The RDPR has issued a formal invitation for competitive bids for the Rural Development And Panchayat Raj Department project, for Mrl07-ecr Thiruvadanai Sp Pattinam Link Road Via Pattamangalam (km 0/0-5/175) in Ramanathapuram, Tamil Nadu, with an estimated contract value of Rs. 1,07,00,000. The bid opening date for this tender is 20-05-2025 and the last date for bid submission is 05-06-2025. Interested bidders for Rural Development And Panchayat Raj Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Rural Development And Panchayat Raj Department - RDPR Tender
Civil And Construction
Road Construction
Eprocure
Opening Date20 May 2025
Closing Date5 Jun 2025
Tender Amount₹ 1,07,00,000
Costs
EMD
₹ 1,28,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RDTN_141448_2Tender No
DIPR/2253/Tender/2025Tender Authority
Rural Development And Panchayat Raj Department ViewPurchaser Address
-Website
http://https://www.tnrd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
-
-
-
... More
Km 0/0-1/0
4.6
-
-
... More
km 1/0-2/0
4.2
-
-
... More
Km 2/0-3/0
4.07
-
-
... More
km 3/0-4/0
3.37
-
-
... More
km 4/0-5/0
3.32
-
-
... More
km 5/0-5/175
0.78
-
-
... More
Applying tack coat over BT surface (not treated with primer) using 2.5 to 3.0 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per
-
-
-
... More
Km 0/0-1/0
3750
-
-
... More
km 1/0-2/0
3750
-
-
... More
Km 2/0-3/0
3750
-
-
... More
km 3/0-4/0
3750
-
-
... More
km 4/0-5/0
3750
-
-
... More
km 5/0-5/175
656.25
-
-
... More
BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
-
-
-
... More
Km 0/0-1/0
112.5
-
-
... More
km 1/0-2/0
112.5
-
-
... More
Km 2/0-3/0
112.5
-
-
... More
km 3/0-4/0
112.5
-
-
... More
km 4/0-5/0
112.5
-
-
... More
km 5/0-6/0
19.69
-
-
... More
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.km 0/0-1/0
-
-
-
... More
Km 0/0-1/0
112.5
-
-
... More
km 1/0-2/0
112.5
-
-
... More
Km 2/0-3/0
112.5
-
-
... More
km 3/0-4/0
112.5
-
-
... More
km 4/0-5/0
112.5
-
-
... More
km 5/0-5/175
19.69
-
-
... More
Road Marking with Hot Applied Thermo plastic Compound with Reflectorising Glass beads on Bituminous Surface
1035
-
-
... More
Supply and fixing of KM stone
5
-
-
... More
Supply and fixing of HM stone
21
-
-
... More
Provision for CIB Name Board.
1
-
-
... More
Providing and fixing of Sign Board.
6
-
-
... More
Maintenance of the road
-
-
-
... More
Towards the charges for routline
maintenance of the road work executed
under PMGSY including dressing of berms
by refilling the gully with the earth from
borrow pits, cleaning of wild seasonal
growth on berms, destilting of side drains
and CD works, white washing guard stones,
painting of KM, HM stones, parapets,
cutting of branches of trees, refixing
displaced guard stones, caution boards,
speed limit boards etc., with the periodicity
for the above activities as prescribed in IRCSP-
20:2002 and as directed by the
departmental officers except for the
constructional defects which has to be
rectified by the contractor at his own cost
-
-
-
... More
For the First Year from the date of
completion of work
5.175
33557
-
... More
For the Second Year from the date of
completion of work
-
50397
-
... More
For the Third Year from the date of
completion of work
-
66989
-
... More
For the Fourth Year from the date of
completion of work
-
83994
-
... More
For the Fifth Year from the date of
completion of work
-
100491
-
... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements