Hyderabad Metropolitan Water Supply And Sewerage Board Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender
Civil And Construction
Pipe Line Project
Opening Date22 Apr 2025
Closing Date29 Apr 2025
Tender Amount₹ 1,56,804
Costs
EMD
₹ 1,568Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
589426Tender No
EP-28/CGM(E)/RC/2025-26, Dt:22.04.2025Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Laying of 150mm dia MS pipe and making junction;Hire charges for Engaging Shovel of 110 HP including cost and conveyance of fuel, lubricant and other incidental charges etc.,complete as directed by the HMWS&SB Engineers.
8
3557
28461.6
... More
Laying of 150mm dia MS pipe and making junction;Job work for Oxygen Gas linking and jointing and laying the to alignment and gradient including cost and conveyance of expenses and labour charges incl all incidental and operational charges etc., complete with specialized tools and plants incl with consumables oxygen gas cylinder gas and welding rods and hire charges of gas equipment welding machine incl wages of fitter welder and helper and all tools and equipments and other incidental charge and operational charges complete with in the stipulated time etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
14.5
61
884.5
... More
Laying of 150mm dia MS pipe and making junction;Item Detailed Specification Description
-
-
-
... More
Laying of 150mm dia MS pipe and making junction;Hire charges for engaging Generator 50 KVA including cost of Fuel wages for driver helper including transportation from Yard to work site and back etc., complete as directed by the HMWS&SB Engineers.
8
1883
15068.8
... More
Laying of 150mm dia MS pipe and making junction;Job work for Hire Charges for Gas cutting set linking and jointing and laying the to alignment and gradient including cost and conveyance of expenses and labour charges incl all incidental and operational charges etc., complete with specialized tools and plants incl with consumables oxygen gas cylinder gas and welding rods and hire charges of gas equipment welding machine incl wages of fitter welder and helper and all tools and equipments and other incidental charge and operational charges complete with in the stipulated time etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
1
685
685
... More
Laying of 150mm dia MS pipe and making junction;Supply delivery and fixing of RCC precast manhole chamber having the size of 36" at bottom tappering to 8 21 ^ prime prime dia at top fixing in CC 1:4:8 Prop along with FRC cove HD-20 and frame laying CC Design mix M-30 prop: etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
1
6752
6752.4
... More
Laying of 150mm dia MS pipe and making junction;Welding electrodes 4mm dia linking and jointing and laying the to alignment and gradient including cost and conveyance of expenses and labour charges incl all incidental and operational charges etc., complete with specialized tools and plants incl with consumables oxygen gas cylinder gas and welding rods and hire charges of gas equipment welding machine incl wages of fitter welder and helper and all tools and equipments and other incidental charge and operational charges complete with in the stipulated time etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
120
14
1680
... More
Laying of 150mm dia MS pipe and making junction;Cost of 150mm dia M.S Flanges including cost of bolts, nuts, rubber packing etc., complete and flange thickness conforming to 15:7322-1985 and flange dimensions conforming to IS:1538-1993 excluding cost of MS specials including cost and conveyance to site etc., as directed by the HMWS&SB Engineers.
2
1954
3908
... More
Laying of 150mm dia MS pipe and making junction;Job work for LPG Gas linking and jointing and laying the to alignment and gradient including cost and conveyance of expenses and labour charges incl all incidental and operational charges etc., complete with specialized tools and plants incl with consumables oxygen gas cylinder gas and welding rods and hire charges of gas equipment welding machine incl wages of fitter welder and helper and all tools and equipments and other incidental charge and operational charges complete with in the stipulated time etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
1
1491
1491.5
... More
Laying of 150mm dia MS pipe and making junction;Job work for Fitter linking and jointing and laying the to alignment and gradient including cost and conveyance of expenses and labour charges incl all incidental and operational charges etc., complete with specialized tools and plants incl with consumables oxygen gas cylinder gas and welding rods and hire charges of gas equipment welding machine incl wages of fitter welder and helper and all tools and equipments and other incidental charge and operational charges complete with in the stipulated time etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
2
735
1470
... More
Laying of 150mm dia MS pipe and making junction;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
2.7
2732
7376.4
... More
Laying of 150mm dia MS pipe and making junction;Manufacture supply and delinery of 150 mm dia MS pipe fabricated with 8mm thick MS plate for including cost of with black epoxy paint of two coats and single coat of primer As directed by the departmental officers. Including cost of mild steel plates, transportation, laying and jointing etc., complete and inclusive of all taxes etc. complete as directed by the HMWS&SB Engineers.
14
2809
39326
... More
Laying of 150mm dia MS pipe and making junction;Job work for Hire Charges for Welding set linking and jointing and laying the to alignment and gradient including cost and conveyance of expenses and labour charges incl all incidental and operational charges etc., complete with specialized tools and plants incl with consumables oxygen gas cylinder gas and welding rods and hire charges of gas equipment welding machine incl wages of fitter welder and helper and all tools and equipments and other incidental charge and operational charges complete with in the stipulated time etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
16
145
2326.4
... More
Laying of 150mm dia MS pipe and making junction;RCC M20 Nominal mix (Cement:fine aggregate: Coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc..complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering etc., complete as directed by the HMWS&SB Engineers.
2.7
9070
24489.24
... More
Laying of 150mm dia MS pipe and making junction;Hire charges for engaging Air Compressor 8.5 cmm (diesel) at site including cost of Fuel wages for driver helper etc and all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers.
8
2090
16724
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements