Endowments Department Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
523745Bid Award Id
ViewTender No
C1/1045/2024Tender Authority
Endowments Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
PCC Flooring way portion;LDPE sheet ( Geo membrane ) 500 micron thick
3003.48
128
385587
... More
PCC Flooring way portion;By Mix in Place Method Construction of Granual Sub-base by providing close graded material (Table 400.1) with Grading III material CBR value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as directed by the Engineer-in-charge and as per Technical specification clause 401 MoRT&H (5th Revision) including contractors provit & Over head charges excluding seignorage charges etc., completed.
366.71
1999
733263
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements