Endowments Department Tender
... More
The Endowments Department has issued a formal invitation for competitive bids for Construction Of Sri Jagadamba Devi And Sevalal Maharaj Temple, Dongargoan (bheemjee Thanda) (v), Indravelly (m), Adilabad District in Adilabad, Telangana, with an estimated contract value of Rs. 15,15,943. The bid opening date for this tender is 10-04-2025 and the last date for bid submission is 25-04-2025. Interested bidders for Endowments Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Endowments Department Tender
Opening Date10 Apr 2025
Closing Date25 Apr 2025
Tender Amount₹ 15,15,943
Costs
EMD
₹ 15,159Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
587867Tender No
EE/01/2025-28Tender Authority
Endowments Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Civil Work;Earth work excavation in all type of soils like BC, Redearth,Ordinary gravels etc with initial lead and lifts etc. complete for foundation
75.69
2253
17060
... More
Civil Work;Dressing
28.41
479
13608
... More
Civil Work;P.C.C. (1:4:8) in prop. (Cement:fine aggregate: coarse aggregate) using 40mm size (SS 5) hard granite machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, machine mixing, laying of concrete in foundations and under flooring bed, ramming in layers not exceeding 15cm thick, finishing top surface to the required level, curing etc., but excluding seigniorage charges and GST complete forfinished item of work
10.47
5018
52545
... More
Civil Work;Supply and Filling of gravel in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges, complet
19.46
504
9815
... More
Civil Work;1st Storey
10.92
12691
138588
... More
Civil Work;Supply and fixing of Black Granite stone including fine dressing and polishing to the shape and dimesnions as per the approved drawing including cost and conveyance of all material and labour charges etc., excluding seigniorage charges 7 taxes on all materials complete
1
25000
25000
... More
Civil Work;Flooring with high polished shabad stones 1st quality 15mm to 18mm thick wideth of 2.43m set over base coat of cement mortar (1:8) 20mm thick (joints of stone must be flushed) over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.30 Kgs per sqm., jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like flooring slab, cement, sand, and water etc., to complete excluding seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stoens etc., complete for finished item of work but excluding the cost of conveyance of all materials.
37.73
7655
28885
... More
Civil Work;Plastering with 20mm thick double coat in CM (1:6) 8mm thick base coat and CM(1:4) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work
48.3
4718
22788
... More
Civil Work;Impervious coat to exposed RCC roof slab surface with CM (1:3) 20 mm thick with 1 kg of water proof compound/ bag of cement laid over roof when it is in green including cost and conveyance of all materials to site, cost of, all taxes, finishing, curing, scaffolding and all operational, incidental, labour charges, etc., including cutting grooves where ever necessary etc., complete for finished item of work.
35.74
4985
17816
... More
Civil Work;Painting with Emulsion paint with two coats over a primary coat of approved make colour and shade duly cleaning the surface dusting of the loosed particles after rubbing, then applying two coats of Emulsion paint to obtain. smooth surface and in case of bad workman ship applying one (or) more coats as required after rubbing down the surface including labour charges, cost of paint, operation charges etc complete for finished work.
260
1730
45001
... More
Civil Work;Flooring with hard Granite stones , including cost of all materials like flooring slab, cement, sand, and water etc., to complete excluding seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stoens etc., complete for finished item of work but excluding the cost of conveyance of all materials.
-
-
-
... More
Civil Work;Supply and fixing of Brass Stoopi with Stoopidandam upto 2'-0" ht(18 to 20 guage) including cost and conveyance of all materials and labour charges etc., complete
1.83
2570
4703
... More
Civil Work;Up to Prastharam
62.42
12242
76416
... More
Civil Work;Plastering with 12mm thick double coat in CM (1:5) 8mm thick base coat and CM(1:3) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work
84.3
4542
38297
... More
Civil Work;Up to 20'-0" ht
1920
12
23040
... More
Civil Work;Providing High Yield Strength Deformed (HYSD/ TMT/MS) Steel bars (Fe 500/500D/550 D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forminggrills fro reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overhead charges & contractor's profit but excluding GST on all materials etc., complete for finished item of work in all floors
1.44
74531
107326
... More
Civil Work;Roof Beam
3.04
12045
36619
... More
Civil Work;Providing Ceiling Padmam
19.64
310
6088
... More
Civil Work;Ornamental plastering to pillars alround
264
120
31680
... More
Civil Work;Providing Pushpa Pothikas
16
1400
22400
... More
Civil Work;Supplying and fixing of scaffolding during execution of work including cost and conveyance of all materials such as Casino poles, bamboos platform, nails and coir rope etc., complete
-
-
-
... More
Civil Work;Supply and Filling of Sand in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges, complete for finished item of work incluiding cost and conveyance of all materials and labour chages, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete
2.91
1240
3610
... More
Civil Work;1st Storey
35.52
27014
95956
... More
Civil Work;Kodangai
30.48
1369
41735
... More
Civil Work;Pedastals
1.81
9873
17870
... More
Civil Work;Up to Prastharam
7.02
12377
86889
... More
Civil Work;Supplying and fixing of teak wood temple type Door shutter with Best teak wood frame of 2" thick, Padmams of 2.5" thick and best Teak Wood rear plank of thickness 1.5" thick 2 leaves as per standard temple design including cost of frame and planks and preparation charges fixing of shutters in position, locking arrangements etc., complete. Double Padmams with padmarekulu & Plain frame
18
2850
51300
... More
Civil Work;Supply and placing of the VRCC M20 Nominal mix Concrete ( Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 usign with 20mm size graded machine crushed Hard Granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreagate(sand), coarse aggreagate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as machine mixing using concrete mixer, laying concrete, curing, including contractor's profit and over head charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work including steel centering & shuttering, laying concrete, vibrating, curing etc., complete but excluding GST charges for finished item of work
-
-
-
... More
Civil Work;Footings
8.15
9284
75669
... More
Civil Work;Ornamental Plastering 25mm to 40mm thick with base plastering 12mm to 20mm in CM (1:3) and top finishing 12mm thick with CM (1:2) to bring the required ornamentation, fine and rendering with neat cement including cost and conveyance of all materials, labour charges,all incidental and operational charges, curing etc., complete. to the required shape and size as per the approved drawing and as per silpi drawing and as per silpi norms. excluding seigniorage charges, operational charges etc., complete
-
-
-
... More
Civil Work;Roof Slab 125mm thick
41.81
1441
60289
... More
Civil Work;Labour Charges
28.41
32
909
... More
Civil Work;2nd Storey
6.09
13005
79201
... More
Civil Work;2nd Storey
29.2
29285
85514
... More
Civil Work;Plinth Beam
2.43
12034
29243
... More
Civil Work;Construction of RR masonry in CM (1:8) Cement: Sand using hard granite stones from approved quarry including cost and conveyance of all materials like trap stones, cement, sand,water etc., to site including cost and conveyance of all materials and all operational, incidetnal and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement
29.25
4600
134572
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements