Centre For Cellular And Molecular Biology Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 30,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Entering Into Non Comprahensive Annual Maintenance Contract A.m.c. On Job Contract Basis For Servicing And Maintenance
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CSIR_234099_1Tender No
CCMB/WKS-38/24-25Tender Authority
Centre For Cellular And Molecular Biology ViewPurchaser Address
-Website
http://https://www.csir.res.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Labour charges only for servicing & cleaning of air filters of capacity upto 2 TR Fan Coil units/ Ceiling suspended units as directed by the Engineer-in-Charge. NOTE - the charges for each FCU will be made irrespective of fillers in it.
1
-
-
... More
Labour charges for Water Servicing and Cleaning of Pre-Filters of AHUs/Ceiling Suspended Units/Package ductable units/DAC units capacity upto 12,000 CFM package units as directed by the Engineer-in-Charge NOTE - the charges for each AHU will be made irrespective of fillers in it. a) AHU / CSUs Upto 3000 CFM
1
-
-
... More
b) AHU / CSUs Above 3001 CFM Upto 9000 CFM
1
-
-
... More
c) AHU / CSUs above 9001 CFM Upto 12000 CFM
1
-
-
... More
WORKS TO BE CARRIED OUT ONCE IN 03 MONTHS i.e. QUARTERLY BASIS
-
-
-
... More
Air Cooled Condenser Units Labour charges for Water Servicing of Air Cooled Condenser Units/ Cooling Coils of various capacity of Cold Rooms/ Package ductable units(DAC)/ other Refrigeration Units as per the directions of the Engineer-in-Charge and as & when required. The scope of work includes:
(a) Cleaning of the Coil, blower and condensor fans with air pressures and water
(b) Checking and cleaning of Condensate drain line.
(c) Checking for noise and vibration. IMPORTANT NOTE: The successful tenderer must arrange his own arrangement for Water Pressure Pumps, Air blower etc., required to carryout the work Cooling coils and Condenser coils
1
-
-
... More
Emergency water servicing of AHUs/Ceiling Suspended Units: Labour charges for emergency water servicing of AHUs/ Ceiling Suspended Units upto 12,000 CFM at site without dismantling the units from the site. The scope of work includes:
(a) Cleaning the coil with necessary chemical as per standard laid down procedures. (b) Checking of vibration of Motors and Blowers including providing greasing,oiling,aligning, belt tension etc.,
(c) Cleaning of AHU Pre-filters, blowers and bottom tray.
(d) Inspecting/Checking of the condensate drain pipe and carrying out the cleaning wherever required for smooth flow of water to the drain.
(e) Checking of dampers ,Canvas for proper operation and cleaning /replacement the same wherever required.
(f) Checking of all the parts for proper functionsing and attending the defects wherever required. a) AHU / CSUs Upto 3000 CFM
1
-
-
... More
b) AHU / CSUs Above 3001 CFM Upto 9000 CFM
1
-
-
... More
c) AHU / CSUs above 9001 CFM Upto 12000 CFM
1
-
-
... More
WORKS TO BE CARRIED OUT ONCE IN 06 MONTHS i.e. HALF YEARLY BASIS
-
-
-
... More
Cooling Towers
Labour charges for the following works related to 300TR Cooling Towers at Site, once in six months or as and when required . The work has to be carriedout as per the instructions of the Engineer-in-Charge. The rate has to be quoted as Lumpsum per unit for covering all the items (a) to (g) shown below: (a) Cleaning of Cooling tower sump, louvers,spray nozzles
(b) Checking the unusual noise/vibration in fan and fan guard, motor drive shafts
(c) Inspecting of cloggin in eliminator, fills and water basis and attending the rectifications wherever required.
(d) Checking and adjustment of float valve, wherever required
(e) Checking and arresting of any leakages in water basin and float valve.
(f) Adjusting belt and Pulleys for proper tension and alignments.
(g) General Cleaning of Fan & Fan Guard, Motor shaft, Eliminator, Fills, Water Basin, Float valve, Control valves etc.,. complete in all respects to the satisfaction of the Engineer-in-Charge.
1
-
-
... More
CHARGES FOR THE WORKS WHICH ARE TO BE CARRIED OUT AS AND WHEN REQUIRED BASIS
-
-
-
... More
Fan Coil Units / Ceiling suspended units (without dismantling) Labour charges for rectification jobs and water servicing of Fan Coil units/ceiling suspended units of all ranges upto 2TR. The scope of work under this work including,without removing the FCUs/CSUs but removing the shutters of units etc., for the servicing of FCU/CSU and after completion of the work and re-fixing the same as per original condition and making it operational. The scope of wrk also includes :
(a) Checking any water leakage from unit, inlet and out Chilled water lines.
