Tamil Nadu Housing Board Tender
... More
The TNHB has issued a formal invitation for competitive bids for the Tamil Nadu Housing Board project, for Attending Common Repair Works At 120 Boards Rental At Mkb Nagar in Chennai, Tamil Nadu, with an estimated contract value of Rs. 98,000. The bid opening date for this tender is 24-02-2025 and the last date for bid submission is 10-03-2025. Interested bidders for Tamil Nadu Housing Board tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Tamil Nadu Housing Board - TNHB Tender
Opening Date24 Feb 2025
Closing Date10 Mar 2025
Tender Amount₹ 98,000
Costs
EMD
₹ 980Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Attending Common Repair Works At 120 Boards Rental At Mkb Nagar
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_TNHB_527510_1Bid Award Id
ViewTender No
TNHB_SPDI_024_24-25Tender Authority
Tamil Nadu Housing Board ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cleaning of OHT by thorough scrapping two times with brush and bleaching powder inside around the walls and bottom of the OHT walls including bailing out dirty water two times, including cost of brush, bleaching powder and hire charges for bucket, rope etc., and labour charges for cleaning complete in all respects and as directed by the departmental officers.
301.9
-
-
... More
Providing Pest Control treatment to inside of the flats at floor, wood works,windows and doors by means of post construction method that is drilling at the wall floor joint at required intervals and injecting proper soil toxicant emulsion with dilution in to the drills and closing the holes with white cement, spraying chemical formulation on the all windows, doors, switch boxes and all wood works etc. including cost of all matrerials and instruments required such as driller, injector etc, and labour charges for all and as directed by the departmental officers.
114.3
-
-
... More
GST at 18%
1
-
-
... More
5 amps flush type switch
12
-
-
... More
Repairing and replacing of 8 SWG copper wire on wall / below ground levels with necessary ‘U’ Nails, earth work excavation and refilling etc... Including cost of all materials etc.. all complete complying with relevant standard specifications & as directed by the departmental officers.
252
-
-
... More
Replastering the old wall with cement mortor 1:5, 12 mm thick using the river sand including curing and finising neatly complying with standard specification and as directed by the departmental officers
8.76
-
-
... More
Painting the old wall with two coats of weather shield emulsion paint over the wall surface including cost of paint brushes,,glooves,watering,scaffolding etccomplete and as directed by the departmental officers.
77.82
-
-
... More
Sub Total
-
-
-
... More
Replacing of damaged paver block and new interlocking paver block of 63mm thickness using rubber mould and laid , approved make with grey colour including cost of conveyance of interlocking blocks and filling sand and spreading of sand to a thickness of 15cm for cusion below the interlocking blocks and consolidating, vibrating labour charges for laying to proper level slope etc.,all complete and as directed by the departmental officer
4.86
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements