Rural Development And Panchayat Raj Department Tender

... More
The PMGSY has issued a formal invitation for competitive bids for the Rural Development And Panchayat Raj Department project, for Dindigul Dist - 80-cgf-2019-2020 - Kodaikanal Block Road Works Tn-05-11 in Dindigul, Tamil Nadu, with an estimated contract value of Rs. 49,72,000. The bid opening date for this tender is 08-10-2019 and the last date for bid submission is 23-10-2019. Interested bidders for Rural Development And Panchayat Raj Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Rural Development And Panchayat Raj Department - PMGSY Tender

Opening Date8 Oct 2019
Closing Date23 Oct 2019
Tender Amount₹ 49,72,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
km 0/0-1/0

99.22

-

-

... More
CC 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete

2.42

-

-

... More
Construction of CC Pavement

-

-

-

... More
Construction of RCC slab culvert At Ch

-

-

-

... More
Plain cement concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete

31.44

-

-

... More
Supplying and foundation basement with filling sand laye r not more 15cm thic weel waterd and compacted complete complying with standard specification

12.35

-

-

... More
Provision expantion joint in between the dirt wall and deck in abutment

10

-

-

... More
PCC 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete

2.03

-

-

... More
Construction of Drainage

-

-

-

... More
Supply and Erection and centering of sides and soffits including supports and strutting up to 3.29m height for place surfaces in all floors with all cross bracing using mild steel sheets of size 90cmX60cm and 10 gauge stiffened welded with mild steel angles of size 25mmX3mm for boarding laid over silver oak ( country wood) poists of size 10cm X6.5cm dia spaced at about 90cm centre to center etc., complete complying with standard specification - Sub Structure

129.96

-

-

... More
km 0/0-1/0

201.82

-

-

... More
Plain cement concrete 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete

28.87

-

-

... More
Plain cement concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete

8.23

-

-

... More
Provision and laying Kraft paper barrying between deck slab and bed block to the full width of seating

3

-

-

... More
Provision for Name Board

1

-

-

... More
Providing and laying Water Bound Macadam Gr.II using 1 cum of 75mm to 22.40mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MoRT&H 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for TOP LAYER

-

-

-

... More
Earthwork excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth etc.,

57.61

-

-

... More
Plain cement concrete 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete

31.65

-

-

... More
Supply of Hectametre Stone of size 0.90x0.15x0.15metre

4

-

-

... More
Supplying and fabrication and placing in position mild steel or ribbed tor steel and all reinforced cement concrete works asper the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification.

0.3

-

-

... More
Supply and Erection and centering of sides and soffits including supports and strutting up to 3.29m height for place surfaces in all floors with all cross bracing using mild steel sheets of size 90cmX60cm and 10 gauge stiffened welded with mild steel angles of size 25mmX3mm for boarding laid over silver oak ( country wood) poists of size 10cm X6.5cm dia spaced at about 90cm centre to center etc., complete complying with standard specification Super Structure

8.47

-

-

... More
Part 1: strengthening to the road for Prakasapuram KCH School Road, Km 0/0-1/10, H/O.Adukkam Estimate Amount Rs.49.72 lakhs

-

-

-

... More
Supplying and fabrication and placing in position mild steel or ribbed tor steel and all reinforced cement concrete works asper the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification.

0.3

-

-

... More
Plain cement concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete

8.23

-

-

... More
Providing and laying Gravel to 100mm compacted thick includng all labour charges for spreading watering and leveling to camber forundulation forundulation of surface etc complete 100% compaction

-

-

-

... More
Supply of Hectametre Stone of size 0.90x0.15x0.15metre

1

-

-

... More
Reinforced of un reinforced, dowel joined at expantion and construction joint only plain cement concrete payment mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum

47.25

-

-

... More
Plain cement concrete 1:4:8 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete

8.23

-

-

... More
Provision expantion joint in between the dirt wall and deck in abutment

10

-

-

... More
Earthwork excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth etc.,

57.61

-

-

... More
PCC 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete

2.03

-

-

... More
Plain cement concrete 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete

31.65

-

-

... More
Supplying and fabrication and placing in position mild steel or ribbed tor steel and all reinforced cement concrete works asper the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification.

