Hyderabad Metropolitan Development Authority Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Development Authority - HMDA Tender

Works
Civil And Construction
Energy, Oil and Gas
Building Construction
Electrical and Electronics
Solar Installation and Products
Electrical Works
Opening Date22 Feb 2025
Closing Soon7 Mar 2025
Tender Amount₹ 5,87,35,653 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item;Installation of HT Lightening Arresters with earth connection including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Cost of Material for Shifting of TRANSFORMER along with electrical cables , panel board

1

1859

1859

... More
Item;L.T. Metering arrangement with CTs including cable connections and cleat arrangement including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Labour & Transport charges for Shifting of TRANSFORMER along with electrical cables , panel board

1

1008

1008

... More
Item;L.T. Metering arrangement with CTs including cable connections and cleat arrangement including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Cost of Material for Shifting of TRANSFORMER along with electrical cables , panel board

1

21487

21487

... More
Item;Installation of L.T.H.G. Fuse sets including connections including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Labour & Transport charges for Shifting of TRANSFORMER along with electrical cables , panel board

1

383

383

... More
Item;Installation of L.T.H.G. Fuse sets including connections including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Cost of Material for Shifting of TRANSFORMER along with electrical cables , panel board

1

1241

1241

... More
Item;Erection of 11 K.V. H.G. Fuse set including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Labour & Transport charges for Shifting of TRANSFORMER along with electrical cables , panel board

1

903

903

... More
Item;Erection of 11 K.V. H.G. Fuse set including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Cost of Material for Shifting of TRANSFORMER along with electrical cables , panel board

1

2329

2329

... More
Item;Construction of RCC Column type DTR Plinth of size 1'X1'X10',topslab 4'x4'x6" & beam size size 1'X1'X10',topslab 4'x4'x6" & beam size 4'X8'X8" including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Labour & Transport charges for Shifting of TRANSFORMER along with electrical cables , panel board

1

25968

25968

... More
Item;Erection of 11 KV AB Switch (200A) including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Labour & Transport charges for Shifting of TRANSFORMER along with electrical cables , panel board

1

2264

2264

... More
Item;Erection of 11 KV AB Switch (200A) including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Cost of Material for Shifting of TRANSFORMER along with electrical cables , panel board

1

10609

10609

... More
Item;11 KV/433 V 100 KVA CSP Distribution Transformer (Aluminium) including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Labour & Transport charges for Shifting of TRANSFORMER along with electrical cables , panel board

1

8932

8932

... More
Item;Supply of 4 C, 185 sqmm XLPE cable as per site requirement including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge for Shifting/reinstallation of existing 40 KW solar plant on roof of the water sumps

100

1159

115900

... More
Item;Supply of 25 x3 mm GI flat per site requirement including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge for Shifting/reinstallation of existing 40 KW solar plant on roof of the water sumps

200

32

6400

... More
Item;Provision of earth pits as per site requirement including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge for Shifting/reinstallation of existing 40 KW solar plant on roof of the water sumps

10

8000

80000

... More
Item;Supply of Lighitning arrestor including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge for Shifting/reinstallation of existing 40 KW solar plant on roof of the water sumps

1

39000

39000

... More
Item;Supply of MC4 Connectors as per requirement at site including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge for Shifting/reinstallation of existing 40 KW solar plant on roof of the water sumps

200

25

5000

... More
Item;Supply of 4Sqmm DC cable used for string connections as per requirement at site including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge for Shifting/reinstallation of existing 40 KW solar plant on roof of the water sumps

1000

40

40000

... More
Item;Supply of Solar Structure Including Galvanized/Pre Galvanized parts as per site requirements including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge for Shifting/reinstallation of existing 40 KW solar plant on roof of the water sumps

40

4500

180000

... More
Item;Supply of DC DB suitable of 20KWp ( Outdoor Type) including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge for Shifting/reinstallation of existing 40 KW solar plant on roof of the water sumps

2

30000

60000

... More
Item;Supply of AC DB suitable of 20KWp ( Outdoor Type) including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge for Shifting/reinstallation of existing 40 KW solar plant on roof of the water sumps

2

37000

74000

... More
Item;Supply of 20KWp On Grid Solar Inverter including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge for Shifting/reinstallation of existing 40 KW solar plant on roof of the water sumps

2

175000

350000

... More
Item;Supply of 24V 250Wp Solar PV Module including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge for Shifting/reinstallation of existing 40 KW solar plant on roof of the water sumps

40

6150

246000

... More
Item;Erection & comissioning of solar rooftop from the material identified as usable including concrete work for pedestals of structure.including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge for Shifting/reinstallation of existing 40 KW solar plant on roof of the water sumps

40

6500

260000

... More
Item;Identifying & Seggregating usable material from the dismantled solar rooftop power plant including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge for Shifting/reinstallation of existing 40 KW solar plant on roof of the water sumps

40

2900

116000

... More
Item;Dismantling, removal, shifting including transportation of existing Solar rooftop power plant including Solar Panels, Inverters, AC DB, DC DB & Structure.including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge for Shifting/reinstallation of existing 40 KW solar plant on roof of the water sumps

40

23000

920000

... More
Item;Manufacture,supply , erection of I Beam section for instalation of trally crane over the corbel beam including cost fabrication ,transportation ,loading and unloading charges and Labour charges for fabricating all structural steelworks like heavy steel works like Trusses, Stanchions, Heavy Beams and Girders includingcost of welding rods, power charges, etc including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR PUMP ROOM

3152.2

180

569413.41

... More
Item;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc.,including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR PUMP ROOM

2.94

77684

228393.72

... More
Item;Supply and application of two coats of Supply of ready mixed Synthetic Enamel paintsin all shades Grade - I (IS - 13213) having VOC (Volatile Organic Compound ) content less than 30 grams/Lit. of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to site, sales & other taxesexcept GST, incidental, operational and all labour charges, scaffolding charges, including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.FOR PUMP ROOM

21.24

127

2715.11

... More
Item;Supply and application of two coats of acrylic emulsion paint weather proof water-based, modified acrylic with silicon additives exterior grade having VOC (Volatile Organic Compound ) content less than 30 grams/Lit to RCC concrete surface at Elevated corridor, Underpass, Trumpet, Interchange etc, of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, all labour charges, scaffolding charges, overheads & contractors profit charges, all taxes except GST etc., including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.FOR PUMP ROOM

1147.11

228

261564.02

... More
Item;Supply and fixing of pre-painted steel casement/ open able windows base steel as per IS 513 of - 0.58 mm thick 'D quality, galvanized as per IS 277, finish painted with a polyester paint, section for outer frame of 46 x 52 mm section for shutter of 46 x 46 mm section for mullion 46 x 70 mm, and section for beading 18 x 25 mm panelled with 5 mm thick plain float glass fitted with EPDM gaskets, handle made of high radealuminium powder coated frames fixed to the concrete /masonry wall by means of selfexpanding screws including 10 mm square guard bars @ 150 mm pitch for Windows: Double shutter for sizes 2'0 x 4'0 (609.6 x 1219.2 mm ) 3'-0 x 4'-0 (914.4mm x 1219.2 mm) without mullion section including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR PUMP ROOM

14.4

7540

108576

... More
Item;Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm Diameter nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories, including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. as per special Spec: 1108 FOR PUMP ROOM

21.24

5217

110813.33

... More
Item;Flush Pointing to CRS Masonry in CM(1:3) Prop: including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing,including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. (APSS 901,906) of AP Revised data BLD -CSTN- 7-2 FOR PUMP ROOM

120

127

15242.4

... More
Item;Plastering 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including c/c of all materials like cement, sand,water etc., to site, other taxes on all materials, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.. (APSS 1001,1003 & 1004) (CSSR) FOR PUMP ROOM

1147.11

606

695573.09

... More
Item;Providing impervious coatwith CM (1:3) prop. 20 mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, and other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.(APSS No. 901 & 903). of AP Revised data BLD -CSTN- 10-25. FOR PUMP ROOM

238.14

368

87721.25

... More
Item;Plastering with CM (1:3) 20mm thick including cost and conveyance of all material, labour charges etc., completecm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, & other taxes on all materials, all operational, incidental and labor charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.. FOR PUMP ROOM

192.15

331

63661.22

... More
Item;Construction of Super Structure with Brick masonary in (1:6) using 2nd class bricks using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, other taxes on all materials, all operational, incidental and labor charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.. FOR PUMP ROOM

107.36

8604

923804.89

... More
Item;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarryincluding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing, contractor profir and over heads etc. including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. For M-30 grade using cement qty not less than 400 Kgs of Cement per Cum For Pump Pedstals FOR PUMP ROOM

4.19

11784

49377.22

... More
Item;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarryincluding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing, contractor profir and over heads etc. including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.. For M-30 grade using cement qty not less than 400 Kgs of Cement per Cum for Roof Slab of 150mm thick at 2.90M ht FOR PUMP ROOM

35.72

13183

470909.62

... More
Item;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing, contractor profir and over heads etc. complete but excluding seignarage charges cost of steel and its fabrication charges for finished item of work. For M-30 grade using cement qty not less than 400 Kgs of Cement per Cum for Roof Beams FOR PUMP ROOM

12.12

13298

161181.33

... More
Item;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarryincluding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing, contractor profir and over heads etc. complete but excluding seignarage charges cost of steel and its fabrication charges for finished item of work. For M-30 grade using cement qty not less than 400 Kgs of Cement per Cum including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Above Top Slab of GLSR FOR PUMP ROOM

7.74

13433

103971.88

... More
Item;Coursed Rubble stone masonry in CM (1:6) prop: (Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing,including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for foundation and basement (APSS No. 601 & 615) in GROUND FLOOR of AP Revised data BLD -CSTN- 6-6 FOR PUMP ROOM

16.2

5496

89037.95

... More
Item;Random Rubble stone masonry, in CM (1:6) prop: (Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing ,including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. (APSS No. 601 & 615) of AP Revised data BLD -CSTN- 6-13 FOR PUMP ROOM

24

4945

118680.24

... More
Item;Plain Cement concrete (1:3:6) using 40 mm gauge HG metal including cost & conveyance of all materials and labour charges ,seigniorage charges using concret mixer etc including cost and conveyance of all materials like cement, 50% Sand +50% Rock sand of Concrete coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, centering ,Shuttering Curing and including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR PUMP ROOM

6

5417

32506.8

... More
Item;Sand filling in basement with watering and tamping etc. complete. including sales & other taxes on all materials including all operational, incidental and labour charges such as including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR PUMP ROOM

6

987

5925

... More
Item;Dewatering from excavated pit with 5 HP Pump Set (Diesel ) including hire charges of Pump Set cost of fuels and labour charges,including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR PUMP ROOM

48

351

16884

... More
Item;Carting away unuseful excavated Soils and excavated materilas at site including loading and unloading transportation , (lead upto7 km) away from the work spot, including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.. FOR PUMP ROOM

45

107

4851

... More
Item;Engauging the Tipper Truck for disposal of debries from construcion site after clearing and dismantling the old unwanted structure ( Compoundwall , old Room) at site including cost of machinory hire charges and fuel charges, Driver patta , including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.for Re Construction of Semi under ground GLSR of 2300 KL capacity

384

1454

558616.32

... More
Item;Engauging the JCB including cost of machinory hire charges and fuel charges, Driver patta and for for Dismantling of Compound wall for clearing the site including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Re Construction of Semi under ground GLSR of 2300 KL capacity

60

9000

540000

... More
Item;Provision for Water Measurement Board including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Re Construction of Semi under ground GLSR of 2300 KL capacity

1

75000

75000

... More
Item;Colouring of Name Plate10x12' with Black back ground and White letter including cost of materials and labour charges etc including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge..for Re Construction of Semi under ground GLSR of 2300 KL capacity

1

15000

15000

... More
Item;Supplying & fixing 602 x 602 mm CI manhole frame and cover (light weight) 30 Kgst) including cost and fixing of manhole coverinclding all otheer taxes ,cost convayance and labour chagres including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Re Construction of Semi under ground GLSR of 2300 KL capacity

2

4118

8237.08

... More
Item;Supply of Stainless Steel pipes of grade 304 including Labour charges for Fabrication of stainless steel railing works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish inclding all otheer taxes ,including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Re Construction of Semi under ground GLSR of 2300 KL capacity

51.91

6080

315644.47

... More
Item;Supply & Delivery of Centrifugally Cast ductile Iron K9 pressure pipes with socket spigot ends confirming to I.S.8329/2000 in Standard Working lengths of 4.5, 5.5 & 6 meter for classification K9 suitable for push-on-joint (Rubber Gasket D jointing) with cement mortar lining inside the pipe with outside zinc coating including transportation, all taxes and duties & Jointing of D.I. pipes and fittings with s/s ends and Lowering carefully into the trench and laying them true to alignment and gradient including all sundries, and jointing of required specials like Tees, bends, crosses with or without differential dia., as per BIS No.3114/85 and, filling with water, with a water lead upto 500 m and testing to Pressure gauage etc. including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for 450mm dia for Re Construction of Semi under ground GLSR of 2300 KL capacity

425

22422

9529537

... More
Item;Supply & Delivery of Centrifugally Cast ductile Iron K9 pressure pipes with socket spigot ends confirming to I.S.8329/2000 in Standard Working lengths of 4.5, 5.5 & 6 meter for classification K9 suitable for push-on-joint (Rubber Gasket D jointing) with cement mortar lining inside the pipe with outside zinc coating including transportation, all taxes and duties & Jointing of D.I. pipes and fittings with s/s ends and Lowering carefully into the trench and laying them true to alignment and gradient including all sundries, and jointing of required specials like Tees, bends, crosses with or without differential dia., as per BIS No.3114/85 and, filling with water, with a water lead upto 500 m and testing to Pressure gauage etc. for complete item of work as directed by Engineer-in-charge for 300mm dia for Re Construction of Semi under ground GLSR of 2300 KL capacity

420

12573

5281071.6

... More
Item;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Re Construction of Semi under ground GLSR of 2300 KL capacity

141.68

77684

11006402.3

... More
Item;Supply and application of two coats of Supply of ready mixed Synthetic Enamel paintsin all shades Grade - I (IS - 13213) having VOC (Volatile Organic Compound ) content less than 30 grams/Lit. of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to site, other taxes incidental, operational and all labour charges, scaffolding charges, overheads & contractors profit, etc., complete for finished item of work and as directed by Engineer-In-charge. for Re Construction of Semi under ground GLSR of 2300 KL capacity

111.23

127

14218.53

... More
Item;Supply and application of two coats of acrylic emulsion paint weather proof water-based, modified acrylic with silicon additives exterior grade having VOC (Volatile Organic Compound ) content less than 30 grams/Lit to RCC concrete surface at Elevated corridor, Underpass, Trumpet, Interchange etc, of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, all labour charges, scaffolding charges, oincluding Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge..for Re Construction of Semi under ground GLSR of 2300 KL capacity

1452.69

228

331242.37

... More
Item;Providing impervious coatwith CM (1:3) prop. 20 mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges,including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. (APSS No. 901 & 903). of AP Revised data BLD -CSTN- 10-25.for Re Construction of Semi under ground GLSR of 2300 KL capacity

1452.69

368

535112.89

... More
Item;Plastering with CM (1:3) 20mm thick including cost and conveyance of all material, labour charges etc., completecm. including cost and conveyance of all materials like cement, sand, bricks, water . other taxes etc., to site, ,all operational, incidental and labor charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing,including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.. for Re Construction of Semi under ground GLSR of 2300 KL capacity

111.21

331

36844.99

... More
Item;Supply and placing of the Design Mix M-30 grade Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarryincluding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing etc. complete but excluding,seignarage charges cost of steel and its fabrication charges for finished item of work. for M-30 grade using cement qty not less than 400 per Cum for Top Slab on Sump including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Re Construction of Semi under ground GLSR of 2300 KL capacity

195.24

13183

2573919.21

... More
Item;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarryincluding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing etc. complete but excluding seignarage charges ,cost of steel and its fabrication charges for finished item of work. For M-30 grade using cement qty not less than 400 Kgs of Cement per Cum for Beams including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Re Construction of Semi under ground GLSR of 2300 KL capacity

25.06

13081

327829.66

... More
Item;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarryincluding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing etc. complete but excluding Seignarage charges ,cost of steel and its fabrication charges for finished item of work. For M-30 grade using cement qty not less than 400 Kgs of Cement per Cum for Columns in Sump (6.0-6.75 M) including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Re Construction of Semi under ground GLSR of 2300 KL capacity

1.3

13634

17724.4

... More
Item;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarryincluding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing etc. complete but excluding Seignarage charges ,cost of steel and its fabrication charges for finished item of work. For M-30 grade using cement qty not less than 400 Kgs of Cement per Cum for Columns in Sump (5.0-6.0 M) including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Re Construction of Semi under ground GLSR of 2300 KL capacity

2.88

13567

39073.31

... More
Item;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarryincluding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing etc. complete but excluding Seignarage charges ,cost of steel and its fabrication charges for finished item of work. For M-30 grade using cement qty not less than 400 Kgs of Cement per Cum for Columns in Sump (4.0-5.0M) including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Re Construction of Semi under ground GLSR of 2300 KL capacity

2.88

13500

38880.26

... More
Item;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarryincluding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing etc. complete but excluding Seignarage charges ,cost of steel and its fabrication charges for finished item of work. For M-30 grade using cement qty not less than 400 Kgs of Cement per Cum for Columns in Sump (0.0-3.0M) &(3.0-4.0M) including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Re Construction of Semi under ground GLSR of 2300 KL capacity

11.52

13433

154748.85

... More
Item;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarryincluding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete butfor finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing etc. complete but excluding, Seigniorage charges cost of steel and its fabrication charges for finished item of work. for M-30 grade using cement qty not less than 400 per Cum for Side walls including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Re Construction of Semi under ground GLSR of 2300 KL capacity

227.03

14981

3401352.11

... More
Item;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarryincluding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing excluding seigniorage charges,etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for M-30 grade using cement qty not less than 400 per Cum for Raft Slab including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Re Construction of Semi under ground GLSR of 2300 KL capacity

321.2

11918

3828257.53

... More
Item;Plain Cement concrete (1:3:6) using 40 mm gauge HG metal including cost & conveyance of all materials and labour charges ,seigniorage charges using concret mixer etc including cost and conveyance of all materials like cement, 50% Sand +50% Rock sand of Concrete coarse aggregate, water etc., to site and including other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, centering ,Shuttering Curing and Contractor profot and over heads,including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Re Construction of Semi under ground GLSR of 2300 KL capacity

168.69

5551

936550.01

... More
Item;Sand filling in basement with watering and tamping etc. complete. including sales & other taxes on all materials including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Re Construction of Semi under ground GLSR of 2300 KL capacity

106.03

987

104704.63

... More
Item;Dewatering from excavated pit with 5 HP Pump Set (Diesel ) including hire charges of Pump Set cost of fuels and labour charges,including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Re Construction of Semi under ground GLSR of 2300 KL capacity

1920

351

675360

... More
Item;Carting away unuseful excavated Soils and excavated materilas at site including loading and unloading transportation , (lead upto 7 km) away from the work spot, including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge..for Re Construction of Semi under ground GLSR of 2300 KL capacity

4417.86

107

476245.31

... More
Item;Earthwork in excavation for structures in Hard Rock With blasting prohibited as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH 3.0M to 6 m depth for Re Construction of Semi under ground GLSR of 2300 KL capacity

883.57

2375

2098894.03

... More
Item;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. beyond 3.0M depth for Re Construction of Semi under ground GLSR of 2300 KL capacity

1837.83

150

276556.66

... More
Item;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH Up to 3.0M depth including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Re Construction of Semi under ground GLSR of 2300 KL capacity

1696.46

131

223372.89

... More
Item;Supply of Sintex /Aqua tech or equivalent Polyethylene water storage tank double layer confirming to ISI 12701/96 mark with of 500lts including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Sanitory and water supply for Meeting Hall

3000

11

34080

... More
Item;Supply & fixing of tested NP bib taps at all levels of 12.70mm dia of Indian make first quality including cost & conveyance of all materials, labour charges for finished item of work complete for all floors including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Sanitory and water supply for Meeting Hall

12

312

3749.28

... More
Item;EXTERNAL SEWERAGE: Constructing 457.2mm x 457.2mm ( 1'-6" x 1'-6") brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm (3'-0") and fitted with light weight 457.2mm x 457.2mm ( 1'-6" x 1'-6") C.I. frame and cover of 20Kg. including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work. a] Depth up to 0.90M iincluding Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Sanitory and water supply for Meeting Hall

8

4610

36880

... More
Item;SANITARY FITTINGS:- 75 mm dia - 45 Degree Bend - UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand) including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Sanitory and water supplyfor Meeting Hall

8

47

376

... More
Item;Supply,fixing of 110 mm deep PVC floor traps of self cleansing design with outlet size of 75mm diameter of approved make, including making connection with PVC soil/waste pipes using rubber gaskets and top shall be cover with removable CP strainer, including contractor profit etcetc., complete 110mm deep PVC floor traps(101.6) for Sanitory and water supply for Meeting Hall

8

194

1554.24

... More
Item;Providing & fixing UPVC SWR pipes TYPE-B conforming to IS 13592:1992 including necessary specials,jointing with adhesives ,fixing vertical pipes over wooden battens including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. of 110 mm Dia for Sanitory and water supply for Meeting Hall

20

603

12066

... More
Item;S& F GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges including contractor profit etc complete 20mm dia. including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Sanitory and water supply for Meeting Hall

100

282

28290

... More
Item;Supply & fixing 580mm x 440mm size white virerous orissa pan with attached footrests of approved make confirming to IS 2556 (part - III) with 'P' or 'S' trap, including 10 lit. low level PVC flusihing system confirming to IS 7231 with all internal fittings, CI brackets, 32mm dia CP flush pipe, 15mm dia 450mm long PVC connerctor, 15mm dia Cp brass strop cock 300 grams of ISI make, cutting and making good the walls and floors wherever required including cost & conveyance of all material to work site, all labour charges for all operations for fixing etc., including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.. for Sanitory and water supply for Meeting Hall

4

3853

15415.28

... More
Item;Supply, installation, testing and commissioning of C.I. non - return valve of following sizes confirming to IS: 5312 complete with rubber gasket, GI bolts, nuts, washers etc as required Makes: Audco / Kirloskar / BDK / H-Shankar / Leader/ Zolotto / Intervalve / Honeywell./ Kartar including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Electrical Work for Meeting Hall

1

4383

4383.27

... More
Item;Supply and transportation of 20W +/10%, >/ 2000 lumens, 1200mm length LED retro tube light, housing made with alluminium anodised body, wide operating voltage with double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, minimum CRI=80,.etc complete with 5 years warranty with BIS Certification.LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / Panasonic / Halonix / HPL / Eveready / Surya / Keselec / Arraystorm / GM / Goldmedal / Goldwyn / Fortune Arrt / Lighting Technologies. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Electrical Work for Meeting Hall

12

814

9779.16

... More
Item;Supply of 900 mm (36") / 1200 mm (48") / 1400 mm (56") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessories including contractor profit etc.and as per 9.7.2 of Sta revised data of BLD -ELEC including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Electrical Work for Meeting Hall

6

5300

31803.18

... More
Item;Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges, including contractor profit etc etc., complete for small quarters. including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Electrical Work for Meeting Hall

1

4986

4986.7

... More
Item;Supply and fixing SPN Distribution board with IP-20 protection suitable for single phase Earth Leakage Circute Braker (ELCB) / Residual Current Circute Braker (RCCB) / Double Pole (DP) Isolator as incomer and 10kA SP MCBs as out going including internal connections and labour charges for surface / flush mounting etc., complete.including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Electrical Work for Meeting Hall

1

4007

4007.2

... More
Item;Run of Mains: Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for earth continuity including all labour charges including contractor profit etcetc., complete.and as per 3.1.2 of Sta revised data of BLD -ELEC including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Electrical Work for Meeting Hall

360

29

10497.6

... More
Item;Supply and fixing of 16A 3pin / 6A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (5 in one) on decolam sheet covered board including earth connection and all labour charges, including contractor profit etc etc., complete on wall.and as per 2.1.5 of Sta revised data of BLD -ELEC including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Electrical Work for Meeting Hall