(b) Checking of blower, motor units,overhauling the blower unit etc., including clean lubricate
(c) Checking drain pan for any blockage and removal of blockages wherever required.
(d) Cleaning of the Fileters & Y Strainers of F.C.U/CSU.
(e) Inspecting and cleaning of the Condensate drain pan, trap and drain line for free flow of Water.
(f) Checking the operation of inlet/outlet isolation valves and rectifying the defects wherever required.
(g) Checking tightness of electrical connections
(h ) Checking the inter connections, copper piping, canvas and Cooling coils including attending the problems identified during checking. Servicing of fan coil unils/Ceiling suspended unit without dismantling the unit upto 2 TR
1
-
-
... More
Fan Coil Units/ Ceiling suspended units (with dismantling) Labour charges for rectification jobs and water servicing of Fan Coil units /ceiling suspended units of all ranges upto 2TR. The scope of work under this work including, removing the FCU from its existing location and bringing them to the AC Plant service point and after completion of the work again re-fixing the same it is original posisition and making it operational. The scope of work also includes :
(a) Checking any water leakage from unit, inlet and out Chilled water lines.
(b) Checking of blower, motor units etc., including clean lubricate
(c) Checking drain pan for any blockage and removal of blockages wherever required.
(d) Cleaning of the Fileters & Y Strainers of F.C.U.
(e) Inspecting and cleaning of the Condensate drain pan, trap and drain line for free flow of Water.
(f) Checking the operation of inlet/outlet isolation valves and rectifying the defects wherever required.
(g) Checking tightness of electrical connections
(h ) Checking the inter connections, copper piping, canvas and Cooling coils including attending the problems identified during checking. Servicing of fan coil unils/Ceiling suspended unit with dismantling the unit upto 2 TR
1
-
-
... More
Split casing condenser and chiller Pumps of upto 40 HP Labour charges for repairing/overhauling split casing pumps up to 40 HP in all respects including painting if required and put back the unit in working conditions but excluding the Re-winding work.
The work includes:
(a) Checking for any leakage from glands or flange joints.
(b) Checking alignment of pumps, motors and rectifications, wherever required.
(c) Checking coupling conditions including adjusting & replacement, if required.
(d) Checking and cleaning the Pumps, Strainers and Motor Casing. (e) Checking expansion bellows,pump bearings,motor bearings, mechanical seals,pulleys, rubber bushes for coupling,bearing housings,bolts&nuts,anti vibration cushy foots,gaskets,and rectifications, wherever required.
(f) Dismantling of the motor and pump,providing dummy etc., carrying out the required servicing/overhauling as per the laid down procedure and instructions of the Engineer-in-Charge and re-fixing/re-assembling the same after servicing, in its original place and making them in operation/working conditions. a) Upto 7.5HP pump Motor
1
-
-
... More
b) ABOVE 7.5 HP TO 15.00 H.P. MOTOR
1
-
-
... More
c) ABOVE 15.00 HP MOTOR TO 40.00 H.P MOTOR
1
-
-
... More
Labour charges for replacement of Chilled Water Pumps/ Condenser Water Pumps including base channels, anti vibration cushy foots, re-fixing and aligning etc., as per the instructions of the Engineer-in-Charge.
1
-
-
... More
Labour charges for fabrication of M S "C' channel base channels for Chilled Water Pumps/ Condenser Water Pumps of upto 40 Hp including base channels fixing,replacement of anti vibration cushy foots, re-fixing and aligning of pumps etc., as per the instructions of the Engineer-in-Charge.
1
-
-
... More
Motor Labour charges for repairing/overhauling/ replacement of the following HP Motors including its removal from its installation site ,alignment,connections and re-fixing and making the same in working conditions EXCEPT RE-WINDING WORK) a) Upto 01 hp motors
1
-
-
... More
b) Above 01 hp 05 hp motors
1
-
-
... More
c) Above 05 hp 10 hp motors
1
-
-
... More
d) Above 10 hp 15 hp motors
1
-
-
... More
e) Above 15 hp 40 hp motors
1
-
-
... More
Butterfly valves Labour charges for replacement of following sizes butterfly valves by making modifications of the pipe lines as per requirements, welding( if required ) complete in all respects to the satisfaction of the Engineer-in-Charge. IMPORTANT NOTE: The successful tenderer has to make his/their own arrangement for electrodes/welding rods,nut,bolts,flanges etc., required for the welding purpose. a) Upto 50mm
1
-
-
... More
b) Above 50mm to 100mm
1
-
-
... More
c) Above 100mm to 150mm
1
-
-
... More
d) Above 150mm to 200mm
1
-
-
... More
e) Above 200mm to 300mm
1
-
-
... More
Butterfly valves Overhauling Labour charges for Repairing/Overhauling/ Replacement of the following sizes C.I.Gage and Butterfly valves as per the requirements, instructions of the Engineer-in-Charge and as per site conditions. A) Servicing of 200 mm Butterfly valves
1
-
-
... More
Servicing of125 mm Butterfly valves
1
-
-
... More
Servicing of100 mm Butterfly valves
1
-
-
... More
Bearings Labour charges for replacing plumber block bearing/ blower/ shaft including dismantling the same from the site, re-fixing, condensate water drain & base cleaning, aligning the shaft, fan and motor of floor mounted /ceiling suspended unit/AHU/cooling coil/Cold Diffueser/Cold Room Condensers of various capacities indicated below, complete in all respects and installing the same in its original place and making them in working conditions. a) Upto AH-3 (AHU / CSUs Upto 3000 CFM)
1
-
-
... More
b) AH-3 TO AH 7 (AHUs Above 3001 CFM Upto 9000 CFM)
1
-
-
... More
C) AH-9 TO AH 11( AHUs above 9001 CFM Upto 12000 CFM)
1
-
-
... More
Labour Charges for Repairing/ Overhauling / Replacement of following size GI Gage and Butterfly valves as per site conditions: a) Upto 25mm
1
-
-
... More
b) Above 25mm to 100MM
1
-
-
... More
c) Above 100mm to 200mm
1
-
-
... More
Welding work Labour charges for Repairing / Rectification / Welding of Chilled water lines /condenser water lines/ Drain pipe line with necessary fittings as per the site requirements at in any floor or level/height , including making holes on the wall for welding works and closing the same if required the scope of work includes arranging Welding electrodes/ Welding rods,flanges,bolts,nuts etc.,if require by the successful tenderer on their own. IMPORTANT NOTE:
THE WORK WHERE IN INLET OR IN OUT LET LINE ONLY (IN ANY ONE OF THE LINE) CARRIED OUT WILL BE TREATED AS ONE UNIT/EACH LIKE WISE WHERE THE WORK IS DONE IN BOTH LINES WILL ALSO BE TREATED AS ONE UNIT /EACH AND PAYMENT WILL BE MADE ACCORDINGLY. IN SUCH CASES, THE NO SEPARATE PAYMENT FOR THE WORK DONE IN INLET & OUTLINE WILL BE CONSIDERED. a) Upto 25mm size pipe line (per RMT)
1
-
-
... More
b) above 25mm to 60mm size pipe line (per RMT)
1
-
-
... More
c) above 60mm to 80mm size pipe line (per RMT)
1
-
-
... More
d) Above 80mm to 150mm size pipe line ( Per RMT)
1
-
-
... More
e) Above 150mm to 200mm size pipe line ( Per RMT)
1
-
-
... More
f) Above 200mm to 300mm size pipe line ( Per RMT)
1
-
-
... More
MS 'C' class Pipe line Labour charges for removing the drain chocks/ cleaning main drain pipes of following sizes from Cold Rooms, FCUs ( Each Floor's both side drain Header lines), Package Units, AHU's,CSUs, Condenser and Chiller Pumps drain etc a) Upto 25mm size pipe line
1
-
-
... More
b) Above 25mm to 100mm size pipe line
1
-
-
... More
c) Above 100mm to 150mm size pipe line
1
-
-
... More
AHUs/CSUs Cooling Coils(WITH DISMANTLING) Labour charges for water servicing of under mentioned various capacity of Chilled Water Coil, including dismantling of the Coil in its installation sites, bringing them to the AC Plant servicing point, carrying out the required servicing as per the laid down procedure and instructions of the Engineer-in-Charge and re-fixing the same after servicing, in its original place and making them in operation/working conditions.
The scop of work also includes:
a) Cleaning of the Coil with necessary coil cleaner chemicals
(b) Checking of vibration in motor and blower, greasing, oiling,aligning,adjustment of belt tension,VCDs etc.,
(c) Cleaning of AHU Pre-Filters, Blowers and bottom trays,drain tray,drain line etc.,.
(d) Inspecting the condensate drain pane and ensuring for free flow of water.
(e) Observation of all dampers for proper operation and cleaning wherever required.
(f) Checking all the parts for proper functioning complete in all respect. a) Upto AH-3 (AHU / CSUs Upto 3000 CFM)
1
-
-
... More
b) AH-3 TO AH 7 (AHUs Above 3001 CFM Upto 9000 CFM)
1
-
-
... More
c) AH-7 TO AH 11( AHUs above 9001 CFM Upto 12000 CFM)
1
-
-
... More
AHUs/CSUs Cooling Coils tec., repair Labour Charges for repairing/replacing of the following sizes Cooling Coil / Drain tray of OLD Air Handling Unit (AHU) OR Celing Suspended Units ( CSU ).OR Package Units ( PAC) The job includes dismantling the units from its installation site and bringing them to the AC Plant Service Point, repairing the units with brazing etc., and FRP coating on drain tray wherever required, servicing and re-installation of the unit in the original place and making them in use/working conditions. NOTE: For this work, the successful tenderer has to make his own arrangement for the FRP materials required for carrying out the FRP Coating /brazing wherever required. a) Upto AH-3 (AHU / CSUs Upto 3000 CFM)
1
-
-
... More
b) AH-3 TO AH 7 (AHUs Above 3001 CFM Upto 9000 CFM)
1
-
-
... More
c) AH-7 TO AH 11( AHUs above 9001 CFM Upto 12000 CFM)
1
-
-
... More
Repair of Fan coil units/Ceiling suspended units upto 2 TR Labour charges for repair/replacement of COOLING COILS and DRAIN TRY OF FCU/CSUs UPTO 2.TR Capacity. The work includes dismantling the unit from its existing places and bringing the unit to the AC Plant Service Point ,repairing the coil and re-installation of the same it is original place and making/put the unit in working/operation conditions. Including repairing , brazing,etc., if required .
The scope also include carrying out the FRP Coating and Painting wherever required and for which the successful tenderer has to make his/their own arragement for FRP materials and paintings etc., and no separate payment will be made on this account. Ceiling suspended unit / Fan Coil Unit with dismantling the unit upto 2 TR
1
-
-
... More
Fan coil units/Ceiling suspended units upto 2 TR & PAC Units Labour charge for carrying out the Rectification/ Repairing works of Fan Coil Units/ceiling suspended units / PAC upto 2.00TR consisting any or all of (a) arresting the Blower noise of FCU / CSU /PAC Units
(b) Replacement of FCU / CSU/ PAC Blower Motor
(c) Cleaning the drain pipelines
(d) Cleaning of filters and
(e) Servicing the motor including greasing, oling, aligning, replacement of motor, rubber bushes for the FCU motors etc., complete in all respects and re-installation/fixing of the units in its original place and making them in working conditions. Fan coil units / Ceiling suspended unit with dismantling the unit upto 2 TR
1
-
-
... More
Rectification jobs of PUMPS Labour charges for rectification jobs of chilled water pumps and condenser water pumps and its inter related works of
(a) Checking for any leakage from glands or flanges joints
(b) Checking alignment of pumps and motor
(c) Checking coupling condition and making adjustment or replacement
(d) Checking for any abnormal noise and vibrations during running
(e) Checking the drain line and its cleaning and
( f ) Checking the conditions of all seals and bearing houses and making replacement /adjustment depends upon requirements etc., complete.
(g) Checking coupling rubber bushes condition and replace if require.
1
-
-
... More
INSULATED CHILLED WATER PIPE(NITRILE RUBBER INSULATION): Supplying, laying/ fixing, testing and commissioning of following nominal sizes of insulation for chilled water pipe line and condenser water pipe line inside/outside the building (with necessary clamps, vibration isolators and fittings but excluding valves, strainers, gauges etc.) duly insulated with following closed cell elastometric nitrile rubber of minimum 45 Kg / cu m density,thermal conductivity 0.037 W/MK or better at 20 deg mean temperature class ‘O’ insulation applied by suitable rubber based adhesive confirming to standard specification and finally applying 0.63mm aluminium sheet cladding completewith type 3 Grade-I roofing feltstrip (as per IS 1322 AS AMEDED FROM TIME TO TIME) at joints and repairing of damage to building etc. as per specifications and as required complete in all respect. a) Piping of nominal size - 25mm dia. (19mm thick nitrile rubber insulation)
1
-
-
... More
b) Piping of nominal size - 40mm dia. (32mm thick nitrile rubber insulation)
1
-
-
... More
c) Piping of nominal size - 50mm dia. (32mm thick fiber glass insulation)
1
-
-
... More
d) Piping of nominal size - 65mm dia. (32mm thick nitrile rubber insulation)
1
-
-
... More
e) Piping of nominal size - 80mm dia. (32mm thick nitrile rubber insulation)
1
-
-
... More
f) Piping of nominal size - 100mm dia. (32mm thick nitrile rubber insulation)
1
-
-
... More
g) Piping of nominal size - 125mm dia. (32mm thick nitrile rubber insulation)
1
-
-
... More
h) Piping of nominal size - 150mm dia. (32mm thick nitrile rubber)
1
-
-
... More
i) Piping of nominal size - 200mm dia. (32mm thick nitrile rubber)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%