The RDPR has issued a formal invitation for competitive bids for the Rural Development And Panchayat Raj Department project, for Madurai District Construction Of 5 Kld Horizontal Sub Surface Flow In Main Street At Perumalpatty Village And Karadikal Panchayat Thirumangalam Block in Madurai, Tamil Nadu, with an estimated contract value of Rs. 1,82,500. The bid opening date for this tender is 19-03-2025 and the last date for bid submission is 26-03-2025. Interested bidders for Rural Development And Panchayat Raj Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date19 Mar 2025
Closing Date26 Mar 2025
Tender Amount₹ 1,82,500 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying and Filling 10 to 12 mm chips including all cost and conveyance of all meteials to the site ect complete

1.37

-

-

... More
Plastering With Cement Morter 1:4 Mix Using 20 mm HBG Metal including All charges

8.2

-

-

... More
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon

89.59

-

-

... More
Reinforced Cement Concrete 1:1!/2:3 Mix using M.sand including All Labour Charges

0.58

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-

... More
Name of Work:Madurai District Construction of 5 KLD Horizontal Sub Surface Flow in Main Street at Perumalpatty Village And Karadikal Panchayat Thirumangalam Block

-

-

-

... More
Provision for Photo charges

1

-

-

... More
PCC 1:3:6 mix using 20mm metal from approved sources including cost and conveyance rough stones and bond stones including cost of cement which will be supplied departmentally at the departmental section stores and cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental stores to the actual workspot and handling charges for the same at each and all other incidental charges such as baling out water if necessary etc., complete

11.2

-

-

... More
Supplying Fabricating and Placing in position Mild Steel /Ribbed Tor Steel Grills of All Works Uincluding All Charges

46.19

-

-

... More
Supplying and Filling ISS HBG 20 mm metal including all cost and conveyance of all meteials to the site ect complete

2.74

-

-

... More
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.

14.43

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.