6

430

2584.98

... More
Item;Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges, including contractor profit etc etc., complete..and as per 2.1.4 of Sta revised data of BLD -ELEC- including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Electrical Work for Meeting Hall

10

175

1753.3

... More
Item;Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges, including contractor profit etc etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings and as per 2.1.1 of Sta revised data of BLD -ELEC-2-1 including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Electrical Work for Meeting Hall

200

655

131196

... More
Item;Supply and Fixing of 25mm dia 2.00 mm thick surface P.V.C. pipe (ISI MARK) with all accessories fixing on chromium plated metallic base saddles and decolam board for switches for Light, Fan and separate plug point including all labour charges etc., complete as per 1.3.1 of Sta revised data of BLD -ELEC-1-3 including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Electrical Work for Meeting Hall

30

108

3242.1

... More
Item;Supply and Fixing of 25mm dia 1.5mm thick surface P.V.C. pipe (ISI MARK) with all accessories fixing on chromium plated metallic base saddles including all labour charges, including contractor profit etc etc., complete for run of mains and as per 1.3.2 of Sta revised data of BLD -ELEC-1-3 including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Electrical Work for Meeting Hall

180

105

18955.8

... More
Item;Supply,Transportation and fixing of control panel for three phase submersible motors above 7.5 HP to 12.5 HP @ 415V 50Hz operating fitted with supply and fixing of Direct - on - Line LTLK (L&T) /BCH/ SIEMENS / ROMPTON make 0-500V Volt meter and 0-30A Ammeter, Indication lamps, selector switches, CTS, 32A TP MCB, Single phase preventor,suitable contactor to with stand low voltage pick up and high voltage resistant, with ISI marked capacitors assembled with ISI mark contactors and fitted with Legrand make ISI mark MCB etc., complete. including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

1

23291

23291.08

... More
Item;Supply and fixing of 50mm dia nominal bore Medium Class (C) GI Pipe including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.for Meeting Hall

350

783

274379

... More
Item;Supply and fixing of 3 Core 2.50 Sqmm Flat Copper cable of ISI for Submersible Motors. Makes : Finolex / RR Kabel / Havells / KEI / LK (L&T) / Pawancab including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

400

140

56352

... More
Item;Supply and Transportation of star rated 10 HP 20-30 Stage pumpset of Three phase ISI submersible motor pumpset suitable for 6" Bore well. Makes: Texmo / CRI / KSB / Aryenvarsha / Lubi / Falcon including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

1

82938

82938.95

... More
Item;Supply and Fixing of 180mm diaPVC Casing pipe of 6Kgs/SqCm including labour chargesfor fixing etc including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

140

798

111819.4

... More
Item;Drillimg of Bore well of 185mm dia including drilling in all types of soils and transportion and labour charges ect complte including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

350

500

175000

... More
Item;Providing high yield strength deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying including contractor profit etc., and Countryes & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors. and as per revised data BLD-CSTN-4-1 including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

14

77684

1087589.16

... More
Item;Supplying and fixing Gyp Board Fine Line Grid false ceiling (GS-FLC-4.6 as per India Gypsum) in size 600 mm x 600 mm using 12.5 mm thick/ 9.5 mm thick Gyp Board sheet tiles of size 595 mm x 595 mm or 595 mm x 1195 mm conforming to IS 2095 - 1982 fixing to Gyp steel Precoated GI wall angle of size 25 mm x 25 mm x of 0.70 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using pre-coated GI Tee section (24 mm x 38 mm x 0.7 mm) from soffit at 1220 mm c/c fixed with GI Soffit Cleat, rawl plugs and steel expansion fasteners & connecting clip to the GI T section with 4 mm dia GI Rod with galvanized spring steel level clip of PVC universal holding clips system at 1200 mm c/c and fixing the 12.5 mm / 9.5 mm Gypboard Sheet tiles of size 595 mm x 595 mm or 595 mm x 1195 mm and finishing two coats of drywall topcoat complete for finished item of work as per India Gypsum Ltd specification.including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

117.54

2100

246882.19

... More
Item;Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coat Primar with Luppam finishing after thouroughky brushing the surface to remove all remains including cost and conveyance of all materials to site, Countryes & other taxes, all operational, incidental and labour charges,including contractor profit etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212). and as per revised data BLD-CSTN-12-5 including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

30.5

153

4676.87

... More
Item;Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Coat, One Coat (All Colours) in with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

1418.05

274

388942.75

... More
Item;Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for internal walls including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

1467.04

261

384056.4

... More
Item;Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for Internal walls for Meeting Hall

1467.04

278

408908.06

... More
Item;Providing and fixing of top hung Ventilator withfly mesh made of pre-painted steel as per IS 513 of 0.80 mm thick galvanized as per IS 277 with Zinc, finish painted with a polyester paint,section for fly-shutter of 0.6 mm thick and fitted with stainless steel 32 gauge fly mesh of 304 grade and mullions to have double rebate for glazed shutter and fly-shutter with a provision for guard bars/grills and 1 No. of High grade nylon latch handle, window stopper, 2 nos. of with MS Powder coated /SS ball bearing butt Hinges provided per shutter and windows fitted with 4 mm thick plain float glass with rubber gaskets including fixing the frames in concrete/masonry wall by means of selfexpanding screws, Including 10 mm Square guard bars with 6? (152.4mm) pitch etc., complete for finished item of work for (i) Single fixed Louvers Ventilator window size of 2? 0? x 2? 0?(609.6 x 609.6mm) outer frame box section size of 100 x 45mm, fly mesh shutter frame section size 52 x 25 mm including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

1.08

6805

7349.98

... More
Item;Providing & Fixing of Open able Windows with Fly-mesh made of pre-painted steel as per IS 513 of 0.58 mm thick galvanized as per IS 277 finish painted with a polyester paint and the section for outer frame of 72 x 55mm, centre mullion of 72 x 50mm, section for fixed glass beading section of 12 x 12 mm and section for shutters of 48 x 25 mm and outer frame & mullion sections with rebate for glazed shutters, fly mesh and a 20 mm provision for guard bars/grills and fly mesh shutter section of 20 x 40 mm, stay, handles, latch 2 Nos of heavy duty stainless steel pivot hinges per shutter and panelled with 5mm thick plain float glass and S.S. Mesh for fly mesh shutter (304 grade), fitted using rubber gaskets including fixing the windows in the concrete/masonry wall by means of selfexpanding screws, including 10mm Square guard bars with 6? (152.4mm) pitch , complete for Centre fixed both side open able shutter window for a size 5?0?x4?0? (1524mm x1219.2mm).including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

18.59

9748

181218.48

... More
Item;Supply and fixing of Salwod Door Single shutter fully panelled door of size 0.75 x 2.1mt with frame made of well seasoned Teak Wood scantlings of size 100 x 75mm and shutter made of side rails 100mm X 32mm, top rail 100 mmX32 mm, bottom rail 100mmX 32 mm and intermediate rails of 100mm x 32 mm and planks s - 5 no's of 25mm thick as per approved design with fixtures of 6 nos of 9" ' z" holdfasts, 300 mm long MS Iron coted aldrop-1 no, 125mm long MS iron butt hinges 6 No's, Door stoppers-2 no, 150mm long MS coated Tower bolts 3- no's MS iron coated fancy handles 150 mm -2nos with necessary screws complete including cost and conveyance of all materials and labour charges etc. complete as per specifications (APSS NO.1001 & 1002) ,including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

3

10035

30107.52

... More
Item;Supply and fixing of Salwod Door double shutter fully panelled door of size 0.90 x 2.1mt with frame made of well seasoned Teak Wood scantlings of size 100 x 75mm and shutter made of side rails 100mm X 32mm, top rail 100 mmX32 mm, bottom rail 100mmX 32 mm and intermediate rails of 100mm x 32 mm and planks s - 5 no's of 25mm thick as per approved design with fixtures of 6 nos of 9" ' z" holdfasts, 300 mm long MS Iron coted aldrop-1 no, 125mm long MS iron butt hinges 6 No's, Door stoppers-2 no, 150mm long MS coated Tower bolts 3- no's MS iron coated fancy handles 150 mm -2nos with necessary screws complete including cost and conveyance of all materials and labour charges etc. complete as per specifications (APSS NO.1001 & 1002) including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

2

11267

22535.44

... More
Item;Supply and fixing of Sal wood Door double shutter fully panelled door of size 1.20 x 2.1mt with frame made of well seasoned Teak Wood scantlings of size 100 x 75mm and shutter made of Teak wood side rails 100mm X 32mm, top rail 100 mmX32 mm, bottom rail 100mmX 32 mm and intermediate rails of 100mm x 32 mm and planks s - 5 no's of 25mm thick as per approved design with fixtures of 6 nos of 9" ' z" holdfasts, 300 mm long MS Iron coted aldrop-1 no, 125mm long MS iron butt hinges 6 No's, Door stoppers-2 no, 150mm long MS coated Tower bolts 3- no's MS iron coated fancy handles 150 mm -2nos with necessary screws complete including cost and conveyance of all materials and labour charges etc. complete as per specifications (APSS NO.1001 & 1002) including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.. complete as per specifications for Meeting Hall

2

13337

26675.62

... More
Item;Flush Pointing to CRS Masonry in CM(1:3) Prop: including cost and conveyance of all materials like cement, sand, water etc., to site, including , Countryes & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing,including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. (APSS 901,906) of AP Revised data BLD -CSTN- 7-2 for Meeting Hall

281.2

127

35718.02

... More
Item;Providing dadooing to internal walls with digital / polished glazed full body porcelain high lighter wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including c., complete for finished item of work, but excluding the cost of conveyance of all materials mixing of cement mortar, laying in position, curing, lift charges,including contractor profit etc., complete for finished item of work (APSS No.701 & 707) of AP Revised data BLD -CSTN- 9-18 including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

