Tamilnadu Cooperative Milk Producers Federation Limited Tender
... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Tamilnadu Cooperative Milk Producers Federation Limited Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date9 Jan 2025
Closing Date23 Jan 2025
Tender Amount₹ 33,13,322 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 38,400Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_TCMPF_517621_1Bid Award Id
ViewTender No
13062/Engg.2/2024Tender Authority
Tamilnadu Cooperative Milk Producers Federation Limited ViewPurchaser Address
-Website
http://TamilnaduCooperativeMilkProducersFederationLimited
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
0.00 - 3.30 m - Plain surface
115
-
-
... More
Above Basement - (0.00 - 4.50)
22
-
-
... More
Upto Basement - Plain Surface
151
-
-
... More
GST (Note: The tenderer should quote the amount towards Goods and Service tax (GST) in the appropriate columns in terms of percentage (%). If not quoted, it will be considered that the rate quoted is inclusive of GST.)
1
-
-
... More
Brick work In cement mortar 1:5 (one part cement and five part sand) using second class ground moulded chamber burnt bricks of side9"X4.5"X3" to line, level and to plumb on one face including necessar scaffolding, racking out jenits, curing etc., complete as directed by the Federation officers and as per standard specification
-
-
-
... More
0.00 - 3.30 m - Column surface
143
-
-
... More
Upto Basement - Column Surface
76
-
-
... More
Above Basement - 0.00 - 4.50m
100
-
-
... More
Supplying & erecting structural steel of various section like Joist, channel section and purlin in suitable position inclusive of all labour charges for making joints, clit angles, welding, placing in position etc., as directed by the Federation officers and as per standard specifications.
500
-
-
... More
Reinforced Cement concrete 1:2:4 (one cement, two sand & four course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete.
-
-
-
... More
Plain cement concrete 1:5:10 (one cement, five M-sand & Ten course aggregate) using 40mm size granite broken stones for foundation including dewatering if found necessary and laid in layers of not more than 15 cm Tk for flooring including, rendering the top surface rough to take floor finish etc and including side shuttering if required and compaction curing etc., complete and as per standard specifications.
16
-
-
... More
EARTHWORK EXCAVATION for all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc., complete complying with standard specifications. (0 - 2.00 m)
345
-
-
... More
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors..
64
-
-
... More
Plastering with cement mortor 1:5 (one part cemnet and five part sand) 12mm thick including scaffolding, neatly finishing and curing etc., complete as directed by the Federation officers and as per standard specification.
1080
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements