Tamil Nadu Generation And Distribution Corporation Limited Tender

... More
The TANGEDCO has issued a formal invitation for competitive bids for the Tamil Nadu Generation And Distribution Corporation Limited project, for Works Contract For Ht/lt Line Works In West/gobi Sub Division Of Gobi Division in Erode, Tamil Nadu, with an estimated contract value of Rs. 25,00,000. The bid opening date for this tender is 11-03-2025 and the last date for bid submission is 20-03-2025. Interested bidders for Tamil Nadu Generation And Distribution Corporation Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Works
Civil And Construction
Eprocure
Opening Date11 Mar 2025
Closing Date20 Mar 2025
Tender Amount₹ 25,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Works contract for HT/LT line works in West/Gobi Sub division of Gobi Division
Works contract for HT/LT line works in West/Gobi Sub division of Gobi Division
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Fixing of LT Single phase ph X arm

150

-

-

... More
Dismantling of LT pin insulator

200

-

-

... More
Dismantling of stay set

100

-

-

... More
Fixing of HT/LT TI fittings

100

-

-

... More
Re-sagging of HT / LT line with ACSR 7/3.35mm or AAAC 7 /3.15 mm conductor

15

-

-

... More
Labour charges for alteration of Back clamps/Stay Clamp to suit for the works

300

-

-

... More
Drilling of hole in channel only 3/4" & 1" per hole

400

-

-

... More
Loading of poles up to 8 M RCC/PSC poles

100

-

-

... More
Fixing of Aluminium Knob

400

-

-

... More
Dismantling of 'V' X arm(all types), Channel X arm, Guarding X arm

40

-

-

... More
Dismantling of ACSR 7/3.35mm orAAAC 7/3.15 conductor

10

-

-

... More
Dismantling of Aluminium knob

225

-

-

... More
Dismantling of ACSR 7/2.59mm or 7/2.11mm conductor

15

-

-

... More
Dismantling of pole up to 8.0 mtr

40

-

-

... More
Loading of materials

50

-

-

... More
Earthing of pole with pin including burying ,looping and binding

200

-

-

... More
Loading of metal poles ( all sizes)

55

-

-

... More
Excavation of pole pit above 8 Mts PSC/RCC/RSJ Pole by using JCB or manual

100

-

-

... More
Paving of Conductor, stringing, binding, jumpering etc., complete for lines with ACSR 7/4.09 mm

10

-

-

... More
Fixing of LT 3 phase cross arms

300

-

-

... More
Paving of Conductor, stringing, binding, jumpering etc., complete for lines with ACSR 7/3.35 mm or AAAC 7/3.15 mm conductor

12

-

-

... More
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or Manual beyond 100 m

50

-

-

... More
Fixing of LT pin insulators

400

-

-

... More
Unloading of metal poles ( all sizes)

55

-

-

... More
Dismantling of LT 3 phase X arm

100

-

-

... More
Excavation of pit in Hard rock requires without blasting (where houses are located)

50

-

-

... More
Dismantlingof 11KV strain disc

100

-

-

... More
Excavation of pole pit upto 27' (8.0 m) Pole by using JCB or manual

155

-

-

... More
Fixing of LT shackle

465

-

-

... More
Erection of stay set complete

100

-

-

... More
UnLoading of poles above 8 M RCC/PSC poles

60

-

-

... More
Erection of RSJ, Rail and fabricated poles above 9.0m pole by using JCB or manual

40

-

-

... More
Dismantling of Double Pole DP Structure

10

-

-

... More
Dismantling of pole above 8.0 mtr

30

-

-

... More
Sleeve concreting including materials (Cement + river sand/M sand and Blue metals and watering).

10

-

-

... More
Unloading of materials

50

-

-

... More
Fixing of Tapping Xarm

100

-

-

... More
Erection of new transformer for all capacities and HT metering set

20

-

-

... More
Erection of D.P structure with AB switch, top channel, cross bracing, earthing, providing stay including concreting.

10

-

-

... More
Re-sagging of HT / LT with ACSR 7/2.59mm or AAAC 7 /2.50 mm conductor

15

-

-

... More
Releasing of grills from RCC poles

40

-

-

... More
Dismantling of 11 KV/22KV pin insulator

100

-

-

... More
Resagging of HT/LT line with ACSR 7/4.09mm

10

-

-

... More
Fixing of HT "V" cross arms (all types)/Channel cross arms/Guarding Cross arms

100

-

-

... More
Excavation of Stay pit 4.5' to 5' by using JCB or manual

100

-

-

... More
Paving of Conductor, stringing, binding, jumpering etc., complete for lines with ACSR 7/2.59 mm or AAAC 7/2.50mm conductor

12

-

-

... More
Erection of Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel seating channel,belding angle including concreting (Expect erection of Transformer)

12

-

-

... More
Erection of Single pole Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of tapping channel,Transformer bed structure including concreating (Expect erection of Transformer)

26

-

-

... More
Dismantling of LT single phase X arm

50

-

-

... More
Fixing of HT Pin insulator 11 KV

200

-

-

... More
Transporting of poles from road side to pole pit Location including loading and unloading of poles by using JCB or Manual Up to 100 m

50

-

-

... More
Transport of poles/Materials/ conductors /DT/Metering Set and other materials( excluding loading and unloading charges.) below 8 Kms (Plains) (ie) No retrusion charges.

30

-

-

... More
Erection of RCC poles/PSC Poles / Metal poles upto 27'(8.0m) pole by using JCB or manual

155

-

-

... More
Releasing of ACSR/AAAC conductors from conductor drum and coiling ACSR 7/3.35, 7/2.59, AAAC 7/2.50, 7/3.15 MM (Per/Km.)

50

-

-

... More
Fixing of HT 11KV strain Disc

150

-

-

... More
Erection of RCC poles/PSC Poles/metal poles above 8 mtrs pole by using JCB or manual

60

-

-

... More
Loading of poles above 8 m RCC/PSC poles

100

-

-

... More
Dismantling of Double Pole Transformer Structure

5

-

-

... More
UnLoading of poles up to 8 M RCC/PSC poles

60

-

-

... More
Guarding arrangements with Flat guarding including fixing of 2Nos. Cross arms HT/LT

30

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.