Hyderabad Metropolitan Water Supply And Sewerage Board Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender

Electrical and Electronics
Electrical Works
Opening Date24 Sep 2022
Closing Date3 Oct 2022
Tender Amount₹ 60,92,440 
Notes
Download

Costs

Summary

Annual Maintenance Of Works (electrical) Maintenance Of Electrical And Mechanica

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Annual maintenance of works (Electrical);Supply ,Delivery and fixing of suitable motor bearing as per sample in place of damaged for Bearings - 2 Nos (Drive end and Non-drive end) to 100 HP motor at Pump house with necessary bearing puller, labour charges,including removing the motor bearings cover and removing the damaged motor bearings & refixing the new bearings and pump and motor coupled with pulley coupling, aligning the motor with all new bolts and nuts etc, complete as directed by the dept. officers.after deducting the cost of old materials including materials and labour charges, transport charges etc as per departmental officers directions.

2

-

70000

... More
Annual maintenance of works (Electrical);Supply ,Delivery and fixing of suitable pump bearing as per sample in place of damaged for Ball Bearing - 2 Nos (Drive end and Non-drive end) to 100 HP pump set at Pump house with necessary bearing puller, labour charges,including removing the pumpcover rotating element and removing the damaged bearings & refixing the pumpset complete as directed by the dept. officers.after deducting the cost of old materials

2

-

40000

... More
Annual maintenance of works (Electrical);Supply and fixing of pulley bolts and rubber bushes to suit 100 HP pumpset pulley coupling as per the existing make and size including materials and labour charges, transport charges etc as per departmental officers directions.

120

-

30000

... More
Annual maintenance of works (Electrical);Dismantling the burnout 75HP squirrel cage induction motor from the pump after de-coupling pulley, bolts and cable connections transporting to the workshop from pump house Removing the bearing side cover of the 75HP squirrel cage induction motor dismantling the rotor from stator removing the burnout enamel copper wire from stator, prepare the winding coils with new copper wire of suitable gauge, cleaning the stator slots, painting with doctor beck moisture varnish and insulate the slots with F class insulation paper, rewinding with prepared coils, providing sleeves to each coil scraping the leads giving connection to each coil taping the coils with cotton tape tightly, closing the slots with wooden pieces, heating the winding, baking and varnishing with Dr. Beck Varnish for further resistance keeping it in oven and cooling down to the room temperature closing the bearing cover fixing the fan and end covers taking out leads including giving terminal block connections and tested to insulation values upto 200 Megomhs, Re-erection of 75HP motor of pump room on base plate coupling with the pump giving electrical connection testing,trail run and load run including materials and labour charges, transport charges etc as per departmental officers directions.

3

-

240000

... More
Annual maintenance of works (Electrical);Dismantling the 75HP Centrifugal pump set after removing bolts and nuts with lifting the top cover also lifting the rotating element with help of chain pulley coupling and refixing the top cover, sending to workshop from pump house for repair,supply ,Delivery and fixing of suitable bearing as per sample in place of damaged for Ball Bearing - 2 Nos (Drive end and Non-drive end), with necessary bearing puller, Supply, delivery fixing an moulding of neck rings , shaft sleeves (Bushes) ,check nuts in C.I metal with as per sample existing size, moulding the material cost of materials and labour charges, milling charges etc and fixing of all oil seals as per the existing size in place of damaged oil seals and Making of Welding , moulding and Balancing of wornout C.I. Impeller in place of pot holes and rusted area , including materials,moulding ,turning finishing charges, complete without any damage of existing C.I. Impeller,Reassembling the existing 75HP Centrifugal pump set using new bushes,neck rings bearings with cutting new champion paper as packing paper as per sample aligning the set of impeller shaft bearing housings etc fixing the top cover with new bolts , nuts rubber bushes etc., including cost of materials, transport to and fro charges and labour charges etc., complete as directed by the dept. officers.after deducting the cost of old materials.