0.3

-

-

... More
Clearing the scrub jungle by uprooting including all cutting charges and depositing disposing of the products and clearing as directed by the Departmental Officers including all incidential charges etc., complete in charges etc complete

1452

-

-

... More
km 1/0-2/0

22.5

-

-

... More
Supply and Erection and centering of sides and soffits including supports and strutting up to 3.29m height for place surfaces in all floors with all cross bracing using mild steel sheets of size 90cmX60cm and 10 gauge stiffened welded with mild steel angles of size 25mmX3mm for boarding laid over silver oak ( country wood) poists of size 10cm X6.5cm dia spaced at about 90cm centre to center etc., complete complying with standard specification - Sub Structure

129.96

-

-

... More
CC 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete

2.42

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
km 0/0-1/0

150.07

-

-

... More
Supplying and foundation basement with filling sand laye r not more 15cm thic weel waterd and compacted complete complying with standard specification

12.35

-

-

... More
Construction of RCC slab culvert At Ch

-

-

-

... More
PCC 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete

2.03

-

-

... More
Provision expantion joint in between the dirt wall and deck in abutment

10

-

-

... More
Earthwork excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated

249.25

-

-

... More
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60 Kg for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete

-

-

-

... More
Supply and Erection and centering of sides and soffits including supports and strutting up to 3.29m height for place surfaces in all floors with all cross bracing using mild steel sheets of size 90cmX60cm and 10 gauge stiffened welded with mild steel angles of size 25mmX3mm for boarding laid over silver oak ( country wood) poists of size 10cm X6.5cm dia spaced at about 90cm centre to center etc., complete complying with standard specification Super Structure

8.47

-

-

... More
Plain cement concrete 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete

31.65

-

-

... More
Supplying and foundation basement with filling sand laye r not more 15cm thic weel waterd and compacted complete complying with standard specification

12.35

-

-

... More
Cement concrete 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete - Above sill

23.58

-

-

... More
Provision and Weep holes in brick masonry reinforced CC with 100mm dia pipe laying bed block to the full width of seating

12

-

-

... More
Good gritty gravel behind the abutment & inbetween the wings including all labour charges etc., complete

23.4

-

-

... More
km 0/0-1/0

2700

-

-

... More
Earthwork excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth etc.,

57.61

-

-

... More
Earthwork excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth etc.,

31.44

-

-

... More
Good gritty gravel behind the abutment & inbetween the wings including all labour charges etc., complete

23.4

-

-

... More
Provision and laying Kraft paper barrying between deck slab and bed block to the full width of seating

3

-

-

... More
Providing and laying tack coat over the WBM surface using 4.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MoRT&H specification.

-

-

-

... More
km 1/0-1/1

300

-

-

... More
Supply and Erection and centering of sides and soffits including supports and strutting up to 3.29m height for place surfaces in all floors with all cross bracing using mild steel sheets of size 90cmX60cm and 10 gauge stiffened welded with mild steel angles of size 25mmX3mm for boarding laid over silver oak ( country wood) poists of size 10cm X6.5cm dia spaced at about 90cm centre to center etc., complete complying with standard specification - Sub Structure

129.96

-

-

... More
km 1/0-1/1

300

-

-

... More
Plain cement concrete 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete

28.87

-

-

... More
Good gritty gravel behind the abutment & inbetween the wings including all labour charges etc., complete

23.4

-

-

... More
Provision and laying Kraft paper barrying between deck slab and bed block to the full width of seating

3

-

-

... More
Plain cement concrete 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete

28.87

-

-

... More
Provision and Weep holes in brick masonry reinforced CC with 100mm dia pipe laying bed block to the full width of seating

12

-

-

... More
Supply and Erection and centering of sides and soffits including supports and strutting up to 3.29m height for place surfaces in all floors with all cross bracing using mild steel sheets of size 90cmX60cm and 10 gauge stiffened welded with mild steel angles of size 25mmX3mm for boarding laid over silver oak ( country wood) poists of size 10cm X6.5cm dia spaced at about 90cm centre to center etc., complete complying with standard specification Super Structure

8.47

-

-

... More
Construction of RCC slab culvert At Ch

-

-

-

... More
km 0/0-1/0

2700

-

-

... More
CC 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools etc., complete

2.42

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.