63.21

1092

69059.45

... More
Item;Flooring with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of ize 600 x 600 mm and thickness between 8-10 mm 1st quality onforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs and set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etcand .excluding seigniorage charges., complete, including etc the cost of conveyance of all materials. complete for finished item of work, but excluding Seign charges including Contractors profit and Overhead charges complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

162.35

1332

216331.38

... More
Item;Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4 mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, Countryes & other taxes on all materials, all operational, incidental and labor charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing,including contractor profit etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) For External walls of AP Revised data BLD -CSTN- 8-9, including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

264.75

625

165548.18

... More
Item;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, Countryes & other taxes on all materials, all operational, incidental and labor charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing,including contractor profit etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) For Internal walls of AP Revised data BLD -CSTN- 8-10,including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

1311.6

606

795328.01

... More
Item;Ornamental plastering to ceiling 12mm thick in CM (1:5) with dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, finishing, scaffolding, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etcincluding contractor profit ., complete for finished item of work.(APSS 901& 903 ) of AP Revised data BLD -CSTN- 6-1 including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

155.44

205

31869.86

... More
Item;Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20 mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, including contractor profit etc., complete for finished item of work (APSS No. 901 & 903). of AP Revised data BLD -CSTN- 10-25 including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.for Meeting Hall

173.65

677

117609.67

... More
Item;Filling with carted gravel (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental, labor charges, hire charges of T & P including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.(APSS NO. 309 & 310) of AP Revised data BLD -CSTN- 2-9 for Meeting Hall

139.51

296

41347.97

... More
Item;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental, labor charges, hire charges of T & P including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.(APSS NO. 309 & 310) of AP Revised data BLD -CSTN- 2-9 for Meeting Hall

220.99

45

10085.98

... More
Item;Brick Masonry in superstructure with CM (1:6) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental and labor charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, including contractor profit etc., complete for finished item of work. (APSS No. 501 & 504) of AP Revised data BLD -CSTN- 5-4 including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

137.35

8604

1181861.04

... More
Item;Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent to (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete,including contractor profit etc., complete for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402) of AP Revised data BLD -CSTN- 2-10 including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

0.6

5720

3432.02

... More
Item;Vibrated reinforced cement concrete corresponding M20 grade as per IS 456 equivalent to (1:1.5:3) prop: nominal mix (Cement: fine aggregate: coarse aggregate using 20mm size HBG (SS5) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc. to site including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as centering, shuttering, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete including contractor profit etc, complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402 & 403) FOR SUNSHADE 0.60 M WIDE. and including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

19

618

11753.78

... More
Item;Plain reinforced cement concrete corresponding M15 grade as per IS 456 equivalent to (1:1.5:3) prop: nominal mix (Cement: fine aggregate: coarse aggregate using 20mm size HBG (SS5) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc. to site including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as centering, shuttering, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete, (APSS No.402 & 403) for LINTELS of AP Revised data BLD -CSTN- 6-6) and including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

0.95

13724

13038.03

... More
Item;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing ,including contractor profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.of AP Revised data BLD -CSTN- 3-13 including centering, shuttering and including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. of AP Revised data BLD -CSTN- 3-13 For Roof Slab(1:1.5:3) prop 125 mm thick for Meeting Hall

173.63

1478

256750.15

... More
Item;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing ,including contractor profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.of AP Revised data BLD -CSTN- 3-13 including centering, shuttering and .including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. of AP Revised data BLD -CSTN- 3-13 For Roof Beams for Meeting Hall

9.6

12309

118169.86

... More
Item;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing ,including contractor profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.of AP Revised data BLD -CSTN- 3-13 including centering, shuttering and .including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. of AP Revised data BLD -CSTN- 3-13 for Plinth beams for Meeting Hall

7.6

14303

108707.74

... More
Item;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing ,including contractor profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.of AP Revised data BLD -CSTN- 3-13 including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.for Columns Below Ground level for Meeting Hall

6.1

12589

76794.12

... More
Item;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing ,including contractor profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.of AP Revised data BLD -CSTN- 3-13 including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. BLD -CSTN- 3-13 for Column Footings for Meeting Hall

29.4

10852

319059.09

... More
Item;CRS Masonry in CM (1:6) 2nd Sort (Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615) (APSS No. 601 & 615) in GROUND FLOOR of AP Revised data BLD -CSTN- 6-6 including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

69.01

5496

379290.69

... More
Item;RR Masonry in CM (1:6) Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, 50% sand +50% Rock Sand, water, etc., to site including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615 (APSS No. 601 & 615) of AP Revised data BLD -CSTN- 6-13 including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Meeting Hall

136.59

4945

675438.92

... More
Item;Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture. All work upto plinth level. nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry including cost and conveyance of all materials like cement, 50% sand+50% Rock Sand coarse aggregate, water etc. to site, including Countryes & other taxes on all materials, all operational, incidental, and labor charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Foundations and Flooring Bed (APSS No. 402) for Meeting Hall

13.95

4969

69323.55

... More
Item;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.for Meeting Hall

315.7

131

41568.22



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.