3

-

195000

... More
Annual maintenance of works (Electrical);Supply and delivery of new suitable CI flexible coupling for 75HP Pumpset duly boring, drilling, threading and fixing with necessary fasteners, including dismantling the existing damaged flexible couplings from 75 HP Pump-sets without damaging the pump and motor and Re-fixing the new flexible couplings to Pump-set without damaging the pump and motor including material, machining charges and labour charges etc duly after deducting the old material cost, complete as directed by the departmental officers.

3

-

57000

... More
Annual maintenance of works (Electrical);Supply ,Delivery and fixing of suitable motor bearing as per sample in place of damaged for Bearings - 2 Nos (Drive end and Non-drive end) to 75/90HP HP motor at Pump house with necessary bearing puller, labour charges,including removing the motor bearings cover and removing the damaged motor bearings & refixing the new bearings and pump and motor coupled with pulley coupling, aligning the motor with all new bolts and nuts etc, complete as directed by the dept. officers.after deducting the cost of old materials including materials and labour charges, transport charges etc as per departmental officers directions.

3

-

90000

... More
Annual maintenance of works (Electrical);Supply ,Delivery and fixing of suitable pump bearing as per sample in place of damaged for Ball Bearing - 2 Nos (Drive end and Non-drive end) to 75 HP pump set at Pump house with necessary bearing puller, labour charges,including removing the pumpcover rotating element and removing the damaged bearings & refixing the pumpset complete as directed by the dept. officers.after deducting the cost of old materials

3

-

60000

... More
Annual maintenance of works (Electrical);Supply and fixing of pulley bolts and rubber bushes to suit 75 HP pumpset pulley coupling as per the existing make and size including materials and labour charges, transport charges etc as per departmental officers directions.

148

-

35520

... More
Annual maintenance of works (Electrical);Dismantling the burnout 25 HP/ 15HP squirrel cage induction motor from the pump after de-coupling pulley, bolts and cable connections transporting to the workshop from pump house Removing the bearing side cover of the 25/15 HP squirrel cage induction motor dismantling the rotor from stator removing the burnout enamel copper wire from stator, prepare the winding coils with new copper wire of suitable gauge, cleaning the stator slots, painting with doctor beck moisture varnish and insulate the slots with F class insulation paper, rewinding with prepared coils, providing sleeves to each coil scraping the leads giving connection to each coil taping the coils with cotton tape tightly, closing the slots with wooden pieces, heating the winding, baking and varnishing with Dr. Beck Varnish for further resistance keeping it in oven and cooling down to the room temperature closing the bearing cover fixing the fan and end covers taking out leads including giving terminal block connections and tested to insulation values upto 200 Megomhs, Re-erection of 25/15 HP motor of pump room on base plate coupling with the pump giving electrical connection testing,trail run and load run including materials and labour charges, transport charges etc as per departmental officers directions.

2

-

80000

... More
Annual maintenance of works (Electrical);Dismantling the 25/15HP Centrifugal pump set after removing bolts and nuts with lifting the top cover also lifting the rotating element with help of chain pulley coupling and refixing the top cover, sending to workshop from pump house for repair,supply ,Delivery and fixing of suitable bearing as per sample in place of damaged for Ball Bearing - 2 Nos (Drive end and Non-drive end), with necessary bearing puller, Supply, delivery fixing an moulding of neck rings , shaft sleeves (Bushes) ,check nuts in C.I metal with as per sample existing size, moulding the material cost of materials and labour charges, milling charges etc and fixing of all oil seals as per the existing size in place of damaged oil seals and Making of Welding , moulding and Balancing of wornout C.I. Impeller in place of pot holes and rusted area , including materials,moulding ,turning finishing charges, complete without any damage of existing C.I. Impeller,Reassembling the existing 25/15HP Centrifugal pump set using new bushes,neck rings bearings with cutting new champion paper as packing paper as per sample aligning the set of impeller shaft bearing housings etc fixing the top cover with new bolts , nuts rubber bushes etc., including cost of materials, transport to and fro charges and labour charges etc., complete as directed by the dept. officers.after deducting the cost of old materials.

2

-

70000

... More
Annual maintenance of works (Electrical);Supply and delivery of new suitable CI flexible coupling/Tyre coupling for 25/15HP Pumpset duly boring, drilling, threading and fixing with necessary fasteners, including dismantling the existing damaged flexible couplings from 25/15 HP Pump-sets without damaging the pump and motor and Re-fixing the new flexible couplings to Pump-set without damaging the pump and motor including material, machining charges and labour charges etc duly after deducting the old material cost, complete as directed by the departmental officers.

6

-

51000

... More
Annual maintenance of works (Electrical);Supply ,Delivery and fixing of suitable motor bearing as per sample in place of damaged for Bearings - 2 Nos (Drive end and Non-drive end) to 25/15 HP motor at Pump house with necessary bearing puller, labour charges,including removing the motor bearings cover and removing the damaged motor bearings & refixing the new bearings and pump and motor coupled with pulley coupling, aligning the motor with all new bolts and nuts etc, complete as directed by the dept. officers.after deducting the cost of old materials including materials and labour charges, transport charges etc as per departmental officers directions.

6

-

99000

... More
Annual maintenance of works (Electrical);Supply ,Delivery and fixing of suitable pump bearing as per sample in place of damaged for Ball Bearing - 2 Nos (Drive end and Non-drive end) to 25/15 HP pump set at Pump house with necessary bearing puller, labour charges,including removing the pumpcover rotating element and removing the damaged bearings & refixing the pumpset complete as directed by the dept. officers.after deducting the cost of old materials

6

-

96000

... More
Annual maintenance of works (Electrical);Supply and fixing of pulley bolts and rubber bushes to suit 25/15 HP pumpset pulley coupling as per the existing make and size including materials and labour charges, transport charges etc as per departmental officers directions.

60

-

14400

... More
Annual maintenance of works (Electrical);Carryout routine maintenance, servicing, and testing of 800A L.T.ACB by cleaning fixed contacts, moving contacts and arc chutes including servicing and putting the ACB in perfect working condition after getting all relay and ON, OFF mechanism etc done with only manufacturing companies including materials and labour charges, transport charges etc as per departmental officers directions.

4

-

100000

... More
Annual maintenance of works (Electrical);Routine maintenance of transformers in operation covering insulation resistance oil, break down strength. Reconditioning / replacement of silica gel, cleaning of transformer and topping up to oil level if required including materials and labour charges, transport charges etc as per departmental officers directions.

4

-

80000

... More
Annual maintenance of works (Electrical);Replacing HT Bushes, HT metal parts, LT Bushing, LT Metal parts upto 1000KVA transformer including materials and labour charges, transport charges etc as per departmental officers directions.

3

-

45000

... More
Annual maintenance of works (Electrical);Supply,delivery and fixing of 400A AB Switch-1No,HG Fuse sets-1No, LAS-1set,Required Number of 11KV pin and disc insulators, Required length of 100X50mm and 75X40 mm ISMC channel iron including two coats of redoxide and two coats of enamel paint etc for finished item of work 11KV pin insulators and disc insulators. AB switch operating pipe with handle and lock and key arrangements. "0" SWG or 8.25 mm dia hard drawn bare copper wire including copper binding wire etc ,complete as required including connections.new bolts and nuts etc, complete as directed by the dept. officers.after deducting the cost of old materials including materials and labour charges, transport charges etc as per departmental officers directions.

2

-

80000

... More
Annual maintenance of works (Electrical);Filteration of 750KVA Step down transformer oil to 11 KV /3.3 KV step down transformer at Transformer yard including top of with new oil including materials and labour charges, transport charges etc as per departmental officers directions.

2

-

100000

... More
Annual maintenance of works (Electrical);Filteration of 315 KVA Step down transformer oil to 11 KV /3.3 KV step down transformer at Transformer yard including top of with new oil including materials and labour charges, transport charges etc as per departmental officers directions.

2

-

60000

... More
Annual maintenance of works (Electrical);Cleaning of Transformer yard / Vegetation removal at 11 KV /3.3 KV step down transformer at Transformer yard including materials and labour charges, transport charges etc as per departmental officers directions.

2

-

24000

... More
Annual maintenance of works (Electrical);Display of Danger Boards at 11 KV /3.3 KV step down transformer at Transformer yard including materials and labour charges, transport charges etc as per departmental officers directions.

20

-

10000

... More
Annual maintenance of works (Electrical);Supply, delivery and fixing of joint kits to 11 KV /3.3 KV step down transformer at Transformer yard including materials and labour charges, transport charges etc as per departmental officers directions.

4

-

40000

... More
Annual maintenance of works (Electrical);Supply, delivery and fixing of end kits to 11 KV /3.3 KV step down transformer at Transformer yard including materials and labour charges, transport charges etc as per departmental officers directions.

2

-

30000

... More
Annual maintenance of works (Electrical);Replacement of damaged insulators and shakils to 11 KV /3.3 KV step down transformer at Transformer yard including materials and labour charges, transport charges etc as per departmental officers directions.

20

-

7000

... More
Annual maintenance of works (Electrical);Reparing and re placement of AB Switches of 400Amps with new one and Greasing of AB Switches to operate fuses by 6 pole structure at Transformer yard transformer yard including materials and labour charges, transport charges etc as per departmental officers directions.

2

-

30000

... More
Annual maintenance of works (Electrical);Descrewing the all bolts and nuts and Removing the top cover from MS box dismanteling the burnout 15 HP open well submersible booster pumpset from suction and delivery pipers, lifting the pumpset from MS box, and 3 core flat cables without damaging any accessories and sending pumpset to workshop, Dismantling the rotor from the stator removing the burnout PVC copper wire from the stator cleaning the stator slots providing insulation PVC paper, rewinding with new PVC copper wire suitable gauge changing motor bushes, giving connections taping and assembling the open well booster pumpset, Repairs to pump such as replacing the wornout bushes, shaft, sleeves including turning, polishing etc., changing the thrust bearing of pumpset Refixing the rewinded 15HP openwell submersible booster pumpset along with delivery and suction pipelines and without damaging any accessories and connecting the cables, tightening the bolts and nuts of pump fixing the top cover with bolts andnuts laying of packing sheet for leakage of water including testing and trial run on full load as directed by the Dept.officers, including materials of PVC copper wire insulating material pump bushes new nuts and bolts, labour charges, etc complete after deducting the old material as per the instructions of dept officers.

2

-

70000

... More
Annual maintenance of works (Electrical);Descrewing the all bolts and nuts and Removing the top cover from MS box dismanteling the burnout 10 HP open well submersible booster pumpset from suction and delivery pipers, lifting the pumpset from MS box, and 3 core flat cables without damaging any accessories and sending pumpset to workshop, Dismantling the rotor from the stator removing the burnout PVC copper wire from the stator cleaning the stator slots providing insulation PVC paper, rewinding with new PVC copper wire suitable gauge changing motor bushes, giving connections taping and assembling the open well booster pumpset, Repairs to pump such as replacing the wornout bushes, shaft, sleeves including turning, polishing etc., changing the thrust bearing of pumpset Refixing the rewinded 10HP openwell submersible booster pumpset along with delivery and suction pipelines and without damaging any accessories and connecting the cables, tightening the bolts and nuts of pump fixing the top cover with bolts andnuts laying of packing sheet for leakage of water including testing and trial run on full load as directed by the Dept.officers, including materials of PVC copper wire insulating material pump bushes new nuts and bolts, labour charges, etc complete after deducting the old material as per the instructions of dept officers.

2

-

50000

... More
Annual maintenance of works (Electrical);Descrewing the all bolts and nuts and Removing the top cover from MS box dismanteling the burnout 7.5 HP open well submersible booster pumpset from suction and delivery pipers, lifting the pumpset from MS box, and 3 core flat cables without damaging any accessories and sending pumpset to workshop, Dismantling the rotor from the stator removing the burnout PVC copper wire from the stator cleaning the stator slots providing insulation PVC paper, rewinding with new PVC copper wire suitable gauge changing motor bushes, giving connections taping and assembling the open well booster pumpset, Repairs to pump such as replacing the wornout bushes, shaft, sleeves including turning, polishing etc., changing the thrust bearing of pumpset Refixing the rewinded 7.5HP openwell submersible booster pumpset along with delivery and suction pipelines and without damaging any accessories and connecting the cables, tightening the bolts and nuts of pump fixing the top cover with bolts andnuts laying of packing sheet for leakage of water including testing and trial run on full load as directed by the Dept.officers, including materials of PVC copper wire insulating material pump bushes new nuts and bolts, labour charges, etc complete after deducting the old material as per the instructions of dept officers.

4

-

72000

... More
Annual maintenance of works (Electrical);Supply and laying of 3 Core 4 Sqmm Flat Copper cable as per IS 694:1990 for Submersible Motors.Makes : Finolex / RR Kabel / Havells / L&T including materials and labour charges, transport charges etc as per departmental officers directions.

200

-

38000

... More
Annual maintenance of works (Electrical);Supply and laying of 3 Core 6 Sqmm Flat Copper cable as per IS 694:1990 for Submersible Motors.Makes : Finolex / RR Kabel / Havells / L&T including materials and labour charges, transport charges etc as per departmental officers directions.

200

-

58000

... More
Annual maintenance of works (Electrical);Removing the burnout V6 / 7.5/5HP up 20stage submersible pumpset and 3 core flat cables without damaging any accessories with Chain pulley ,necessary tools along with removing the GI pipes and sending pumpset to workshop, Dismantling the rotor from the burnout PVC copper wire from the stator cleaning the stator slots providing insulation PVC paper, rewinding with new PVC copper wire suitable gauge changing motor bushes, giving connections taping and assembling the pumpset, Repairs to pump such as replacing the wornout impellors bushes, shaft, sleeves including turning, polishing etc., changing the thrust bearing of pumpset Refixing the rewinded V6/ 7.5 HP submersible pumpset along with 3 core cable without damaging any accessories with GI Pipes and cables including testing and trial run on full load as directed by the Dept.officers, including materials of PVC copper wire insulating material pump bushes machining charges, labour charges, chain pulley hire charges etc complete after deducting the old material as per the instructions of dept officers.

15

-

675000

... More
Annual maintenance of works (Electrical);Removing the burnout V4 / 5 HP up to 40stage submersible pumpset and 3 core flat cables without damaging any accessories with Chain pulley ,necessary tools along with removing the HDPE pipes and sending pumpset to workshop, Dismantling the rotor from the burnout PVC copper wire from the stator cleaning the stator slots providing insulation PVC paper, rewinding with new PVC copper wire suitable gauge changing motor bushes, giving connections taping and assembling the pumpset, Repairs to pump such as replacing the wornout impellors bushes, shaft, sleeves including turning, polishing etc., changing the thrust bearing of pumpset Refixing the rewinded V4/ 5 HP submersible pumpset along with 3 core cable without damaging any accessories with HDPE Pipes and cables including testing and trial run on full load as directed by the Dept.officers, including materials of PVC copper wire insulating material pump bushes machining charges, labour charges, chain pulley hire charges etc complete after deducting the old material as per the instructions of dept officers.

30

-

660000

... More
Annual maintenance of works (Electrical);Supply and fixing of powder coated control panel for three phase submersible motors above 5 HP up to 7.5 HP @ 415V 50Hz operating fitted with supply and fixing of Direct - on - Line LTLK /BCH/ SIEMENS / CROMPTON make, 0-500V Volt meter and 0-30A Ammeter, Indication lamps, selector switches, CTS, 32A TP MCB, Single phase preventor,suitable contactor to with stand low voltage pick up and high voltage resistant, with ISI marked capacitors assembled with ISI mark contactors and fitted with Legrand make ISI mark MCB etc., complete including materials and labour charges, transport charges etc as per departmental officers directions.

15

-

210000

... More
Annual maintenance of works (Electrical);Supply and laying of 3 Core 2.5 Sqmm Flat Copper cable as per IS 694:1990 for Submersible Motors.Makes : Finolex / RR Kabel / Havells / L&T including materials and labour charges, transport charges etc as per departmental officers directions.

400

-

36000

... More
Annual maintenance of works (Electrical);Supply,delivery and fixing of MS Clamp heavy duty for protection of pump set ,1 1/4 "GI Nipple,Bends,couplings etc., as per site condition including labour charges and transportation charges ,complete as directed by the departmental Engineers

25

-

12500

... More
Annual maintenance of works (Electrical);Supply , delivery and fixing of 40mm 16 Kg/cm2 HDPE pipe heavy duty for fixing of above motor cost of material,transport,labour charges etc. complete after deduction of old G.I. Pipe ,damaged HDPE pipe including materials and labour charges, transport charges etc as per departmental officers directions.

2000

-

380000

... More
Annual maintenance of works (Electrical);Supply delivery and laying of 720 service wire WPTC for inline booster/Tanker filling station/borewells as per the instructions of departmental officials to bring into the working condition including materials and labour charges, transport charges etc as per departmental officers directions.

500

-

30000

... More
Annual maintenance of works (Electrical);Removing the burnout 7.5 HP open well submersible pumpset of tanker filling and 3 core flat cables without damaging any accessories and sending pumpset to workshop, Dismantling the rotor from the stator removing the burnout PVC copper wire from the stator cleaning the stator slots providing insulation PVC paper, rewinding with new PVC copper wire suitable gauge changing motor bushes, giving connections taping and assembling the open well pumpset, Repairs to pump such as replacing the wornout bushes, shaft, sleeves including turning, polishing etc., changing the thrust bearing of pumpset Refixing the rewinded 7.5 HP openwell submersible pumpset along with 3 core cable without damaging any accessories and cables including testing and trial run on full load as directed by the Dept.officers, including materials of PVC copper wire insulating material pump bushes new nuts and bolts, labour charges, etc complete after deducting the old material as per the instructions of dept officers.

4

-

72000

... More
Annual maintenance of works (Electrical);Removing the burnout 30 HP open well submersible pumpset and 3 core flat cables without damaging any accessories and sending pumpset to workshop, Dismantling the rotor from the stator removing the burnout PVC copper wire from the stator cleaning the stator slots providing insulation PVC paper, rewinding with new PVC copper wire suitable gauge changing motor bushes, giving connections taping and assembling the open well pumpset, Repairs to pump such as replacing the wornout bushes, shaft, sleeves including turning, polishing etc., changing the thrust bearing of pumpset Refixing the rewinded 30 HP openwell submersible pumpset along with 3 core cable without damaging any accessories and cables including testing and trial run on full load as directed by the Dept.officers, including materials of PVC copper wire insulating material pump bushes new nuts and bolts, labour charges, etc complete after deducting the old material as per the instructions of dept officers.

1

-

85000

... More
Annual maintenance of works (Electrical);supply and fixing of MNX 185 contactor unit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

4

-

156000

... More
Annual maintenance of works (Electrical);supply and fixing of MNX 140 contactor unit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

4

-

120000

... More
Annual maintenance of works (Electrical);supply and fixing of MNX 110 contactor unit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

6

-

168000

... More
Annual maintenance of works (Electrical);supply and fixing of MNX 95 contactor unit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

4

-

64000

... More
Annual maintenance of works (Electrical);supply and fixing of MNX 45 contactor unit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

2

-

24000

... More
Annual maintenance of works (Electrical);supply and fixing of MNX 32 contactor unit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

6

-

39000

... More
Annual maintenance of works (Electrical);supply and fixing of MNX 25 contactor unit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

6

-

30000

... More
Annual maintenance of works (Electrical);supply and fixing of Thermal relay for 150 HP starter Suitable in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

2

-

39000

... More
Annual maintenance of works (Electrical);supply and fixing of Thermal relay for 100 HP starter Suitable in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

2

-

34000

... More
Annual maintenance of works (Electrical);supply and fixing of relay for 75 HP starter Suitable in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

2

-

12000

... More
Annual maintenance of works (Electrical);supply and fixing of relay for 25HP/ 15 HP starter Suitable in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

2

-

8000

... More
Annual maintenance of works (Electrical);supply and fixing of Timer for 150 HP starter Suitableunit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

2

-

16000

... More
Annual maintenance of works (Electrical);supply and fixing of Timer for 100 HP starter in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

2

-

14000

... More
Annual maintenance of works (Electrical);supply and fixing of Timer for 75 HP starter unit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

2

-

14000

... More
Annual maintenance of works (Electrical);supply and fixing of Timer 25HP/15HP unit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

2

-

7000

... More
Annual maintenance of works (Electrical);supply and fixing of Single Phase Preventers minilek make unit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

8

-

24000

... More
Annual maintenance of works (Electrical);supply and fixing of 5HP DOL Starters unit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

6

-

24000

... More
Annual maintenance of works (Electrical);supply and fixing of 7.5HP Starters unit in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

6

-

30000

... More
Annual maintenance of works (Electrical);supply and fixing of MNX 185 contactor Spare kits in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

4

-

58000

... More
Annual maintenance of works (Electrical);supply and fixing of MNX 140 contactor Spare kits in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

4

-

40000

... More
Annual maintenance of works (Electrical);supply and fixing of MNX 110 contactor Spare kits in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

4

-

36000

... More
Annual maintenance of works (Electrical);supply and fixing of MNX 95 contactor Spare kits in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

4

-

32000

... More
Annual maintenance of works (Electrical);supply and fixing of MNX 32 contactor Spare kits in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

4

-

24000

... More
Annual maintenance of works (Electrical);supply and fixing of MNX 25 contactor Spare kits in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

4

-

20000

... More
Annual maintenance of works (Electrical);supply and fixing of 63Amps 3 Pole MCB in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

12

-

42000

... More
Annual maintenance of works (Electrical);supply and fixing of 32Amps 3 pole MCB in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

12

-

30000

... More
Annual maintenance of works (Electrical);supply and fixing of 16Amps single pole MCB in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

12

-

18000

... More
Annual maintenance of works (Electrical);supply and fixing of 100/63Amps Cut outs in place of damaged including removing the burntout fixing new above including materials and labour charges, transport charges etc as per departmental officers directions.

48

-

18720

... More
Annual maintenance of works (Electrical);Supply and delivery of tools and 8mm to 18mm gland rope for preventive maintanance including materials and labour charges, transport charges etc as per departmental officers directions.

60

-

48000

... More
Annual maintenance of works (Electrical);Supply and fixing of 400,300,240,185,150,120,95.70,50,25,16 Sqmm aluminium lugs (each 30 Nos) to the all pump rooms and substations as per the instructions of departemental officials to bring into the working condition

1

-

60000

... More
Annual maintenance of works (Electrical);Supply and fixing of 400,300,240,185,150,120,95.70,50,25,16 Sqmm Copper lugs (each 20 Nos) to the all pump rooms and substations as per the instructions of departemental officials to bring into the working condition

1

-

50000

... More
Annual maintenance of works (Electrical);Repairs,Reconditioning existing street lights including cable, MCB, Pipe and other accessories to bring into the blown on of existing street light in entire jurisdiction as per the instructions of departemental officials to bring into the working condition

30

-

54000

... More
Annual maintenance of works (Electrical);Supply and delivery , fixing of 72w street lights maintanance at Electrical section including materials and labour charges, transport charges etc as per departmental officers directions.

15

-

67500

... More
Annual maintenance of works (Electrical);Supply,delivery of star pully sets for vaccum pump sets including materials and labour charges, transport charges etc as per departmental officers directions.

12

-

7200

... More
Annual maintenance of works (Electrical);Supply,delivery of star rubers for vaccum pump sets including materials and labour charges, transport charges etc as per departmental officers directions.

24

-

3600

... More
Annual maintenance of works (Electrical);Supply,delivery of 10Amps to 100Amps Fuse wires for utilisation at substation including materials and labour charges, transport charges etc as per departmental officers directions.

5

-

5000

... More
Annual maintenance of works (Electrical);Supply,delivery of insulation tapes all colors including materials and labour charges, transport charges etc as per departmental officers directions.

300

-

3000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.