Hyderabad Metropolitan Water Supply And Sewerage Board Tender
... More
The HMWSSB has issued a formal invitation for competitive bids for the Hyderabad Metropolitan Water Supply And Sewerage Board project, for Construction Of Rcc Retaining Wall Of 4mts Height As Protection To Heavy Floods All Along The Canal Duly Arranging Sand Bags For Diverting Of Stream And Dewatering At 735mld Wtp Premises At Mallaram, Mallaram Section, Sd-i, Control Room, Transmission Division Iv, Control Room. in Medchal Malkajgiri, Telangana, with an estimated contract value of Rs. 1,84,34,534. The bid opening date for this tender is 03-01-2025 and the last date for bid submission is 10-01-2025. Interested bidders for Hyderabad Metropolitan Water Supply And Sewerage Board tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender
Civil And Construction
Drainage Work
Opening Date3 Jan 2025
Closing Date10 Jan 2025
Tender Amount₹ 1,84,34,534
Costs
EMD
₹ 1,84,345Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
565522Tender No
EP.No.78/CGM(E)/TC/T3/TD-IV/2024-25/02.01.2025Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of RCC Retaining wall of 4mts Height as protection to heavy floods all along the canal;Providing and laying uncoursed rubble stone masonry in CM 1:5 proportion for canal bed lining using stones from approved quarry including cost of allmaterials, machinery, labour, forming weep holes at specified intervals, finishing, curing etc., complete with initial lead upto 50m and all lifts.(without pinheaders) : 1.1 cum). IRR-CAW-7-48
410.4
4748
1948702.32
... More
Construction of RCC Retaining wall of 4mts Height as protection to heavy floods all along the canal;Bailing of water from pipe line trenches with oil engine driven pumpsets, including hire charges, fuelcharges and crew charges etc complete.
32
417
13344.64
... More
Construction of RCC Retaining wall of 4mts Height as protection to heavy floods all along the canal;Laying of Sand Bags in the stipulated places including cost of empty cement bag, sand, thread, stitching charges and labour charges etc., with 13.615%overhead charges and contractors profit. For pipeline (Rate as per SSR Page No 4 SSR24-25) Filled sand bag volume =0.02 cubic meters
8055
40
322200
... More
Construction of RCC Retaining wall of 4mts Height as protection to heavy floods all along the canal;PCC , (1:4;8) using 40mm guage graded metal hard granite machine crushed metal including cos and conveyance of all materials coarse and fine agregate(As per GO Ms No 37 Industries and Commerce Dept dated 29.05.2018, the Government have directed all Engineering works Departments to use Manufactured sand(Rock Sand) and natural river sand in he ratio of 50:50 in all mixes of cement concrete and in the items of work) to site, centering, mixing lifts , leads laying in position, compacting, curing, all labour charges etc, complete.
205.2
5202
1067501.7
... More
Construction of RCC Retaining wall of 4mts Height as protection to heavy floods all along the canal;Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down sizeapproved, clean, hard, graded aggregates for slabs for small culverts span upto 2 mts including cost of all materials,machinery, labour, rmwork, scaffolding,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. Note: If water is tobe brought from other place add only lead charges @ 500 ltr / cum. (Cement content: 330 kg / cum, CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45cum). For Toe and Heel Slabs.IRR-CCDW-2-26
396.81
8042
3191146.02
... More
Construction of RCC Retaining wall of 4mts Height as protection to heavy floods all along the canal;Collection supply and filling with HBG stone chips 2.36mm and below in trenchof foundation and basement and the pipeline trenches with initial lead inlayors not exceeding 15cm thick consolidating each deposited layer by watering consolidating each layer by watering ramming including cost of collectionof sand etc
205.2
644
132271.92
... More
Construction of RCC Retaining wall of 4mts Height as protection to heavy floods all along the canal;Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial lead upto 50 and all lifts. IRR-CCDW-2-1
53.17
85697
4556537.14