Rural Development And Panchayat Raj Department Tender
... More
The RDPR has issued a formal invitation for competitive bids for the Rural Development And Panchayat Raj Department project, for Strengthening And Five Year Maintenance To The Vilathupatti To Oorapatti Road Km 0/0- 1/5 In Vilathupatti Panchayat (r 438) in Pudukkottai, Tamil Nadu, with an estimated contract value of Rs. 86,00,000. The bid opening date for this tender is 10-06-2025 and the last date for bid submission is 25-06-2025. Interested bidders for Rural Development And Panchayat Raj Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date10 Jun 2025
Closing Date25 Jun 2025
Tender Amount₹ 86,00,000
Costs
EMD
₹ 86,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RDTN_566817_1Tender No
PDKT/NABARDXXXI 2025-26/AVSL01Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
PICKING BT
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4
-
-
-
... More
Km 0/0-1/500
1796.5
-
-
... More
Earth Work
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the em
-
-
-
... More
Km 0/0-1/500
515.59
-
-
... More
Gravel Shoulder
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
-
-
-
... More
Km 0/0 - 1/000
113.16
-
-
... More
Km 1/00 - 1/500
59.3
-
-
... More
WET MIX MACADAM
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250
-
-
-
... More
Km 0/0 - 1/000
560.72
-
-
... More
Km 1/00 - 1/500
277.99
-
-
... More
PRIMER COAT
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., Complete
-
-
-
... More
Km 0/0-1/500
5591.38
-
-
... More
TACK COAT
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete
-
-
-
... More
Km 0/0-1/500
5591.38
-
-
... More
BITUMINOUS CONCRETE
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
... More
Km 0/0 - 1/000
93.46
-
-
... More
Km 1/00 - 1/500
46.34
-
-
... More
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
-
-
-
... More
Km 0/0-1/500
300
-
-
... More
Kilometre Stone
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
-
-
-
... More
Providing KM stones (1.65*0.45*0.15)
1
-
-
... More
Providing HM stones (0.75*0.23*0.10)
6
-
-
... More
Provision for Hard Bed @ch 53-108m
-
-
-
... More
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
11.4
-
-
... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
26.61
-
-
... More
Provision for Bitumen Tar Pad
1
-
-
... More
Cos. Of Retaing wall @ 265 to 300
-
-
-
... More
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
56.7
-
-
... More
Filling with M. sand including cost and conveyance and all labour charges etc completed.
4.73
-
-
... More
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
9.45
-
-
... More
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
73.5
-
-
... More
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
-
-
-
... More
Below sill level
64.11
-
-
... More
Above sill level
108.5
-
-
... More
supplying and filling of course gravel including cost and conveyance to road site and stacking to departmental gauge for premeasurement etc.,complete
23.63
-
-
... More
Provision for Wheep hole Pipes 100mm dia PVC Pipe
1
-
-
... More
Const. of RCC Pipe Culvert @ 0/615
-
-
-
... More
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
21.03
-
-
... More
Filling with M.sand including cost and conveyance and all labour charges etc completed.
2.26
-
-
... More
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
4.57
-
-
... More
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
23.02
-
-
... More
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
-
-
-
... More
Below sill level
22.41
-
-
... More
Above sill level
41.25
-
-
... More
Cost & Supply of RCC Pipe 900mm dia (NP3)
7.5
-
-
... More
supplying and filling of course gravel including cost and conveyance to road site and stacking to departmental gauge for premeasurement etc.,complete
6.78
-
-
... More
Const. of RCC Deck Slab Culvert ( 1.50 x 1.00)@ 1/323
-
-
-
... More
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
63.27
-
-
... More
Filling with M.sand including cost and conveyance and all labour charges etc completed.
3.33
-
-
... More
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
6.66
-
-
... More
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
52.07
-
-
... More
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
-
-
-
... More
Below sill
64.8
-
-
... More
Above sill
82.02
-
-
... More
Supplying and fabrication of steel rods including all cost and conveyance and all labour charges and all other incidental charges.
0.35
-
-
... More
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges etc.complete.
3.31
-
-
... More
C.C. 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges etc.complete.
3.36
-
-
... More
Provision for Weepholes
10
-
-
... More
Const. of RCC Deck Slab Culvert ( 1.50 x 1.00)@ 1/467
-
-
-
... More
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
63.27
-
-
... More
Filling with M.sand including cost and conveyance and all labour charges etc completed.
3.33
-
-
... More
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
6.66
-
-
... More
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
52.07
-
-
... More
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
-
-
-
... More
Below sill
64.8
-
-
... More
Above sill
82.02
-
-
... More
Supplying and fabrication of steel rods including all cost and conveyance and all labour charges and all other incidental charges.
0.35
-
-
... More
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges etc.complete.
3.31
-
-
... More
C.C. 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges etc.complete.
3.36
-
-
... More
Provision for Weepholes
10
-
-
... More
Providing and fixing of cautionary, mandatory and informatory sign board
Providing and fixing of Retro Reflectorised Cautionary, Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5 mm thick Aluminium Sheet
-
-
-
... More
Provision for sign Board
6
-
-
... More
Maintenance of the road
-
-
-
... More
Towards the charges for routline
maintenance of the road work executed
under PMGSY including dressing of berms
by refilling the gully with the earth from
borrow pits, cleaning of wild seasonal
growth on berms, destilting of side drains
and CD works, white washing guard stones,
painting of KM, HM stones, parapets,
cutting of branches of trees, refixing
displaced guard stones, caution boards,
speed limit boards etc., with the periodicity
for the above activities as prescribed in IRCSP-
20:2002 and as directed by the
departmental officers except for the
constructional defects which has to be
rectified by the contractor at his own cost
-
-
-
... More
For the First Year from the date of
completion of work
1.5
33557
-
... More
For the Second Year from the date of
completion of work
1.5
50397
-
... More
For the Third Year from the date of
completion of work
1.5
66989
-
... More
For the Fourth Year from the date of
completion of work
1.5
83994
-
... More
For the Fifth Year from the date of
completion of work
1.5
100491
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%