ready made trenches true to alingment and gradient jointing and testing of stoneware pipes excluding cost of Jointing material such as cement mortar and hemp yarn as directed by the department officers.
93
521
48490.2
... More
Laying of 300mm dia SWG line;Barricading hoarding lighting and watching etc. for water supply and sewerge works for trenches including cost of material labour etc complete as directed by the departmental officers..
93
234
21827.1
... More
Laying of 300mm dia SWG line;Earth work excavation in Loamy and clayey soils, red earth and ordinary gravel and hard gravelly soils soft disintegrated rock as directed by the dept officers, including leads and lifts all incidental and operational charges etc depositing the same on bank with an initial lead of 10 Mtrs and excluding dewatering etc., complete as directed by the deptl. officers.(for Manole trenches)
35.64
324
11550.92
... More
Laying of 300mm dia SWG line;Earth work excavation in Loamy and clayey soils, red earth and ordinary gravel and hard gravelly soils soft disintegrated rock as directed by the dept officers, including leads and lifts all incidental and operational charges etc depositing the same on bank with an initial lead of 10 Mtrs and excluding dewatering etc., complete as directed by the deptl. officers.(for pipe line trenches)
116.48
497
57983.74
... More
Laying of 300mm dia SWG line;Cutting of CC road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete as directed by the dept o0fficers.( for pipeline trenches, Manholes)
17.84
2939
52446.03
... More
Laying of 300mm dia SWG line;Conveyance of SWG from departmental stores of HMWSSB to site of work including loading and stacking etc., all labour incidental and operational charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers.(300mm dia pipe).
93
20
1878.6
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements