Hyderabad Metropolitan Water Supply And Sewerage Board Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender

Works
Civil And Construction
Drainage Work
Opening Date17 Feb 2025
Closing Date20 Feb 2025
Tender Amount₹ 9,60,567 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Sewerage work;Supply and delivery of RCC precast manhole chambers having the size of 36" at bottom tapering to 21" dia at top fixing in CC 1:4:8 prop; along with FRC cover and frame laying CC 1:2:4 prop; including cost of materials, labour charges earth work curing co

23.87

644

15386.6

... More
Sewerage work;Construction of 0.9M X 0.9M dia meter sewer manhole up to 0.1m depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..

50

1123

56150

... More
Sewerage work;Construction of 1.2M X1.2M dia meter sewer manhole up to 1m depth with cement bricks in CM 1:8prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..

2

37442

74884

... More
Sewerage work;Construction of 0.9M X 0.9M dia meter sewer manhole up to 1m depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..

10

14890

148900

... More
Sewerage work;Supply and delivery of RCC precast manhole chambers having the size of 36" at bottom tapering to 21" dia at top fixing in CC 1:4:8 prop; along with FRC cover and frame laying CC 1:2:4 prop; including cost of materials, labour charges earth work curing conveyance etc complete as directed by the H.M.W.S.&,S. Board Engineers

12

6741

80896.8

... More
Sewerage work;Lowering, laying the 200mm dia SWG pipes carefully into the ready made trenches true to alignment and gradient jointing with cement (1:1) prop: excluding cost of SWG pipes but including curing, testing and jointing of materials such as hump yarn and cement mortor with all other operational and incidental charges etc., complete as directed by the H.MW.S.&.S. Board Engineers.

182

374

68177.2

... More
Sewerage work;Barricading, Boarding lighting and watching etc., for water supply and sewerage works trenches of depth upto 6'0"(2 meters) below G.L. using casurina ballies 125mm dia 2.5 meters long placed at 5ft c/c complete including all incidental and operation charges as directed by dept Officers. (150mm dia)

240.2

234

56374.94

... More
Sewerage work;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers.. (For construction of manhole).

20.74

324

6721.83

... More
Sewerage work;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers.. (For Junction portion and pipeline trenches).

270.18

497

134495.6

... More
Sewerage work;Cutting of open CC road surface including labour charges, all leads and other incidental and operational charges tool and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.

46.41

2939

136436.12

... More
Sewerage work;Conveyance of SWG pipes from departmental stores to work site, including loading, unloading, labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (HD-20 )

12

19

235.2

... More
Sewerage work;Conveyance of SWG pipes from departmental stores to work site, including loading, unloading, labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers. (200mm dia )

182

32

5951.4



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.