V O Chidambaranar Port Trust Tender
... More
The V O Chidambaranar Port Trust has issued a formal invitation for competitive bids for Periodical Maintenance Of Sewage System And Water Supply System Provided In The Harbour Estate Area And Office Area For A Period Of Two Years In Voc Port in Tuticorin, Tamil Nadu, with an estimated contract value of Rs. 9,17,530. The bid opening date for this tender is 14-02-2025 and the last date for bid submission is 27-02-2025. Interested bidders for V O Chidambaranar Port Trust tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
V O Chidambaranar Port Trust Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date14 Feb 2025
Closing Date27 Feb 2025
Tender Amount₹ 9,17,530 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 31,791Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_VOCPT_226738_1Bid Award Id
ViewTender No
48 CE / RCM BMR / 2024-25Tender Authority
V O Chidambaranar Port Trust ViewPurchaser Address
-Website
http://https://www.vocport.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and fixing R.C.C. Pre-cast slab 75mm thick of various
size in Cement Concrete 1:1.5:3 including all labour, materials, form work, reinforcement, conveyance and fixing the slab etc., complete complying with AISS and as directed by the departmental officers.
70
-
-
... More
Cleaning the Sludge from the Septic tank / Sewage Pump House
Well / Soak Pit / Cesspool etc., and collecting the sludge in the lorry fitted with motor pump at various locations in Port area (Inside & Outside Green Gate / Red Gate) and dumping the same in the Sewage Treatment Plant at Port area including cost of hire charges for tanker lorry fitted with motor pump, labours, fuel, etc., complete and as directed by the departmental officers
465
-
-
... More
Attending repair works to the existing 6" Sluice valve including
cost of removing the shutter & re-fixing the same in position, Cost of Brass bush, gland, gland rope, bolt & nut, gasket, check nut, etc., including all labour charges, Brass welding, Grinding, fixing and functioning etc.., complete and as directed by departmental officers.
24
-
-
... More
Attending repair works to the existing 12" Foot valve including cost of removing the foot valve & refixing the same in position,
including cost of Foot valve leather, SS316 bolt & nut, gasket etc., including all labour charges, Welding, machining, seating surface area, fixing and functioning etc., complete and as directed by departmental officers
2
-
-
... More
Removing blockage in the sewer line by dewatering the sewage water by 5 HP mud pump from the manhole continuously for entire sewer line and flushing the sewer line with fresh water forcibly at point of blockage and removing all the blockages from the sewer line using required tools & plants to make free flow of sewage, cost including the hire charges of 5 HP mud pump with fuel and crew, conveyance of water tankers, labour charges and required tools & plants etc.., complete and as directed by the
departmental officers. (Required water for flushing the sewer line will be supplied by Port at free of cost at Beach water tank)
24
-
-
... More
Attending repair works to the existing 12" Sluice valve including
cost of removing the shutter & re-fixing the same in position, Cost of Brass bush, gland, gland rope, bolt & nut, gasket, check nut, etc., including all labour charges, Brass welding, Grinding, fixing and functioning etc., complete and as directed by departmental officers.
24
-
-
... More
Attending repair works to the existing 8" Sluice valve including
cost of removing the shutter & re-fixing the same in position, Cost of Brass bush, gland, gland rope, bolt & nut, gasket, check nut, etc., including all labour charges, Brass welding, Grinding, fixing and functioning etc.., complete and as directed by departmental officers.
24
-
-
... More
Brick work in Cement Mortar 1:5 (M. Sand (Crushed Stone Sand)) ( One cement, five M. Sand (Crushed Stone Sand)) using chamber burnt bricks for walls in Ground Floor of the building including cost of all materials, labour, curing etc., complete complying with AISS and as directed by the departmental
officers.
30.5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements