Rural Development And Panchayat Raj Department Tender
... More
The RDPR has issued a formal invitation for competitive bids for the Rural Development And Panchayat Raj Department project, for Strengthening And Five Year Maintenance To The Ramasamypuram To Mangalanadu Link Road Km 0/0 - 1/3 In Ramasamypuram Panchayat (r 267) in Pudukkottai, Tamil Nadu, with an estimated contract value of Rs. 56,45,000. The bid opening date for this tender is 10-06-2025 and the last date for bid submission is 25-06-2025. Interested bidders for Rural Development And Panchayat Raj Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date10 Jun 2025
Closing Date25 Jun 2025
Tender Amount₹ 56,45,000
Costs
EMD
₹ 57,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RDTN_566890_1Tender No
PDKT/NABARDXXXI 2025-26/ATG17Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
-
-
-
... More
KM 0/0 -1/3
585
-
-
... More
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification
-
-
-
... More
KM 0/0 -1/3
1379.33
-
-
... More
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
-
-
-
... More
Km 0/0 - 1/ 0
564.45
-
-
... More
Km 1/0 - 1/300
168.75
-
-
... More
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., Complete
-
-
-
... More
KM 0/0 -1/3
4888
-
-
... More
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete
-
-
-
... More
KM 0/0 -1/3
4888
-
-
... More
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
... More
Km 0/0 - 1/ 0
94.08
-
-
... More
Km 1/0 - 1/300
28.13
-
-
... More
Providing and laying gravel for side berms including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp
-
-
-
... More
Km 0/0 - 1/ 0
120
-
-
... More
Km 1/0 - 1/300
36
-
-
... More
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
-
-
-
... More
KM 0/0 -1/3
260
-
-
... More
Provision for Hectameterstone
5
-
-
... More
Provision for Kilometerstone
1
-
-
... More
Provision for signboard
5
-
-
... More
Maintenance of the road
-
-
-
... More
Towards the charges for routline
maintenance of the road work executed
under PMGSY including dressing of berms
by refilling the gully with the earth from
borrow pits, cleaning of wild seasonal
growth on berms, destilting of side drains
and CD works, white washing guard stones,
painting of KM, HM stones, parapets,
cutting of branches of trees, refixing
displaced guard stones, caution boards,
speed limit boards etc., with the periodicity
for the above activities as prescribed in IRCSP-
20:2002 and as directed by the
departmental officers except for the
constructional defects which has to be
rectified by the contractor at his own cost
-
-
-
... More
For the First Year from the date of
completion of work
1.3
33557
-
... More
For the Second Year from the date of
completion of work
1.3
50397
-
... More
For the Third Year from the date of
completion of work
1.3
66989
-
... More
For the Fourth Year from the date of
completion of work
1.3
83994
-
... More
For the Fifth Year from the date of
completion of work
1.3
100491
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%